i
H.G. Infra Engineering
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
I applied via Campus Placement
Communication Colleagues
I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.
H.G. Infra Engineering interview questions for designations
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 22 Apr 2022
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
posted on 24 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
REACH compliance material refers to substances that comply with the European Union's REACH regulation.
REACH stands for Registration, Evaluation, Authorization, and Restriction of Chemicals.
REACH compliance material refers to substances that have been registered with the European Chemicals Agency (ECHA) and meet the requirements of the REACH regulation.
These substances are considered safe for use in the European Union.
E...
posted on 11 Jul 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.
The percentage of coupler and rebar lapping varies depending on the project specifications and design requirements.
The percentage of coupler and rebar lapping is determined by the engineer or designer based on the project specifications.
The percentage can range from 25% to 100% depending on the design requirements.
Coupler lapping is typically used in situations where the rebar cannot be overlapped due to space constrai...
posted on 31 Dec 2022
I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
posted on 16 Feb 2024
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
I am currently working at XYZ Company as an Assistant Manager.
Currently working at XYZ Company
Position: Assistant Manager
The quantity of binding wire required for 1 ton of steel work depends on various factors such as the type of binding wire used, the thickness of the steel bars, and the binding technique.
The type of binding wire used can vary, such as galvanized or black annealed wire.
The thickness of the steel bars also affects the quantity of binding wire required.
The binding technique, whether it is single or double binding, will de...
The cost of material and labor for a door frame with the size of 3"*4"*7' depends on various factors.
The cost of material will depend on the type of wood or material used for the door frame.
The cost of labor will depend on the hourly rate of the workers and the time required to complete the installation.
Additional costs may include transportation, tools, and any customization or finishing required.
To provide an accurat...
The pressure of CPVC pipe during water testing varies depending on the specific application and industry standards.
The pressure of CPVC pipe during water testing is typically measured in pounds per square inch (psi).
The specific pressure requirements may vary based on the intended use of the CPVC pipe, such as residential plumbing or industrial applications.
Industry standards, such as ASTM D1785 for CPVC pipes, provide...
The brand of CP sanitary used in my current project is XYZ.
The brand XYZ is known for its high-quality and durable CP sanitary products.
We chose XYZ brand for its wide range of options and competitive pricing.
The CP sanitary products from XYZ have been performing well in our project.
We have received positive feedback from the users regarding the XYZ brand.
based on 4 interviews
1 Interview rounds
based on 37 reviews
Rating in categories
Assistant Manager
133
salaries
| ₹4.2 L/yr - ₹13.2 L/yr |
Senior Engineer
91
salaries
| ₹4.1 L/yr - ₹8.7 L/yr |
Assistant Engineer
78
salaries
| ₹2.9 L/yr - ₹4.6 L/yr |
Engineer
73
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Structural Engineer
66
salaries
| ₹2.6 L/yr - ₹5.4 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon