Upload Button Icon Add office photos

Filter interviews by

Hills Cement Company Assistant Engineer Interview Questions and Answers

Updated 13 Feb 2020

Hills Cement Company Assistant Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All technical question like,what is rtd,vfd,level sensor,boot sensor,lrs, limit switch,lt,HT motors,dol,RDOL,star-delta starter,zss,pull code,belts way,and many more question,

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was taken by GM sir,my advice is that at all interview be polite be senceble,

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Software or tool test

Round 2 - Technical 

(2 Questions)

  • Q1. Related to technical question about fabrication.
  • Q2. Tool related question
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Steel and shuttering releted questions
Round 3 - HR 

(1 Question)

  • Q1. Expectation releted questions

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is very good but management is very bed management was not know how to deal with client and how to deal out staff

I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is blinding? Different types of blinds used in o&g?
  • Ans. 

    Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.

    • Temporary or permanent blinds can be used depending on the situation

    • Common types of blinds include spectacle blinds, paddle blinds, and bleed rings

    • Blinding is often used during maintenance or repair work to ensure safety

    • Blinding can also be used to prevent contamination during storage or transportation

    • Blinding can...

  • Answered by AI
  • Q2. Procedures before starting a work in a refinery equipment,
  • Ans. 

    Before starting work in a refinery equipment, certain procedures must be followed.

    • Obtain a work permit

    • Perform a safety check of the equipment

    • Ensure proper personal protective equipment is worn

    • Verify that all valves are in the correct position

    • Confirm that the equipment is properly grounded

    • Check for any leaks or abnormal conditions

    • Communicate with other workers in the area

    • Follow all established procedures and protocols

  • Answered by AI
  • Q3. What will you do if there's an H2S leak and there's no wind movement,
  • Ans. 

    I will follow the emergency response plan and evacuate the area immediately.

    • Activate the alarm system to alert others in the area

    • Put on personal protective equipment (PPE) including a respirator

    • Evacuate the area immediately and move to a safe location

    • Notify emergency services and follow the emergency response plan

    • Monitor the situation and wait for the all-clear signal before returning to the area

  • Answered by AI
  • Q4. From where you'll advice your workers to start unbloting a heat exchanger head?
  • Ans. 

    I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.

    • Start from the top and work your way down

    • Use appropriate tools and safety equipment

    • Follow proper procedures and guidelines

    • Ensure all bolts are properly labeled and accounted for

    • Inspect the gasket and replace if necessary

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, answer what you know.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 2 - HR 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 3 - Technical 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 4 - One-on-one 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't prefer gaja waste of time
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Related to sourcing basics
Round 2 - Technical 

(1 Question)

  • Q1. They have asked basic of sourcing
Round 3 - HR 

(1 Question)

  • Q1. Discussed on salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is good for GETs
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Discussion about the profile
Round 3 - Technical 

(1 Question)

  • Q1. Site reporting manager ask questions as per core relevants.
Round 4 - Client Interview 

(1 Question)

  • Q1. Ask all technical questions regarding the core relevant areas

Interview Preparation Tips

Interview preparation tips for other job seekers - Very easy process
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There was 1 interview round.

Round 1 - Group Discussion 

Concerning previous work experience.

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is the height of top guard rails,mid rails and toe board rails?
  • Ans. 

    The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.

    • The height of top guard rails is typically between 42 and 45 inches above the walking surface.

    • Mid rails are typically located halfway between the top rail and the walking surface.

    • Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.

    • Specific...

  • Answered by AI
  • Q2. What is safe working load and formula?
  • Ans. 

    Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.

    • SWL is determined by factors such as material strength, design, and intended use.

    • Formula for SWL varies depending on the type of equipment or structure.

    • For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.

    • It is important to always follow the manufacturer's...

  • Answered by AI
  • Q3. Job role and duties of HSE engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good and very soon joining offer was given.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Steel and shuttering releted questions
Round 3 - HR 

(1 Question)

  • Q1. Expectation releted questions

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is very good but management is very bed management was not know how to deal with client and how to deal out staff

Tell us how to improve this page.

Fast track your campus placements

View all
Hills Cement Company Assistant Engineer Salary
based on 17 salaries
₹2.2 L/yr - ₹4.2 L/yr
21% less than the average Assistant Engineer Salary in India
View more details

Hills Cement Company Assistant Engineer Reviews and Ratings

based on 3 reviews

3.7/5

Rating in categories

4.7

Skill development

3.2

Work-life balance

2.5

Salary

3.9

Job security

2.7

Company culture

2.7

Promotions

3.7

Work satisfaction

Explore 3 Reviews and Ratings
Engineer
20 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Assistant Engineer
17 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Area Sales Manager
14 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Assistant Manager
12 salaries
unlock blur

₹3.6 L/yr - ₹10 L/yr

Assistant Engineer Mechanical
11 salaries
unlock blur

₹2 L/yr - ₹2.6 L/yr

Explore more salaries
Compare Hills Cement Company with

UltraTech Cement

4.2
Compare

Ambuja Cements

3.9
Compare

ACC

3.9
Compare

Shree Cement

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview