Round 1 - Technical 

(2 Questions)

  • Q1. Which equipment work you?
  • Q2. Alignment work process
  • Ans. 

    Alignment work process involves ensuring all components are properly positioned and adjusted for optimal performance.

    • Alignment work includes measuring and adjusting components to ensure they are in the correct position.

    • Proper alignment is crucial for the efficient operation of machinery and equipment.

    • Regular maintenance and checks are necessary to ensure alignment is maintained over time.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions will be asked on previous company roles and responsibilities.
  • Q2. Depends upon previous experience.
Round 2 - Technical 

(2 Questions)

  • Q1. Basics on structure and finishings
  • Q2. Questions on structure and finishings

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for what u wrote in resume.

Interview Questionnaire 

1 Question

  • Q1. How to provide fall arresting system in high rise storry
  • Ans. 

    Fall arresting system in high rise story can be provided through various means.

    • Use of safety nets

    • Installation of guardrails

    • Use of personal fall arrest systems

    • Proper training and education of workers

    • Regular inspection and maintenance of equipment

  • Answered by AI

I appeared for an interview in Aug 2022.

Round 1 - Technical 

(14 Questions)

  • Q1. Two types of road 1:- Flexible pavements 2:- Rigid pavement Surveying, NGL, Enchrochment, OGL
  • Q2. FLEXIBLE PAVEMENT 1:- Embankment:- taking thickness 3m compacted .approximate,as per site conditions. Large size of soil particles 75mm lumps and cloud. Liquid limit <50% Plastic limit <25% Swelling a...
  • Q3. 2:- Subgrade:- Total thickness 500mm compacted two layer 250mm &250mm vibration roller. Large size of soil particles 50mm lumps and cloud, Effective CBR as per design Compaction :- 97% Subgrade grad...
  • Q4. Emulsion :- 1 :- prime coat :- low viscous cut back bitumen on wmm surfaces area and filling Up pores, voids . 2:- Tack coat:- Light application bitumen, asphalt, emulsion, and diluted water on the...
  • Q5. DBM:- it total thickness 150mm two layer compacted 75mm&75 mm, aggregate size 20mm to. 28mm,VG30 Grade bitumen .
  • Q6. Emulsion:- Tackcoat :- Light application of. Bitumen, asphalt, emulsion, and dilute water on the Surfaces area of DBM.
  • Q7. BC :- Total thickness 40mm/ 50mm compacted. It is mixture of aggregate chips 13.1mm. and bitumen VG30 grade. Seal coat :- Total thicknesses of 6 to 8mm Mix with bitumen, gravel,and coars sand.
  • Q8. Bituminous laying temperature 130 degree celceious to 150 degree celceious. Bituminous rolling temperature 80 degree celceious to 100 degree celceious.
  • Ans. 

    Bituminous laying temperature is 130-150°C and rolling temperature is 80-100°C.

    • Bituminous laying requires higher temperature than rolling.

    • Temperature range ensures proper compaction and adhesion.

    • Temperature can vary based on the type of bitumen and aggregate used.

    • Proper temperature control is crucial for quality bituminous pavement.

  • Answered by AI
  • Q9. RIGID PAVEMENT:-All process is a same above embankment to GSB. DLC:-150MM THICKNESSES TOLERANCE +/_6MM COMACTED PQC PAVEMENT:- 300MM THICKNESSES TOLERANCE +/-6MM COMPACTED
  • Q10. DLC:- Material suitability 1:- Aggregate size is 26.5 mm 2:-water absorption 2% max 3:- Soundness test:- ..Naso4= 12% Mgso4=18% 4:...
  • Ans. 

    Material suitability criteria for aggregate in construction projects.

    • Aggregate size should be 26.5 mm or less.

    • Water absorption should not exceed 2%.

    • Soundness test should show Naso4 not more than 12% and Mgso4 not more than 18%.

    • Angle of abrasion should be less than 35% with max FI & EI less than 35%.

    • Equivalent weight of sand should not be less than 50%.

    • Aggregate should not be alkaline reactive.

    • MDD & MCC should be as per

  • Answered by AI
  • Q11. DESIGN PROCEDURE. 1:-Use M15 grade concete. Aggregate and cement ratio 12:1 2:- The minimum cement content 150 kg/ cum. If the fly ash more than 20% the minimum cement contents 120 kg/cum. 3:-compre...
  • Ans. 

    The design procedure for DLC mix includes using M15 grade concrete, minimum cement content of 150 kg/cum, and achieving a compressive strength of at least 10 MPA after 7 days of curing.

    • Use M15 grade concrete with aggregate and cement ratio of 12:1

    • Minimum cement content of 150 kg/cum, or 120 kg/cum if fly ash content is over 20%

    • Achieve a compressive strength of at least 10 MPA after 7 days of curing

    • DLC mix should be hom...

  • Answered by AI
  • Q12. PQC :- Total thicknesses 300mm compacted tolerance +_6mm Material sutabilitey:- 1:- Aggregate size 31.5mm Water absorption to GSB DlC is same for PQC.
  • Ans. 

    The question is about the suitability of aggregate size and water absorption for PQC with a total thickness of 300mm and tolerance of +/-6mm.

    • Aggregate size of 31.5mm is suitable for PQC with a total thickness of 300mm and tolerance of +/-6mm.

    • Water absorption to GSB DLC being the same for PQC is also suitable.

    • The suitability of the material is important for the successful completion of the project.

  • Answered by AI
  • Q13. DESINGN PROCEDURE:- 1:- The minimum cement content 360 kg/ cum, if the fly ash is more than 2o% The minimum cement content 310 kg percum. 2:-The flexuar strength of cement concete after 28day curing...
  • Ans. 

    The design procedure for cement concrete includes minimum cement content, strength requirements, dowel bar and tie bar specifications, and surface preparation and curing techniques.

    • Minimum cement content of 360 kg/cum if fly ash is more than 20%, and 310 kg/cum otherwise

    • Flexural strength of cement concrete after 28-day curing should be 4.5 MPa, and compressive strength should be 40 MPa

    • Dowel bar size of 32mm dia and 300...

  • Answered by AI
  • Q14. National highyway =2 to 4 lane Expressway. =6 to lane Construction coast of National 8 to 10 core /km Expressway construction coast= 14 core to 16core/ km

Interview Preparation Tips

Interview preparation tips for other job seekers - Expressway many smart and intlegent featue
HTMS - High traffic management system
VIDS:- Visual icedent deduction system
Many facilities in Expressway
1:- Excess rap
2;- line divider
3:-Grade seperation
4 Elevated section
Expressway is not multiple lane. It connected national highway
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. What about yourJob ?
  • Q2. My job is everything provide safety
  • Q3. What's your self ?
  • Q4. This is my all job relationship details
  • Q5. Which hieght need work at height?
  • Ans. 

    Work at height is typically considered to be any task performed above ground level, such as on ladders, scaffolding, or roofs.

    • Work at height typically refers to tasks performed above ground level

    • Common examples include working on ladders, scaffolding, or roofs

    • Height requirements may vary depending on the specific job or industry

  • Answered by AI
  • Q6. Ground level to 1.8 mtr
  • Ans. 

    The question is likely referring to the height range for safety measures or regulations.

    • This height range is commonly used in safety regulations for fall protection.

    • Safety measures such as guardrails or safety harnesses may be required for working at this height.

    • Training on proper use of safety equipment is essential for workers at this height.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview shairing totally Good experience

I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. They are asking general details about your experience and background
Round 3 - Technical 

(1 Question)

  • Q1. They will give one task for us to justify our experience and skills whether it was suitable for their needs.

Interview Preparation Tips

Interview preparation tips for other job seekers - Give positive and straight forward reply to all their questions
Complete the task as per the interviewer requirement
Don't feel shy or nervous
Friendly environment for the job seekers
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Safety related question work at height. Lifting Plan
  • Q2. Log out Tag out related question

Interview Preparation Tips

Interview preparation tips for other job seekers - i share my openion my interview question I advise my experience before interview to prepare and confidence.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Tell about experience
  • Q2. Salary expectation
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is RDBMS system
  • Ans. 

    RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.

    • Organizes data into tables with rows and columns

    • Uses SQL for querying and managing data

    • Supports ACID properties for data consistency

    • Examples: MySQL, Oracle Database, SQL Server

  • Answered by AI

Skills evaluated in this interview

Interview Preparation Tips

Round: TECHNICAL ROUND TEST
Experience: A 45 mins round which consisted of 30 mins of core questions and 15 mins of data structures.  It was a mix of test on our knowledge .

Round: HR Interview
Experience: Most of the questions were based on general knowledge and many of them were from the resume provides by me

General Tips: It is always advisable to be prepared with certain set of general questions which make it easier to answer.
Skill Tips: Focus on your Study.. Revise the subject that you have studied at the time of Interview
Skills: Technical Skills
College Name: IIT MADRAS

Hills Cement Company Interview FAQs

How many rounds are there in Hills Cement Company Senior Foreman interview?
Hills Cement Company interview process usually has 1 rounds. The most common rounds in the Hills Cement Company interview process are Technical.

Tell us how to improve this page.

Hills Cement Company Senior Foreman Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

J&F Interview Questions
3.7
 • 30 Interviews
Eversendai Interview Questions
3.7
 • 28 Interviews
J K Fenner Interview Questions
3.9
 • 27 Interviews
View all

Fast track your campus placements

View all
Engineer
20 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Assistant Engineer
17 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Area Sales Manager
14 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Assistant Manager
12 salaries
unlock blur

₹3.6 L/yr - ₹10 L/yr

Assistant Engineer Mechanical
11 salaries
unlock blur

₹2 L/yr - ₹2.6 L/yr

Explore more salaries
Compare Hills Cement Company with

Patel Infrastructure

3.9
Compare

CTS Consulting & Technical Support

3.7
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview