Upload Button Icon Add office photos

Filter interviews by

HBL Power Systems Project Engineer Interview Questions and Answers

Updated 30 Sep 2023

HBL Power Systems Project Engineer Interview Experiences

1 interview found

Project Engineer Interview Questions & Answers

user image shraddha patange

posted on 30 Sep 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General aptitude quantitative

Round 3 - One-on-one 

(2 Questions)

  • Q1. Electrical fundamentals
  • Q2. Transformers , star and delta connections

Interview Preparation Tips

Interview preparation tips for other job seekers - Get thorough of basics

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Round 1 - Aptitude Test 

Good but not very good finally selected

Round 2 - Technical 

(5 Questions)

  • Q1. Question from all subjects
  • Q2. Quantum efficency , vswr
  • Q3. Transmission line
  • Q4. All topic related to microwave
  • Q5. Digital communication and ckt

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare all the topic which is in resume
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Quantitative aptitude, Logical reasoning

Round 2 - Technical 

(1 Question)

  • Q1. What is production planning, what is supply chain, what is prime mover?
  • Ans. 

    Production planning involves creating a schedule for manufacturing goods, supply chain is the network of organizations involved in producing and delivering a product, prime mover is the initial force that sets a process in motion.

    • Production planning is the process of scheduling and coordinating all the tasks necessary to manufacture a product.

    • Supply chain refers to the network of companies involved in producing and del...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What do you know about cables
  • Ans. 

    Cables are used to transmit electrical signals or power between devices.

    • Cables are made up of one or more conductors surrounded by insulation.

    • Different types of cables include coaxial, twisted pair, and fiber optic.

    • Cables are used in various industries such as telecommunications, networking, and power distribution.

  • Answered by AI
  • Q2. Explain about your project work
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell few words about KEi Industries
  • Ans. 

    KEi Industries is a leading manufacturer of electrical cables and wires in India.

    • Established in 1968

    • Offers a wide range of products including power cables, control cables, and house wires

    • ISO 9001 certified

    • Supplies to various industries such as power, oil & gas, and infrastructure

    • Known for quality and reliability

  • Answered by AI
  • Q2. How you fit for this job
Round 3 - HR 

(2 Questions)

  • Q1. What is your expected salary
  • Q2. Can you work anywhere in India

Interview Preparation Tips

Interview preparation tips for other job seekers - KEI is a leading cable manufacturing company. Keep the basic knowledge on cables
Prepare to work any where in india
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via GL and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. All about Project Management experience with case scenarios
Round 2 - One-on-one 

(1 Question)

  • Q1. More about Strategies, CSAT, etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Prepared on JD and moreover on the experience with real time case scenarios
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Document-related & salary related
  • Q2. Location-related & Bike minority

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic Electrical & Electronics questions
1. what is current.
2. DTR full structure
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Round 1 - Aptitude Test 

Good but not very good finally selected

Round 2 - Technical 

(5 Questions)

  • Q1. Question from all subjects
  • Q2. Quantum efficency , vswr
  • Q3. Transmission line
  • Q4. All topic related to microwave
  • Q5. Digital communication and ckt

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare all the topic which is in resume
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Quantitative aptitude, Logical reasoning

Round 2 - Technical 

(1 Question)

  • Q1. What is production planning, what is supply chain, what is prime mover?
  • Ans. 

    Production planning involves creating a schedule for manufacturing goods, supply chain is the network of organizations involved in producing and delivering a product, prime mover is the initial force that sets a process in motion.

    • Production planning is the process of scheduling and coordinating all the tasks necessary to manufacture a product.

    • Supply chain refers to the network of companies involved in producing and del...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. About your Past Experience
  • Q2. Your knowledge about Cables & workings of UG cable project
  • Q3. Knowledge of safety protocol during construction.
  • Q4. Some general awareness questions.
  • Q5. Your letter writing skills
  • Q6. Focus on your personal attitude

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through in detailed with your resume,Since KEI basically works for UG Cable projects and some Sub Station. You should have knowledge of UG cable works,go through the technical specifications of cable,Sub Station equipment.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. BOQ preparations
  • Q2. Billing conditions
  • Ans. 

    Billing conditions refer to the terms and conditions related to payment for goods or services provided.

    • Billing conditions may include payment due dates, late fees, and accepted forms of payment.

    • They may also specify the frequency of billing, such as monthly or quarterly.

    • In some cases, billing conditions may be negotiated between the provider and the client.

    • For example, a software development company may require a depos...

  • Answered by AI
  • Q3. 60% running for supply
  • Q4. Final customer billing
  • Q5. 30% supply 90% erection
  • Q6. Closer billing condition
  • Ans. 

    Closer billing condition refers to the payment terms that are agreed upon between the client and the service provider.

    • It specifies when the payment is due and under what conditions

    • It is usually agreed upon before the project starts

    • It can be based on milestones or time-based

    • Example: 50% payment upon completion of design phase and remaining 50% upon project completion

  • Answered by AI
  • Q7. 10% for supply 10% for erection

HBL Power Systems Interview FAQs

How many rounds are there in HBL Power Systems Project Engineer interview?
HBL Power Systems interview process usually has 3 rounds. The most common rounds in the HBL Power Systems interview process are Resume Shortlist, Aptitude Test and One-on-one Round.
How to prepare for HBL Power Systems Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at HBL Power Systems. The most common topics and skills that interviewers at HBL Power Systems expect are AutoCAD, Communication Skills, Electrical Drawing, Electricals and ISO Documentation.
What are the top questions asked in HBL Power Systems Project Engineer interview?

Some of the top questions asked at the HBL Power Systems Project Engineer interview -

  1. Transformers , star and delta connecti...read more
  2. Electrical fundament...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Havells Interview Questions
4.0
 • 194 Interviews
Exide Industries Interview Questions
3.5
 • 163 Interviews
KEI Industries Interview Questions
4.2
 • 51 Interviews
RR kabel Interview Questions
4.1
 • 41 Interviews
Finolex Cables Interview Questions
3.8
 • 38 Interviews
View all
HBL Power Systems Project Engineer Salary
based on 20 salaries
₹2.1 L/yr - ₹4.8 L/yr
34% less than the average Project Engineer Salary in India
View more details

HBL Power Systems Project Engineer Reviews and Ratings

based on 6 reviews

4.0/5

Rating in categories

4.1

Skill development

3.7

Work-Life balance

3.0

Salary & Benefits

3.8

Job Security

3.6

Company culture

3.1

Promotions/Appraisal

3.6

Work Satisfaction

Explore 6 Reviews and Ratings
Engineer
106 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Senior Engineer
102 salaries
unlock blur

₹2.5 L/yr - ₹8.4 L/yr

Service Engineer
49 salaries
unlock blur

₹1 L/yr - ₹4.2 L/yr

Design Engineer
44 salaries
unlock blur

₹2 L/yr - ₹7.3 L/yr

Production Engineer
41 salaries
unlock blur

₹1.5 L/yr - ₹4.8 L/yr

Explore more salaries
Compare HBL Power Systems with

Exide Industries

3.5
Compare

Su-Kam Power Systems

3.5
Compare

Amara Raja Energy & Mobility

4.2
Compare

Luminous Power Technologies

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview