Upload Button Icon Add office photos

HBL Power Systems

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

HBL Power Systems Project Engineer Interview Questions and Answers

Updated 30 Sep 2023

HBL Power Systems Project Engineer Interview Experiences

1 interview found

Project Engineer Interview Questions & Answers

user image shraddha patange

posted on 30 Sep 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all Resume tips
Round 2 - Aptitude Test 

General aptitude quantitative

Round 3 - One-on-one 

(2 Questions)

  • Q1. Electrical fundamentals
  • Q2. Transformers , star and delta connections

Interview Preparation Tips

Interview preparation tips for other job seekers - Get thorough of basics

Project Engineer Jobs at HBL Power Systems

View all

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About circuit breaker, transformer.
  • Q2. Single line diagrams, layout, substation calculation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please go through substation calculation and equipment.

I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is your key achievement ? Either your study or professional
  • Q2. What you think about company ?
  • Q3. Where you see yourself in company ?
  • Q4. Why we select you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't panic or hesitate or stress
Opportunities never ends

Interview Questionnaire 

3 Questions

  • Q1. What is FMEA and CP,CPK
  • Ans. 

    FMEA is a risk assessment tool used to identify and mitigate potential failures. CP and CPK are statistical measures of process capability.

    • FMEA stands for Failure Mode and Effects Analysis

    • It is used to identify potential failures in a process or product

    • CP and CPK are statistical measures of process capability

    • They are used to determine if a process is capable of producing products within specification limits

    • CPK is a mor...

  • Answered by AI
  • Q2. What is your ambitions
  • Q3. How can grow a industry in QMS
  • Ans. 

    Industry growth in QMS can be achieved by implementing efficient quality management systems and promoting their benefits.

    • Developing and implementing effective QMS policies and procedures

    • Providing training and education to employees on QMS

    • Encouraging continuous improvement and innovation in QMS

    • Promoting the benefits of QMS to customers and stakeholders

    • Ensuring compliance with industry standards and regulations

    • Collaborat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be aware and give idea of every concern.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Regards lithium ion battery what is soc what is soh pre-charge cell chemistry
  • Ans. 

    SOC refers to the state of charge of a battery, SOH refers to the state of health, pre-charge is the initial charging process, and cell chemistry refers to the type of chemicals used in the battery.

    • SOC is the amount of charge remaining in a battery, expressed as a percentage of its maximum capacity.

    • SOH is a measure of a battery's overall health and its ability to hold a charge over time.

    • Pre-charge is the initial chargi...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Last company related why are you join this organization'' what are your job responsibilities in last company?

Interview Preparation Tips

Interview preparation tips for other job seekers - nothing no just focus on your last compoany profile what are you doing in last comaopny your major challenges face in last companinies
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Mostly on projects and resume
Round 2 - Technical 

(1 Question)

  • Q1. Discussion with Department head

Interview Preparation Tips

Topics to prepare for Luminous Power Technologies Senior Engineer interview:
  • Power Electronics

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. GD&T QUESTION? Technical question?
  • Q2. GD&T- Geometric dimensioning & Tolerancing

Interview Preparation Tips

Interview preparation tips for other job seekers - Very through with technical knowledge.
Good knowledge of practical.
Confidence will add advantage.

I applied via LinkedIn and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. TELL ME ABOUT YOURSELF
  • Q2. TELL ME ABOUT YOU ? TECHNICAL

Interview Preparation Tips

Topics to prepare for Genus Power Infrastructures Senior Engineer interview:
  • BASIC ELECTRICAL
  • Metering
  • Energy Audit
  • TYPE TESTING
  • PRODUCT VALIDATION
Interview preparation tips for other job seekers - TELL ME ABOUT YOURSELF , TECHNICAL QUALIFICATIONS,
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I was interviewed before Feb 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. Good technical support Havells team
  • Q2. HR madem I would pray that before leaving any employee from the company, you should know about him, what is wrong with him, please, wrong has happened with me too.
  • Q3. There are some things which we do not know, the company which does not teach us, it is best and nothing else.

Interview Preparation Tips

Interview preparation tips for other job seekers - Havells is an excellent company, regarded as one of the best for employees. They prioritize their workforce more than many other companies. Havells stands out as the leading electrical company.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. Self introduction, Academic verification.
  • Q2. About your self, Genral query.
  • Q3. About interview schedule

Interview Preparation Tips

Interview preparation tips for other job seekers - First thanks to naukri. Com team..
Given me opportunity
Contribute & help others!
anonymous
You can choose to be anonymous

HBL Power Systems Interview FAQs

How many rounds are there in HBL Power Systems Project Engineer interview?
HBL Power Systems interview process usually has 3 rounds. The most common rounds in the HBL Power Systems interview process are Resume Shortlist, Aptitude Test and One-on-one Round.
How to prepare for HBL Power Systems Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at HBL Power Systems. The most common topics and skills that interviewers at HBL Power Systems expect are AutoCAD, Communication Skills, Electrical Drawing, Electricals and ISO Documentation.
What are the top questions asked in HBL Power Systems Project Engineer interview?

Some of the top questions asked at the HBL Power Systems Project Engineer interview -

  1. Transformers , star and delta connecti...read more
  2. Electrical fundament...read more

Recently Viewed

INTERVIEWS

HBL Power Systems

No Interviews

INTERVIEWS

Omnicom Media Group

5.6k top interview questions

SALARIES

Exide Industries

SALARIES

Uno Minda Kyoraku

SALARIES

Uno Minda Kyoraku

INTERVIEWS

HBL Power Systems

No Interviews

SALARIES

Exide Industries

INTERVIEWS

Lenskart

No Interviews

LIST OF COMPANIES

HBL Power Systems

Locations

INTERVIEWS

Omnicom Media Group

No Interviews

Tell us how to improve this page.

HBL Power Systems Project Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Havells Interview Questions
4.0
 • 209 Interviews
Exide Industries Interview Questions
3.5
 • 169 Interviews
KEI Industries Interview Questions
4.2
 • 54 Interviews
RR kabel Interview Questions
4.1
 • 45 Interviews
Finolex Cables Interview Questions
3.8
 • 40 Interviews
View all
HBL Power Systems Project Engineer Salary
based on 23 salaries
₹2.1 L/yr - ₹5 L/yr
30% less than the average Project Engineer Salary in India
View more details

HBL Power Systems Project Engineer Reviews and Ratings

based on 6 reviews

3.7/5

Rating in categories

2.9

Skill development

2.7

Work-life balance

2.4

Salary

3.4

Job security

2.7

Company culture

2.5

Promotions

3.0

Work satisfaction

Explore 6 Reviews and Ratings
Project Engineer

Hyderabad / Secunderabad

0-1 Yrs

Not Disclosed

Explore more jobs
Engineer
109 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
105 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Service Engineer
54 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Design Engineer
44 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Production Engineer
42 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare HBL Power Systems with

Exide Industries

3.5
Compare

Su-Kam Power Systems

3.6
Compare

Amara Raja Energy & Mobility

4.1
Compare

Luminous Power Technologies

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview