Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Gupta Power Infrastructure Team. If you also belong to the team, you can get access from here

Gupta Power Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Gupta Power Infrastructure Interview Questions, Process, and Tips

Updated 25 Feb 2025

Top Gupta Power Infrastructure Interview Questions and Answers

Gupta Power Infrastructure Interview Experiences

Popular Designations

12 interviews found

I applied via Referral and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. Power factor improvement numerical
  • Ans. 

    Power factor improvement involves reducing reactive power and increasing active power to improve efficiency.

    • Power factor is the ratio of active power to apparent power

    • Improving power factor reduces energy costs and improves system efficiency

    • Methods for improving power factor include capacitor banks, synchronous motors, and static VAR compensators

  • Answered by AI
  • Q2. Transformers EMF equation
  • Q3. 3 pH induction motor slip ring and squeal cage motor difference
  • Ans. 

    3-phase induction motor slip ring and squirrel cage motor differ in rotor construction and starting torque.

    • Slip ring motor has external resistors and brushes to control rotor current and torque, while squirrel cage motor has a simple rotor with copper bars.

    • Slip ring motor has high starting torque and is used in heavy load applications like cranes and elevators, while squirrel cage motor has low starting torque and is u...

  • Answered by AI
  • Q4. Shunt motor
  • Q5. Cable layout
  • Q6. Auto transformers
  • Q7. Starting principal and speed control method of slip ring and squeal cage motor
  • Ans. 

    Slip ring motors use external resistors for starting and speed control, while squirrel cage motors rely on the number of poles and frequency for speed control.

    • Slip ring motors have external resistors that are gradually removed to increase speed

    • Squirrel cage motors rely on the number of poles and frequency for speed control

    • Slip ring motors are used in applications where high starting torque is required

    • Squirrel cage moto...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-

Financial Consultant Interview Questions asked at other Companies

Q1. What are the entries happen in Production process of product
View answer (1)

Assistant Manager Interview Questions & Answers

user image ARUN KUMAR TRIPATHY

posted on 25 Feb 2025

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't even think to join .Reject on first chance.

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (88)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.

SAP MM Executive Interview Questions asked at other Companies

Q1. Do you know about computer operatoring
View answer (1)

Gupta Power Infrastructure interview questions for popular designations

 Accountant

 (1)

 Production Manager

 (1)

 Electrical Engineer

 (1)

 Assistant Manager

 (1)

 SAP MM Executive

 (1)

 Financial Consultant

 (1)

 Senior Project Engineer

 (1)

 Store Incharge

 (1)

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never join the company
Salary not paid for more than 4 months to employees and company is on the verge of closing

Assistant Manager - Legal Interview Questions asked at other Companies

Q1. How can you handle the cases in critical situations?
View answer (2)

Interview Questions & Answers

user image Anonymous

posted on 14 Feb 2022

I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please explain your job responsibilities and authorities.

Production Manager Interview Questions & Answers

user image NIRBHAY KUMAR

posted on 12 Jul 2023

Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2022. There were 3 interview rounds.

Interview Preparation Tips

Topics to prepare for Gupta Power Infrastructure Production Manager interview:
  • Technical sound be clear
Interview preparation tips for other job seekers - Prepare to very hard interview, work

Production Manager Interview Questions asked at other Companies

Q1. Production, Maintenance, Quality and Safety. Out of four, tell me the most important and least important thing for you and why?
View answer (10)

I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. What is About your self
  • Q2. What is your previous Experience tell me ?
  • Q3. Why you leave the present job?
  • Q4. What is your expectation joining new company
  • Q5. Why you think new company is better previous company not better?
  • Q6. What is your future goal ?
  • Q7. What is your best food?
  • Ans. 

    My best food is lasagna.

    • I love the combination of pasta, meat, and cheese.

    • It's a comfort food that reminds me of home.

    • I enjoy experimenting with different recipes and ingredients.

    • Some of my favorite variations include spinach and mushroom, or a spicy sausage and pepper version.

  • Answered by AI
  • Q8. What song should you listen to?
  • Q9. How many family member do you have

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview time follow the question

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

I applied via Naukri.com and was interviewed before Sep 2021. There were 5 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview level is so good and exciting.Career boosting questions and test should be given

Senior Business Development Executive Interview Questions asked at other Companies

Q1. If you see 2-3 year you work with idfc first but you will not get any growth in your caree or salary as well..
View answer (2)

I applied via Naukri.com and was interviewed in Apr 2021. There were 6 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Give your project presentation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Show your genuinely knowledge in interview.
Management like PPT and data mapping.
If you are experienced kindly ask for better salary hike

Senior Project Engineer Interview Questions asked at other Companies

Q1. Types of road:- 1 Flexible pavements .... .. . 2 Rigid pavements Flexible pavement:- embankment thickness 3m,large size soil particles 75mm lumps and cloud. Liquid limit <50% ,plastic limit<25%, swelling and shrnkag<50%, cbr as per... read more
View answer (2)

Accountant Interview Questions & Answers

user image Anonymous

posted on 25 Feb 2022

Interview Preparation Tips

Interview preparation tips for other job seekers - Company jaudge your attitude towards a Complicated situation.
Correct Answer is 30% only.
Your experience should be in Your attitude.

Accountant Interview Questions asked at other Companies

Q1. What journal is made when purchase requisition is created
View answer (25)
Contribute & help others!
anonymous
You can choose to be anonymous

Gupta Power Infrastructure Interview FAQs

How many rounds are there in Gupta Power Infrastructure interview?
Gupta Power Infrastructure interview process usually has 2-3 rounds. The most common rounds in the Gupta Power Infrastructure interview process are HR, Resume Shortlist and Technical.
How to prepare for Gupta Power Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Gupta Power Infrastructure. The most common topics and skills that interviewers at Gupta Power Infrastructure expect are Business Loan, CADD, Coordination, Credit Analysis and Credit Underwriting.
What are the top questions asked in Gupta Power Infrastructure interview?

Some of the top questions asked at the Gupta Power Infrastructure interview -

  1. 3 pH induction motor slip ring and squeal cage motor differe...read more
  2. Starting principal and speed control method of slip ring and squeal cage mo...read more
  3. what is your best fo...read more

Recently Viewed

INTERVIEWS

Utility Powertech

No Interviews

REVIEWS

Maharashtra State Electricity Distribution Company

No Reviews

INTERVIEWS

SAEL Industries Limited

No Interviews

REVIEWS

Maharashtra State Electricity Distribution Company

No Reviews

REVIEWS

Maharashtra State Electricity Distribution Company

No Reviews

REVIEWS

Maharashtra State Electricity Distribution Company

No Reviews

REVIEWS

Maharashtra State Electricity Distribution Company

No Reviews

REVIEWS

Maharashtra State Electricity Distribution Company

No Reviews

REVIEWS

Maharashtra State Electricity Distribution Company

No Reviews

Tell us how to improve this page.

Gupta Power Infrastructure Interview Process

based on 12 interviews

Interview experience

3.3
  
Average
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 419 Interviews
KEC International Interview Questions
4.0
 • 299 Interviews
ABB Interview Questions
4.1
 • 235 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Sterlite Power Interview Questions
4.0
 • 25 Interviews
View all

Gupta Power Infrastructure Reviews and Ratings

based on 337 reviews

3.0/5

Rating in categories

2.9

Skill development

3.0

Work-life balance

2.4

Salary

2.7

Job security

2.6

Company culture

2.3

Promotions

2.8

Work satisfaction

Explore 337 Reviews and Ratings
Electrical Site Engineer
61 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Site Engineer
47 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Project Manager
37 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Assistant Project Manager
36 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Assistant Manager
33 salaries
unlock blur Lock Unlock

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Gupta Power Infrastructure with

Sterlite Power

4.0
Compare

KEC International

4.0
Compare

Kalpataru Projects International

4.1
Compare

Adani Transmission

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview