Q1. How to promise the delivery of material in case supplier denies to supply the material?

Ans.

Negotiate with alternate suppliers and ensure timely delivery.

  • Identify alternate suppliers who can provide the required material.

  • Negotiate with them for timely delivery and favorable terms.

  • Ensure that the quality of the material is up to the mark.

  • Communicate the change in supplier to the concerned parties.

  • Monitor the delivery schedule closely to avoid any delays.

Add your answer

Q2. How Transportation orders has been placed?

Ans.

Transportation orders are placed through a centralized system that tracks inventory and delivery schedules.

  • Orders are placed by authorized personnel through the transportation management system

  • The system tracks inventory levels and delivery schedules to ensure timely delivery

  • Orders are assigned to specific carriers based on their availability and capacity

  • The system generates shipping labels and tracking information for each order

  • Transportation costs are calculated and billed ...read more

Add your answer

Q3. What are the general terms of quotation?

Ans.

General terms of quotation refer to the basic elements that should be included in a formal quote.

  • Identification of the seller and buyer

  • Description of the goods or services being quoted

  • Price and payment terms

  • Delivery terms and schedule

  • Validity period of the quote

  • Terms and conditions of the sale

  • Any applicable taxes or fees

  • Acceptance and signature of both parties

Add your answer

Q4. How boiler unit rates has been fixed?

Ans.

Boiler unit rates are fixed based on various factors such as fuel type, boiler size, and efficiency.

  • Boiler unit rates are determined by the cost of fuel used to power the boiler.

  • The size of the boiler also plays a role in determining the unit rate.

  • Efficiency of the boiler is another factor that affects the unit rate.

  • Other factors such as maintenance costs and environmental regulations may also impact the unit rate.

  • Boiler unit rates may vary depending on the region and market ...read more

Add your answer
Discover Cipla interview dos and don'ts from real experiences

Q5. Difference between Purchase order and contract?

Ans.

Purchase order is a document used to request goods or services, while a contract is a legally binding agreement between two parties.

  • Purchase order is a one-time agreement, while a contract is a long-term agreement.

  • Purchase order is used for specific goods or services, while a contract can cover a range of goods or services.

  • Purchase order is usually initiated by the buyer, while a contract can be initiated by either party.

  • Purchase order is not legally binding, while a contract...read more

Add your answer

Q6. Explaination on price variation of metals

Ans.

Price variation of metals is affected by various factors such as supply and demand, geopolitical events, and economic indicators.

  • Supply and demand play a major role in determining the price of metals.

  • Geopolitical events such as wars, sanctions, and trade agreements can impact the price of metals.

  • Economic indicators such as inflation, interest rates, and currency exchange rates can also affect metal prices.

  • For example, the price of gold tends to rise during times of economic u...read more

Add your answer

Q7. How to calculate cycle time in scheduling

Ans.

Cycle time in scheduling is calculated by dividing the total duration of a project by the total number of cycles.

  • Calculate the total duration of the project from start to finish.

  • Determine the total number of cycles required to complete the project.

  • Divide the total duration by the total number of cycles to get the cycle time.

  • Cycle Time = Total Duration / Total Number of Cycles

  • For example, if a project takes 10 days to complete and there are 2 cycles, the cycle time would be 5 ...read more

Add your answer

Q8. Describe the fabrication sequence in manufacturing of pressure vessel

Ans.

Fabrication sequence in manufacturing of pressure vessel involves cutting, forming, welding, testing, and finishing.

  • Cutting of steel plates according to design specifications

  • Forming the plates into desired shape using hydraulic press or rolling machine

  • Welding the formed plates together to create the vessel

  • Testing the vessel for leaks, strength, and other quality parameters

  • Finishing the vessel with painting, insulation, and other final touches

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.0
 • 688 Interview Questions
4.0
 • 362 Interview Questions
3.7
 • 264 Interview Questions
4.0
 • 243 Interview Questions
3.8
 • 188 Interview Questions
4.3
 • 130 Interview Questions
View all
Top Isgec Titan Metal Fabricators Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter