Filter interviews by
I applied via Approached by Company and was interviewed in Jan 2022. There were 2 interview rounds.
Transportation orders are placed through a centralized system that tracks inventory and delivery schedules.
Orders are placed by authorized personnel through the transportation management system
The system tracks inventory levels and delivery schedules to ensure timely delivery
Orders are assigned to specific carriers based on their availability and capacity
The system generates shipping labels and tracking information for...
General terms of quotation refer to the basic elements that should be included in a formal quote.
Identification of the seller and buyer
Description of the goods or services being quoted
Price and payment terms
Delivery terms and schedule
Validity period of the quote
Terms and conditions of the sale
Any applicable taxes or fees
Acceptance and signature of both parties
Negotiate with alternate suppliers and ensure timely delivery.
Identify alternate suppliers who can provide the required material.
Negotiate with them for timely delivery and favorable terms.
Ensure that the quality of the material is up to the mark.
Communicate the change in supplier to the concerned parties.
Monitor the delivery schedule closely to avoid any delays.
Price variation of metals is affected by various factors such as supply and demand, geopolitical events, and economic indicators.
Supply and demand play a major role in determining the price of metals.
Geopolitical events such as wars, sanctions, and trade agreements can impact the price of metals.
Economic indicators such as inflation, interest rates, and currency exchange rates can also affect metal prices.
For example, ...
Boiler unit rates are fixed based on various factors such as fuel type, boiler size, and efficiency.
Boiler unit rates are determined by the cost of fuel used to power the boiler.
The size of the boiler also plays a role in determining the unit rate.
Efficiency of the boiler is another factor that affects the unit rate.
Other factors such as maintenance costs and environmental regulations may also impact the unit rate.
Boil...
Purchase order is a document used to request goods or services, while a contract is a legally binding agreement between two parties.
Purchase order is a one-time agreement, while a contract is a long-term agreement.
Purchase order is used for specific goods or services, while a contract can cover a range of goods or services.
Purchase order is usually initiated by the buyer, while a contract can be initiated by either par...
Top trending discussions
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Feb 2020. There were 4 interview rounds.
I faced challenges in team dynamics, project deadlines, and adapting to new technologies, which helped me grow professionally.
Navigating team conflicts: I mediated a disagreement between team members that was affecting productivity, leading to a successful resolution.
Meeting tight deadlines: I managed a project with a two-week deadline by prioritizing tasks and delegating effectively, resulting in on-time delivery.
Adap...
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.
Sorry can not disclose
I appeared for an interview in Apr 2017.
based on 2 reviews
Rating in categories
Assistant Engineer
5
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Senior Engineer
3
salaries
| ₹8 L/yr - ₹11.5 L/yr |
Project Engineer
3
salaries
| ₹5 L/yr - ₹7.2 L/yr |
Deputy Manager
3
salaries
| ₹10.5 L/yr - ₹11.5 L/yr |
Vice President
3
salaries
| ₹55 L/yr - ₹64.8 L/yr |
TCS
Accenture
Wipro
Cognizant