i
Gupta Power Infrastructure
Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jul 2022. There were 3 interview rounds.
Top trending discussions
posted on 8 Jul 2024
I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.
Solar cell manufacturing process involves several steps including wafer production, cell processing, and module assembly.
Silicon wafers are produced by cutting silicon ingots into thin slices.
The wafers are then processed to create the solar cells by adding layers of conductive and anti-reflective materials.
The cells are connected and encapsulated to form a solar module.
Quality control measures are implemented througho...
Process improvement in solar cell manufacturing of new technologies.
posted on 20 Jan 2025
I applied via AmbitionBox
posted on 8 Jul 2024
I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.
Solar cell manufacturing process involves several steps including wafer production, cell processing, and module assembly.
Silicon wafers are produced by cutting silicon ingots into thin slices.
The wafers are then processed to create the solar cells by adding layers of conductive and anti-reflective materials.
The cells are connected and encapsulated to form a solar module.
Quality control measures are implemented througho...
Process improvement in solar cell manufacturing of new technologies.
posted on 11 Jun 2024
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Electrical Site Engineer
61
salaries
| ₹1.6 L/yr - ₹4.1 L/yr |
Site Engineer
47
salaries
| ₹1.5 L/yr - ₹3.8 L/yr |
Assistant Project Manager
40
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Project Manager
37
salaries
| ₹4.4 L/yr - ₹9.5 L/yr |
Assistant Manager
33
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Sterlite Power
KEC International
Kalpataru Projects International
Adani Transmission