Upload Button Icon Add office photos

Filter interviews by

HIRA FERRO ALLOYS Project Engineer - Civil Interview Questions and Answers

Updated 22 May 2022

HIRA FERRO ALLOYS Project Engineer - Civil Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical any question

Interview Preparation Tips

Interview preparation tips for other job seekers - Structural any type building load find

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Logical aptitude, physical

Round 3 - One-on-one 

(2 Questions)

  • Q1. Self introduction
  • Q2. How did you hear about this position

Interview Questionnaire 

3 Questions

  • Q1. Density of bentonite after flushing of pile bore..?
  • Ans. 

    The density of bentonite after flushing of pile bore depends on various factors such as the type of bentonite used, the amount of water used for flushing, and the duration of flushing.

    • The density of bentonite is typically measured in pounds per gallon (ppg) or kilograms per cubic meter (kg/m³).

    • The density of bentonite after flushing can range from 8.5 to 16 ppg or 1,020 to 1,920 kg/m³ depending on the factors mentioned...

  • Answered by AI
  • Q2. Depth and dia of pile..?
  • Ans. 

    The depth and diameter of a pile depend on the load it needs to support and the soil conditions.

    • The depth of a pile is determined by the depth of the soil layer that can support the load.

    • The diameter of a pile is determined by the load it needs to support and the soil conditions.

    • The type of pile also affects its diameter and depth.

    • For example, a driven pile may have a smaller diameter but greater depth than a bored pil...

  • Answered by AI
  • Q3. What is your job profile in presently working Company..?

HIRA FERRO ALLOYS Interview FAQs

How many rounds are there in HIRA FERRO ALLOYS Project Engineer - Civil interview?
HIRA FERRO ALLOYS interview process usually has 2 rounds. The most common rounds in the HIRA FERRO ALLOYS interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 808 Interviews
JSW Steel Interview Questions
3.9
 • 551 Interviews
Sheenlac Paints Interview Questions
4.6
 • 195 Interviews
ABC Consultants Interview Questions
3.9
 • 167 Interviews
Chegg Interview Questions
4.1
 • 150 Interviews
View all
Accountant
4 salaries
unlock blur

₹2.4 L/yr - ₹2.8 L/yr

Company Secretary
4 salaries
unlock blur

₹3.6 L/yr - ₹16 L/yr

Instrument Engineer
4 salaries
unlock blur

₹3 L/yr - ₹3.4 L/yr

Account Assistant
4 salaries
unlock blur

₹1.6 L/yr - ₹2.4 L/yr

Record Keeper
4 salaries
unlock blur

₹1.2 L/yr - ₹2.2 L/yr

Explore more salaries
Compare HIRA FERRO ALLOYS with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Vedanta Resources

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview