Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Gupta Power Infrastructure Team. If you also belong to the team, you can get access from here

Gupta Power Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Gupta Power Infrastructure Assistant Manager - Legal Interview Questions and Answers

Updated 17 Oct 2023

Gupta Power Infrastructure Assistant Manager - Legal Interview Experiences

1 interview found

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Previous experience based
  • Q2. Why is there a need to change

Interview Preparation Tips

Interview preparation tips for other job seekers - Never join the company
Salary not paid for more than 4 months to employees and company is on the verge of closing

Interview questions from similar companies

I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. Starting from curriculum to end up with experience and some small personal details in between
  • Answered Anonymously
  • Q2. Where do you see yourself in next 5 year
  • Ans. Look at the company hierarchy and look at yourself as growth perspective.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Please ensure that your resume and skills set should be matched with JD it will boost your chance to get a call.

All the best for future.

I appeared for an interview in Sep 2020.

Interview Questionnaire 

1 Question

  • Q1. There was many technical and project related questions they asked me.

Interview Preparation Tips

Interview preparation tips for other job seekers - We should prepare for competency as per our core functions

Interview Questionnaire 

1 Question

  • Q1. Debt equity ratio

Interview Questionnaire 

1 Question

  • Q1. VRV system, mep related, fire fighting,

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How will you analyse the total consumption of diesel in equipment
  • Ans. 

    To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.

    • Collect data on equipment usage and fuel consumption

    • Calculate fuel efficiency by dividing fuel consumption by equipment usage

    • Compare fuel efficiency across different equipment to identify outliers

    • Identify factors that may affect fuel efficiency, such as maintenance or operator behavior

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be precise and explain whatever you know

I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer wanted to best knowledge of your profile and your communication skills .
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Working Experience in electrical project
  • Ans. 

    I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.

    • Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.

    • Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.

    • Collaborated wi...

  • Answered by AI
  • Q2. Working process of project
  • Ans. 

    The working process of a project involves planning, execution, monitoring, and completion.

    • Planning phase includes defining project goals, scope, and deliverables.

    • Execution phase involves assigning tasks, managing resources, and implementing the project plan.

    • Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.

    • Completion phase involves finalizing deliverables, conducting proj

  • Answered by AI
  • Q3. From survey execution up to billing and closer
  • Ans. 

    The question is asking about the process from survey execution to billing and closure.

    • Survey execution involves designing and distributing surveys to collect data.

    • Data collected from surveys is then analyzed and processed.

    • Based on the analysis, billing is done for the services provided.

    • Finally, the project is closed, and any remaining tasks or documentation are completed.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Normal project technical quostions
Round 3 - HR 

(1 Question)

  • Q1. Typical HR question

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company salary on time good benefits

Interview Questionnaire 

2 Questions

  • Q1. They will be asking from your past experience and previous project.Situation based question is given preference .
  • Q2. Be yourself, mainly confidence they want to see in ur expression and be truthful.

Gupta Power Infrastructure Interview FAQs

How many rounds are there in Gupta Power Infrastructure Assistant Manager - Legal interview?
Gupta Power Infrastructure interview process usually has 2 rounds. The most common rounds in the Gupta Power Infrastructure interview process are Resume Shortlist and HR.

Tell us how to improve this page.

Gupta Power Infrastructure Assistant Manager - Legal Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

ReNew Interview Questions
4.2
 • 89 Interviews
Vestas Interview Questions
4.2
 • 88 Interviews
Jakson Group Interview Questions
4.2
 • 81 Interviews
Siemens Energy Interview Questions
4.1
 • 75 Interviews
Waaree Energies Interview Questions
3.9
 • 59 Interviews
Inox Wind Interview Questions
3.7
 • 38 Interviews
Sterlite Power Interview Questions
4.0
 • 26 Interviews
View all

Gupta Power Infrastructure Assistant Manager - Legal Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

1.0

Work-life balance

1.0

Salary

1.0

Job security

1.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Electrical Site Engineer
61 salaries
unlock blur

₹1.6 L/yr - ₹4.1 L/yr

Site Engineer
47 salaries
unlock blur

₹1.5 L/yr - ₹3.8 L/yr

Project Manager
37 salaries
unlock blur

₹4.4 L/yr - ₹9.5 L/yr

Assistant Project Manager
36 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Assistant Manager
33 salaries
unlock blur

₹4 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Gupta Power Infrastructure with

Vestas

4.2
Compare

ReNew

4.2
Compare

Siemens Gamesa Renewable Power Private Limited

4.1
Compare

Adani Green Energy

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview