Types of waterproofing include membrane, cementitious, crystalline, bituminous, and polyurethane.
Membrane waterproofing involves applying a thin layer of waterproof material over the surface.
Cementitious waterproofing uses cement-based materials to create a barrier against water.
Crystalline waterproofing penetrates the concrete and forms crystals to block water.
Bituminous waterproofing involves using bitumen-based mate...
The cement mortar ratio used for plaster work is typically 1:4 to 1:6.
The most common ratio for plaster work is 1 part cement to 4 parts sand.
In some cases, a 1:6 ratio (1 part cement to 6 parts sand) may be used for a smoother finish.
The ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
They ask question on SFD AND BMD
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
4
salaries
| ₹6.5 L/yr - ₹7.2 L/yr |
Project Manager
4
salaries
| ₹7.2 L/yr - ₹22 L/yr |
Site Engineer
4
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Civil Site Engineer
4
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Civil Supervisor
4
salaries
| ₹1.2 L/yr - ₹1.8 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies