I applied via Walk-in and was interviewed in Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. BBS of as per drawing and shuttering coast and time bond
  • Ans. 

    BBS refers to Bar Bending Schedule which is used to calculate the steel reinforcement required in a concrete structure. Shuttering cost and time bond are related to the formwork used for casting concrete.

    • BBS is important to ensure the strength and durability of the concrete structure.

    • Shuttering cost and time bond are important factors to consider in the overall project cost and timeline.

    • Proper planning and execution of...

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. Estimate coasting excursions of construction team
  • Ans. 

    Coasting excursions of construction team can be estimated based on past data and project requirements.

    • Analyze past data of similar projects to estimate coasting excursions

    • Consider the size and complexity of the project

    • Take into account the experience and skill level of the construction team

    • Factor in any potential delays or unforeseen circumstances

    • Regularly monitor and adjust estimates as the project progresses

  • Answered by AI
  • Q2. Planning estimate coasting excursion of team
  • Ans. 

    Estimating the cost of team's excursion during planning

    • Identify the purpose and scope of the excursion

    • Determine the number of team members and their travel expenses

    • Consider accommodation, meals, transportation, and activities

    • Factor in any contingency expenses

    • Use historical data or industry benchmarks to validate estimates

  • Answered by AI
  • Q3. Items wise rate and labour rate and covering rate as per area
  • Ans. 

    The question is asking for the rates of items, labor, and coverage per area.

    • Items rate refers to the cost of materials needed for the project.

    • Labor rate refers to the cost of the workers involved in the project.

    • Covering rate refers to the amount of area that can be covered by the materials.

    • Examples of items rate include the cost of cement, steel, and wood.

    • Examples of labor rate include the cost of carpenters, electrici...

  • Answered by AI
Round 4 - Aptitude Test 

After interviews expected salary only

Interview Preparation Tips

Interview preparation tips for other job seekers - BBS estimate costing billing items wise and scheduling and ects

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before May 2017.

Interview Questionnaire 

4 Questions

  • Q1. Good discussion with accounts team
  • Q2. Having good discussion with team
  • Q3. Good discussion for salary and others
  • Q4. Good company for working

I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Mainframe Interview COBOL vsam restart process
  • Ans. 1. Delete the existing file. 2. Create a new cluster. 3. Repro to copy in 3rd step
  • Answered Anonymously
  • Q2. How to resolve sb37 Increase the space by twice at first if it didn't fix then we can use volume counter to increment the no of extend
  • Ans. 

    To resolve sb37, increase space by twice and use volume counter to increment extend if needed.

    • Increase space by twice at first

    • If issue persists, use volume counter to increment extend

    • Ensure adequate space is available before running job

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in all the topics in COBOL, JCL and DB2

Skills evaluated in this interview

I applied via Recruitment Consultant and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. All about technical details ypi worked on
  • Q2. Perl database questions
  • Q3. Perl array handling questions
  • Q4. Perl object oriented programming
  • Q5. Automation framework you worked on
  • Ans. 

    I have worked on a custom automation framework using Selenium and TestNG.

    • The framework was designed to support both UI and API testing.

    • It had a modular structure with reusable components.

    • We used Jenkins for continuous integration and delivery.

    • The framework was integrated with JIRA for test management and reporting.

    • We also implemented parallel testing to save time and increase efficiency.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident and give your best

Skills evaluated in this interview

I applied via campus placement at University of Petroleum and Energy Studies (UPES), Dehradun and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. One - one interview and sometimes ZAM sessions to filter out candidates
  • Q2. Tell me about yourself Strengths & Weaknesses technical

Interview Preparation Tips

Interview preparation tips for other job seekers - What ever you answer just Be Confident &
Be Clear

I applied via LinkedIn and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technically. Material operation
  • Q2. Basic, Previous work experience

Interview Questionnaire 

2 Questions

  • Q1. How did you worked there? And what was the procedure of working ?
  • Q2. In purchasing the the material what will be be your priorities, cost control or fulfilling to the requirements at the same time?

I applied via Naukri.com

Interview Questionnaire 

3 Questions

  • Q1. About my work at previous company.
  • Q2. Questions were mostly based on c++ and core java. Comparative analysis between both, oops concepts, basic cpp and java codes, inverted star pattern program, abstract classes..
  • Q3. Few questions were also based on my certifications I had mentioned in my resume, so make sure you know what you have written in Resume.

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay calm, interviewers are motivating, they understand the pressure of interview so even they try to ease you out. And last but not the least, every interview can be made you way, just make sure you are confident about things mentioned in Resume.

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

High Tech Construction Interview FAQs

How many rounds are there in High Tech Construction interview for experienced candidates?
High Tech Construction interview process for experienced candidates usually has 4 rounds. The most common rounds in the High Tech Construction interview process for experienced candidates are Technical, Aptitude Test and Resume Shortlist.
How to prepare for High Tech Construction interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at High Tech Construction. The most common topics and skills that interviewers at High Tech Construction expect are Civil Engineering, Quantity Surveying, Rate Analysis, Site Execution and Site Planning.
What are the top questions asked in High Tech Construction interview for experienced candidates?

Some of the top questions asked at the High Tech Construction interview for experienced candidates -

  1. BBS of as per drawing and shuttering coast and time b...read more
  2. Items wise rate and labour rate and covering rate as per a...read more
  3. Estimate coasting excursions of construction t...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 High Tech Construction interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

High Tech Construction Reviews and Ratings

based on 3 reviews

3.1/5

Rating in categories

2.1

Skill development

3.0

Work-Life balance

2.1

Salary & Benefits

3.1

Job Security

2.1

Company culture

2.1

Promotions/Appraisal

3.1

Work Satisfaction

Explore 3 Reviews and Ratings
Civil Engineer
4 salaries
unlock blur

₹2.9 L/yr - ₹3 L/yr

Civil Site Engineer
3 salaries
unlock blur

₹2.4 L/yr - ₹4.2 L/yr

Senior Survey Engineer
3 salaries
unlock blur

₹0.5 L/yr - ₹4.8 L/yr

Civil Site Supervisor
3 salaries
unlock blur

₹2.3 L/yr - ₹2.3 L/yr

Explore more salaries
Compare High Tech Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Technologies

3.7
Compare

Tata Projects

4.3
Compare

L&T Construction

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview