I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
Schedule-H is a list of drugs in India that are subject to stricter regulations due to their potential for abuse or misuse.
Schedule-H drugs can only be sold with a prescription from a registered medical practitioner.
These drugs are often narcotics, psychotropic substances, or other highly potent medications.
The sale of Schedule-H drugs is closely monitored to prevent misuse and abuse.
Examples of Schedule-H drugs includ
Top trending discussions
posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.
Rolling margin is used to measure the profitability of a business or project.
It helps in assessing the efficiency of operations and identifying areas for cost reduction.
The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.
For e...
If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.
I will review the drawings and specifications to ensure accuracy.
I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.
I will conduct a site visit to physically verify the quantities and compare them with the drawings.
If there are significant differences, I ...
Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.
Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.
It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.
BBS is prepared based on the structural drawings and specifications.
It includes the diameter, length, shape, and number of reinforcement bars required for the element.
BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.
It is an essential document for t...
Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.
Rate analysis involves breaking down the cost of each item in a construction project.
The cost of materials, labor, and equipment is analyzed to determine the overall cost.
Quantities of each item are measured and multiplied by their respective rates to calculate the cost.
Rate analysis helps in estimating ...
Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.
Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.
It is usually expressed as a percentage of the direct cost.
The margin for OH & Profits varies depending on the nature of the project and market conditions.
For example, if the direct cost of a proje...
The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.
Wastage percentage for reinforcement steel is typically estimated between 2-5%.
Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.
Proper planning, accurate cutting, and careful handling can help minimize wastage.
Examples of wastage include incorrect cu...
The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).
Structural steel is commonly used in the construction of buildings, bridges, and other structures.
The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.
Reinforced steel, also known as reba...
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.
I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.
Seeking new challenges and opportunities for skill development
Leaving for career growth and advancement
Experience and expertise in the field
Ability to contribute effectively to the team and projects
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
posted on 8 Apr 2024
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Assistant Manager
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Highway Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Design Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Feedback Infrastructure Services
Mecon
TCE
Aarvee Associates