Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Gupta Power Infrastructure Team. If you also belong to the team, you can get access from here

Gupta Power Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Gupta Power Infrastructure Production Manager Interview Questions and Answers

Updated 12 Jul 2023

Gupta Power Infrastructure Production Manager Interview Experiences

1 interview found

Production Manager Interview Questions & Answers

user image NIRBHAY KUMAR

posted on 12 Jul 2023

Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Sharp knowledge about cable production and floor activities
  • Q2. Floor activities, manpower handling skills
  • Q3. Tools knowledge, scrap control process
  • Q4. Skill development, trouble shooter knowledge
Round 3 - HR 

(1 Question)

  • Q1. Personal & professional career

Interview Preparation Tips

Topics to prepare for Gupta Power Infrastructure Production Manager interview:
  • Technical sound be clear
Interview preparation tips for other job seekers - Prepare to very hard interview, work

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Solar cell manufacturing process
  • Ans. 

    Solar cell manufacturing process involves several steps including wafer production, cell processing, and module assembly.

    • Silicon wafers are produced by cutting silicon ingots into thin slices.

    • The wafers are then processed to create the solar cells by adding layers of conductive and anti-reflective materials.

    • The cells are connected and encapsulated to form a solar module.

    • Quality control measures are implemented througho...

  • Answered by AI
  • Q2. Bottleneck elimination
Round 2 - Case Study 

Process improvement in solar cell manufacturing of new technologies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Update new solar technology, optimization
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via AmbitionBox

Round 1 - HR 

(3 Questions)

  • Q1. Production related question ask
  • Q2. Equipment maintenance related question ask
  • Q3. Handle manpower
Round 2 - HR 

(2 Questions)

  • Q1. Production related question ask
  • Q2. Equipment maintenance related question ask

Interview Preparation Tips

Interview preparation tips for other job seekers - Emmvee photovoltaic power very good company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Solar cell manufacturing process
  • Ans. 

    Solar cell manufacturing process involves several steps including wafer production, cell processing, and module assembly.

    • Silicon wafers are produced by cutting silicon ingots into thin slices.

    • The wafers are then processed to create the solar cells by adding layers of conductive and anti-reflective materials.

    • The cells are connected and encapsulated to form a solar module.

    • Quality control measures are implemented througho...

  • Answered by AI
  • Q2. Bottleneck elimination
Round 2 - Case Study 

Process improvement in solar cell manufacturing of new technologies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Update new solar technology, optimization
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Production department Thermal cluster
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basic of air separation, Types of distillation, start up and shut down procedure. Salary expectation

Interview Preparation Tips

Topics to prepare for Bengal Energy Production Engineer interview:
  • Distillation
  • Cryogenic

Gupta Power Infrastructure Interview FAQs

How many rounds are there in Gupta Power Infrastructure Production Manager interview?
Gupta Power Infrastructure interview process usually has 3 rounds. The most common rounds in the Gupta Power Infrastructure interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Gupta Power Infrastructure Production Manager interview?

Some of the top questions asked at the Gupta Power Infrastructure Production Manager interview -

  1. Sharp knowledge about cable production and floor activit...read more
  2. Floor activities, manpower handling ski...read more
  3. Skill development, trouble shooter knowle...read more

Tell us how to improve this page.

Gupta Power Infrastructure Production Manager Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 429 Interviews
KEC International Interview Questions
4.1
 • 295 Interviews
ABB Interview Questions
4.1
 • 230 Interviews
Tata Power Interview Questions
3.9
 • 161 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
ReNew Interview Questions
4.2
 • 86 Interviews
Vestas Interview Questions
4.3
 • 83 Interviews
View all
Gupta Power Infrastructure Production Manager Salary
based on 4 salaries
₹6.2 L/yr - ₹8.1 L/yr
48% less than the average Production Manager Salary in India
View more details

Gupta Power Infrastructure Production Manager Reviews and Ratings

based on 2 reviews

1.7/5

Rating in categories

2.1

Skill development

1.7

Work-life balance

1.4

Salary

2.1

Job security

1.0

Company culture

1.4

Promotions

1.4

Work satisfaction

Explore 2 Reviews and Ratings
Electrical Site Engineer
61 salaries
unlock blur

₹1.6 L/yr - ₹4.1 L/yr

Site Engineer
47 salaries
unlock blur

₹1.5 L/yr - ₹3.8 L/yr

Assistant Project Manager
40 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Project Manager
37 salaries
unlock blur

₹4.4 L/yr - ₹9.5 L/yr

Assistant Manager
33 salaries
unlock blur

₹4 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Gupta Power Infrastructure with

Sterlite Power

4.0
Compare

KEC International

4.1
Compare

Kalpataru Projects International

4.2
Compare

Adani Transmission

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview