Filter interviews by
I was interviewed in Jan 2022.
I was interviewed in Jan 2022.
Top trending discussions
I applied via Referral and was interviewed in Oct 2024. There were 6 interview rounds.
I have over 10 years of experience in graphic design, specializing in branding and digital marketing.
Started my career as a junior designer at a marketing agency
Managed a team of designers at a tech startup
Freelanced for various clients in the fashion industry
Currently working as a creative director at a design firm
This round involved a practical design task.
Task:
Create a mock design for a Xiaomi product promotion, ensuring the output aligns with the brand’s identity while showcasing creativity and innovation.
I conducted thorough research on Xiaomi's brand guidelines and values to ensure my designs were in line with their identity.
Studied Xiaomi's brand guidelines and values
Incorporated Xiaomi's color palette and typography in my designs
Ensured consistency with Xiaomi's design language across all touchpoints
Sought feedback from Xiaomi's branding team to ensure alignment
I applied via Campus Placement and was interviewed in Nov 2024. There were 4 interview rounds.
Long programming round in the Chennai office - 3 hours.
use case scenario will be provided: need to sketch any diagrams like uml/class/ER diagrams but not flow chart.
45 min for diagram and presentation to Pannel(each Pannel: 10 students with 1-3 Pannel members) once your presentation and modifications are approved. van proceed with programming(implementation of the use case).
I applied via Walk-in and was interviewed in Nov 2024. There were 6 interview rounds.
Experienced engineer with a background in mechanical and electrical engineering, specializing in project management and problem-solving.
Bachelor's degree in Mechanical Engineering from XYZ University
5+ years of experience working in the automotive industry
Proficient in CAD software such as SolidWorks and AutoCAD
Led a team of engineers to successfully launch a new product line
The toolroom is typically organized in a hierarchical structure with a manager overseeing toolmakers and machinists.
Typically led by a Toolroom Manager who oversees the operations
Toolmakers and machinists report to the Toolroom Manager
May have specialized teams for different types of tools or machinery
Collaborates closely with engineering and production departments
Mold maintenance involves regular cleaning, inspection, and repair of molds used in manufacturing processes.
Regularly clean molds to prevent buildup of residue or contaminants
Inspect molds for wear and tear, cracks, or other damage
Repair any issues found during inspection to ensure molds function properly
Store molds properly when not in use to prevent damage or contamination
Encourage a positive culture that fosters the development of new ideas and activities for improvement.
Corrective action is taken to address an existing issue, while preventive action is taken to avoid potential issues in the future.
Corrective action is reactive, addressing problems that have already occurred.
Preventive action is proactive, aiming to prevent problems from happening in the first place.
Corrective action focuses on fixing the root cause of a problem.
Preventive action focuses on identifying and eliminating ...
Preventive maintenance is scheduled maintenance performed on a regular basis to prevent breakdowns, while predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is scheduled at regular intervals to prevent breakdowns.
Predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is time-based, while predictive maintenance is c...
Breakdown maintenance is a type of maintenance where equipment is only repaired after it has broken down.
Breakdown maintenance is reactive in nature, as repairs are only done after a breakdown occurs.
It can lead to increased downtime and production losses.
This type of maintenance is usually more costly compared to preventive maintenance.
Examples include fixing a machine only when it stops working or repairing a vehicle
The frequency of preventive maintenance varies depending on the equipment and industry standards.
Frequency of preventive maintenance is typically determined by equipment manufacturer recommendations.
Some industries may have specific regulations or standards that dictate the frequency of preventive maintenance.
Factors such as usage, environmental conditions, and criticality of the equipment can also influence the freque...
Lifter pad and lifter are different components used in mechanical systems.
Lifter pad is a component used to support and lift heavy objects, while lifter is a device used to lift and move objects vertically.
Lifter pads are often made of rubber or other materials to provide cushioning and grip, while lifters can be hydraulic, pneumatic, or mechanical.
Lifter pads are stationary and provide a stable base for lifting, while...
The frequency of tool life refers to how often a tool needs to be replaced or maintained.
Frequency of tool life is determined by factors such as material being worked on, cutting speed, and tool material.
Higher cutting speeds or harder materials may require more frequent tool changes.
Regular maintenance and monitoring can help extend tool life and reduce frequency of replacements.
I was interviewed in Aug 2024.
posted on 13 Jan 2025
I applied via Job Portal and was interviewed in Dec 2024. There were 3 interview rounds.
posted on 31 Jan 2025
I applied via Approached by Company and was interviewed in Dec 2024. There were 2 interview rounds.
Interview experience
based on 11 reviews
Rating in categories
Electrical Engineer
4
salaries
| ₹4.5 L/yr - ₹6 L/yr |
Electrician
4
salaries
| ₹1.8 L/yr - ₹5.2 L/yr |
Senior Instrument Engineer
4
salaries
| ₹5.2 L/yr - ₹9.1 L/yr |
Accounts Clerk
4
salaries
| ₹2.8 L/yr - ₹3.8 L/yr |
Turbine DCS Operator
4
salaries
| ₹4.1 L/yr - ₹4.6 L/yr |
Balrampur Chini Mills
Dhampur Sugar Mills
Triveni Engineering & Industries
EID Parry (India)