Filter interviews by
I applied via LinkedIn and was interviewed in Aug 2021. There were 3 interview rounds.
The toughest project in my career was implementing a quality control system for a manufacturing company.
The project involved setting up quality control processes and procedures across multiple departments.
One of the technical problems faced was integrating different software systems used by different departments into a centralized quality control system.
Another challenge was ensuring that the quality control system was...
Top trending discussions
posted on 15 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Company Website
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Walk-in and was interviewed before Nov 2022. There were 2 interview rounds.
I led a team in implementing a new customer relationship management system at my previous company.
Researched and selected the CRM software that best fit the company's needs
Managed a team of developers and analysts to customize and implement the system
Provided training and support to employees on how to use the new CRM system
The priority job of a control engineer is to design, implement, and maintain control systems for various applications.
Designing control systems to meet specific requirements
Implementing control algorithms to regulate processes
Maintaining and troubleshooting control systems to ensure optimal performance
Collaborating with other engineers and stakeholders to integrate control systems into larger systems
Staying updated on ...
I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.
Seismic force depends on the magnitude of an earthquake and the distance from the epicenter.
Seismic force is determined by the magnitude of the earthquake.
The greater the magnitude, the stronger the seismic force.
Seismic force also depends on the distance from the epicenter.
The closer to the epicenter, the stronger the seismic force.
Seismic force can cause buildings and structures to shake or collapse.
I applied via Referral and was interviewed in Dec 2021. There were 4 interview rounds.
Some of the top questions asked at the Intercontinental Consultants & Technocrats Deputy General Manager Quality interview -
Assistant Manager
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Highway Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Design Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Feedback Infrastructure Services
Mecon
TCE
Aarvee Associates