I applied via Approached by Company and was interviewed in Jan 2022. There were 2 interview rounds.
Transportation orders are placed through a centralized system that tracks inventory and delivery schedules.
Orders are placed by authorized personnel through the transportation management system
The system tracks inventory levels and delivery schedules to ensure timely delivery
Orders are assigned to specific carriers based on their availability and capacity
The system generates shipping labels and tracking information for...
General terms of quotation refer to the basic elements that should be included in a formal quote.
Identification of the seller and buyer
Description of the goods or services being quoted
Price and payment terms
Delivery terms and schedule
Validity period of the quote
Terms and conditions of the sale
Any applicable taxes or fees
Acceptance and signature of both parties
Negotiate with alternate suppliers and ensure timely delivery.
Identify alternate suppliers who can provide the required material.
Negotiate with them for timely delivery and favorable terms.
Ensure that the quality of the material is up to the mark.
Communicate the change in supplier to the concerned parties.
Monitor the delivery schedule closely to avoid any delays.
Price variation of metals is affected by various factors such as supply and demand, geopolitical events, and economic indicators.
Supply and demand play a major role in determining the price of metals.
Geopolitical events such as wars, sanctions, and trade agreements can impact the price of metals.
Economic indicators such as inflation, interest rates, and currency exchange rates can also affect metal prices.
For example, ...
Boiler unit rates are fixed based on various factors such as fuel type, boiler size, and efficiency.
Boiler unit rates are determined by the cost of fuel used to power the boiler.
The size of the boiler also plays a role in determining the unit rate.
Efficiency of the boiler is another factor that affects the unit rate.
Other factors such as maintenance costs and environmental regulations may also impact the unit rate.
Boil...
Purchase order is a document used to request goods or services, while a contract is a legally binding agreement between two parties.
Purchase order is a one-time agreement, while a contract is a long-term agreement.
Purchase order is used for specific goods or services, while a contract can cover a range of goods or services.
Purchase order is usually initiated by the buyer, while a contract can be initiated by either par...
I applied via Referral
Fabrication sequence in manufacturing of pressure vessel involves cutting, forming, welding, testing, and finishing.
Cutting of steel plates according to design specifications
Forming the plates into desired shape using hydraulic press or rolling machine
Welding the formed plates together to create the vessel
Testing the vessel for leaks, strength, and other quality parameters
Finishing the vessel with painting, insulation,...
Cycle time in scheduling is calculated by dividing the total duration of a project by the total number of cycles.
Calculate the total duration of the project from start to finish.
Determine the total number of cycles required to complete the project.
Divide the total duration by the total number of cycles to get the cycle time.
Cycle Time = Total Duration / Total Number of Cycles
For example, if a project takes 10 days to c...
Top trending discussions
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
I appeared for an interview in Dec 2020.
Round duration - 40 minutes
Round difficulty - Easy
Given an integer array ARR
of size N
, your task is to find the total number of subsequences in which all elements are equal.
A subsequence of an array i...
Count the total number of subsequences in which all elements are equal in an integer array.
Iterate through the array and count the frequency of each element.
Calculate the total number of subsequences for each element using the formula (frequency * (frequency + 1) / 2).
Sum up the total number of subsequences for all elements and return the result modulo 10^9 + 7.
Tip 1 : Do practice as much as you can
Tip 2 : Coding is key to crack
Tip 1 : It should look nice
Tip 2 : Skills should be mentioned properly
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed in Sep 2021. There was 1 interview round.
I applied via Referral and was interviewed in Apr 2021. There were 5 interview rounds.
I am currently working on developing a mobile application for a client in the hospitality industry.
The application will allow users to make reservations and order food and drinks from their mobile devices.
We are using React Native for the front-end and Node.js for the back-end.
We are also implementing a payment gateway to allow for secure transactions.
The client has requested that the app be available in both iOS and A...
based on 1 interview experience
based on 13 reviews
Rating in categories
Assistant Engineer
5
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Senior Engineer
3
salaries
| ₹8 L/yr - ₹11.5 L/yr |
Project Engineer
3
salaries
| ₹5 L/yr - ₹7.2 L/yr |
Deputy Manager
3
salaries
| ₹10.5 L/yr - ₹11.5 L/yr |
Vice President
3
salaries
| ₹55 L/yr - ₹64.8 L/yr |
TCS
Accenture
Wipro
Cognizant