Power factor improvement involves reducing reactive power and increasing active power to improve efficiency.
Power factor is the ratio of active power to apparent power
Improving power factor reduces energy costs and improves system efficiency
Methods for improving power factor include capacitor banks, synchronous motors, and static VAR compensators
3-phase induction motor slip ring and squirrel cage motor differ in rotor construction and starting torque.
Slip ring motor has external resistors and brushes to control rotor current and torque, while squirrel cage motor has a simple rotor with copper bars.
Slip ring motor has high starting torque and is used in heavy load applications like cranes and elevators, while squirrel cage motor has low starting torque and is u...
Slip ring motors use external resistors for starting and speed control, while squirrel cage motors rely on the number of poles and frequency for speed control.
Slip ring motors have external resistors that are gradually removed to increase speed
Squirrel cage motors rely on the number of poles and frequency for speed control
Slip ring motors are used in applications where high starting torque is required
Squirrel cage moto...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 25 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 11 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
posted on 14 Jul 2021
posted on 15 May 2021
I applied via Company Website and was interviewed in Nov 2020. There was 1 interview round.
Some of the top questions asked at the Gupta Power Infrastructure Electrical Engineer interview -
based on 7 reviews
Rating in categories
Electrical Site Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Project Manager
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterlite Power
KEC International
Kalpataru Projects International
Adani Transmission