Upload Button Icon Add office photos

Filter interviews by

Intercontinental Consultants & Technocrats Senior Highway Engineer Interview Questions, Process, and Tips

Updated 13 Sep 2022

Intercontinental Consultants & Technocrats Senior Highway Engineer Interview Experiences

1 interview found

Round 1 - Technical 

(15 Questions)

  • Q1. Two types of road 1 Flexible pavement 2 Rigid pavement Road working process Surveying, NGL, Encroachment, OGL
  • Q2. 1:- FLEXIBLE PAVEMENT 1 Embankment :- taking thickness about 3M, large size of soil particles 75mm lumps and cloud. 95% compaction Liquid limit <50%, Plasticity limits <25% Swelling and shrinkage <...
  • Q3. WMM:- It is total thickness 300mm compacted by two layer 150mm and 150mm vibratery roller. It is mixture of aggregate 4.75mm to 20mm and binding material stone dust and morum..
  • Q4. Emulsion:- Prime coat :- low viscous cut back bitumen On wmm surfaces area filled by pores.and Void. Tackcoat:- light application bitumen asphalt , emulsion and dilute water on prime Coat
  • Q5. DBM:- Total thicknesses 150mm compacted.by two layer 75mm and 75mm by vibration roller. It is mixture of aggregate 20mm to 28mm. Bitumen VG30 grade.
  • Q6. Tack coat:' light application bitumen, asphalt, emulsion and diluted water on BC surfaces. BC :- TOTAL THICKNESSES 50MM COMPACTED , It is mixture of aggregate 13.1 mm to bitumen VG30 GRADE ue...
  • Q7. Premix carpeting :' toal thicknesses 6 to 8mm , it is mixture of aggregate and gravel spreading and rolling
  • Ans. 

    Premix carpeting is a mixture of aggregate and gravel spread and rolled to a total thickness of 6 to 8mm.

    • Premix carpeting is a type of road surface that is commonly used for low-traffic roads and driveways.

    • It is made by mixing together aggregate and gravel, which are then spread and rolled to create a smooth surface.

    • The total thickness of the premix carpeting is typically between 6 and 8mm.

    • This type of road surface is ...

  • Answered by AI
  • Q8. Laying of bitumen. and aggregate temperature 130 degree celceious to 150 degree celceious Rollins of bitumen and aggregate temperature 80 degree celceious to 100 degree celceious.
  • Ans. 

    Bitumen and aggregate are laid at high temperatures for better bonding and compaction.

    • High temperature improves the workability of bitumen and aggregate.

    • It helps in achieving better bonding and compaction.

    • Rolling at lower temperature ensures that the mixture is not damaged.

    • The temperature range may vary depending on the type of bitumen and aggregate used.

  • Answered by AI
  • Q9. RIGID PAVEMENT 1:- DLC 150MM THICKNESSES COMPACTED , TOLERANCE +_6MM 2:-PQC:' 300MM THICKNESSES COMPACTED ,TOLERANCE +_ 6MM
  • Q10. DLC:- Material sutabilitey 1:- Aggregate size 26.5mm 2:- Max water absorption 2% 3 :- Soundness test:- Naso4=12% Mgso4 =18% 4:- An...
  • Q11. Design procedure:-1: use M15 grade concrete, aggregate and cement ratio 12:2 1 :- The minimum cement content 150kg percum, if fly ash is more than 20% Minimum cement content 120 kg percum 2:- Compressi...
  • Ans. 

    The design procedure for M15 grade concrete using specified ratios and minimum cement content, along with proper handling and curing techniques.

    • Use M15 grade concrete with aggregate and cement ratio of 12:2

    • Minimum cement content of 150kg percum, or 120kg percum if fly ash is more than 20%

    • Compressive strength testing of 5no sample cube concrete after 7 days curing

    • Ensure DLC mix is homogeneous and uniform in premix batch...

  • Answered by AI
  • Q12. PQC:- Material sutabilitey 1:- aggregate size 31.5mm DLC and pqc material suitability is same Water absorption to aggregate shall not be reative.
  • Q13. DESISGN PROCEDURE:- 1;- use. M40 GRADE CONCRETE 2:-Minimum cement content 360kg percum If fly ash is more than 20% the minimum cement contents 310kg percum. 3:- The flexuar strength cement co...
  • Ans. 

    Explanation of design procedure for M40 grade concrete with dowel bars and tie bars.

    • Minimum cement content of 360kg percum for M40 grade concrete

    • Dowel bars of size 32mm S240 length 300mmC/C and PVC dowel sheet size 34mm×100 micron

    • Tie bars of size 12mm dia tor bar length of tie bar 1m and spacing 300mmc/c

    • Premix batching plant material is homogeneous and uniform with workability of less than 25mm+-10mm

    • Separation membrane...

  • Answered by AI
  • Q14. CBR:- Developed by the California divisions State of highway to classify 1- Soil sub grade 2:- GSB Thicknesses of pavement T= (1.75P/CBR- A/3.14) A= p(1 + r)^m+n Supper elevation e + f =v...
  • Q15. National highway 2 to 4 lane Express Way 6 to 8 lane Express Way many smart intelligent features HTMS =high trafic management system VIDS= visual incident deductions system Express Way man...

Interview Preparation Tips

Interview preparation tips for other job seekers - Carriage Way
Single lane=3.75 Km
Multiple lane 3.50 km
Intermediate lane = 5.50m
Double lane= 7.5 m
Three lane = 10.50 m
Four lane =7.5 m + 7.5m
Shoulder 2m to 3.5m
Flexible pavement minimum age 15 year and operating periods whichever more
Rigid pavement minimum age 30year and operating periods whichever more.
4 to 6 lane ROW =60 m
Max widh of vechile as per IRC 2.44m
Longitudinal friction .35 to .40 cofficent
Transverse friction .15 cofficent

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Field related building materials
  • Q2. Building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company,
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What a IS Code of Design Mix ?
  • Ans. 

    IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.

    • IS 456:2000 provides guidelines for plain and reinforced concrete design.

    • IS 10262:2019 outlines the procedure for concrete mix design.

    • Mix design considers factors like workability, strength, and durability.

    • Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).

    • The...

  • Answered by AI
  • Q2. What are the Welding method of steel?
  • Ans. 

    Welding methods for steel include various techniques like MIG, TIG, and Stick welding, each suited for different applications.

    • MIG Welding (Gas Metal Arc Welding) - Uses a continuous wire feed and is ideal for thin to medium thickness steel.

    • TIG Welding (Gas Tungsten Arc Welding) - Provides high precision and is suitable for thin materials and stainless steel.

    • Stick Welding (Shielded Metal Arc Welding) - Versatile and com...

  • Answered by AI
  • Q3. What are the advantage of steel shuttering?
  • Ans. 

    Steel shuttering offers durability, reusability, and precision in construction, enhancing project efficiency and quality.

    • Durability: Steel shuttering can withstand harsh weather conditions and heavy loads, making it suitable for large-scale projects.

    • Reusability: Unlike timber, steel can be reused multiple times, reducing material costs over time.

    • Precision: Steel shuttering provides a high level of accuracy in dimension...

  • Answered by AI
  • Q4. What are the benefits of using Composite Plate?
  • Ans. 

    Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.

    • High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.

    • Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.

    • Design flexibility: Can be molded into complex shapes, allowing for inn...

  • Answered by AI
  • Q5. How do you lay blocks in block work
  • Ans. 

    Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.

    • Prepare the foundation: Ensure the base is level and clean before starting.

    • Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.

    • Lay the first block: Start at a corner, applying mortar to the bottom and sides.

    • Check alignment: Use a level to ensure blocks are straight and even.

    • Stagger ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As a job seeker, it's essential to be proactive and persistent in your job search. Don't quit for opportunities to come to you. Create your own. 1- Network and make Connection. 2- Tailor your application materials. 3- Follow up 4- Continuous improve. 5- Stay positive and motivate.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About site experience

Round 2 - Technical 

(1 Question)

  • Q1. Site execution technical

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cube Compressive achieving Percentage time periods?
  • Ans. 

    Cube compressive achieving percentage time periods

    • The question is asking about the percentage of time periods in which cube compressive strength is achieved

    • Cube compressive strength refers to the ability of a cube-shaped material to withstand compression

    • The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength

    • Examples of data points needed: time periods,

  • Answered by AI
  • Q2. M20 grade and M means and 20 means and unit
  • Q3. 1:1.5:3 ,M-Mix,20 -Compresive strength,N/mm²

Interview Preparation Tips

Interview preparation tips for other job seekers - Be face Bolt don't jerk anyone becoz they also Human

Intercontinental Consultants & Technocrats Interview FAQs

How many rounds are there in Intercontinental Consultants & Technocrats Senior Highway Engineer interview?
Intercontinental Consultants & Technocrats interview process usually has 1 rounds. The most common rounds in the Intercontinental Consultants & Technocrats interview process are Technical.
How to prepare for Intercontinental Consultants & Technocrats Senior Highway Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Intercontinental Consultants & Technocrats. The most common topics and skills that interviewers at Intercontinental Consultants & Technocrats expect are Highways, Expressway, Team Leading, Construction Supervision and Project Management.
What are the top questions asked in Intercontinental Consultants & Technocrats Senior Highway Engineer interview?

Some of the top questions asked at the Intercontinental Consultants & Technocrats Senior Highway Engineer interview -

  1. DESISGN PROCEDURE:- 1;- use. M40 GRADE CONCRETE 2:-Minimum cement content 36...read more
  2. Design procedure:-1: use M15 grade concrete, aggregate and cement ratio 12:2 1...read more
  3. Laying of bitumen. and aggregate temperature 130 degree celceious to 150 deg...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 60 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
Assistant Manager
57 salaries
unlock blur

₹2.9 L/yr - ₹7.2 L/yr

Deputy Manager
57 salaries
unlock blur

₹4.4 L/yr - ₹10.5 L/yr

Assistant Highway Engineer
36 salaries
unlock blur

₹3.6 L/yr - ₹6.1 L/yr

Manager
34 salaries
unlock blur

₹6.2 L/yr - ₹10.8 L/yr

Highway Design Engineer
30 salaries
unlock blur

₹4.2 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Intercontinental Consultants & Technocrats with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview