Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Gupta Power Infrastructure Team. If you also belong to the team, you can get access from here

Gupta Power Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Gupta Power Infrastructure Assistant Manager Interview Questions and Answers

Updated 25 Feb 2025

Gupta Power Infrastructure Assistant Manager Interview Experiences

1 interview found

Assistant Manager Interview Questions & Answers

user image ARUN KUMAR TRIPATHY

posted on 25 Feb 2025

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your experience in past company

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't even think to join .Reject on first chance.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your self?
  • Q2. Explain your technical competence?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
No response

I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Related previous company

Round 2 - HR 

(2 Questions)

  • Q1. Related documents varification
  • Q2. Personal discussion
Round 3 - Technical 

(1 Question)

  • Q1. About product details

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge sharing with interview questions crack
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Release to work
  • Q2. Release to over all experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Questions related to my field
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Asked about the Solar O&M briefly
  • Q2. Related to job responsibilities

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep update the resume daily in Naukri portal and chances to get more calls from the companies
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About working of switchyard
  • Q2. About transformer and testing
Round 3 - Case Study 

Different practical situation for handling the situation

Interview Preparation Tips

Interview preparation tips for other job seekers - You should prepare for the question based on your skill
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Need references
  • Q2. Reference matters
  • Q3. Reference matters for interview call
Round 2 - Technical 

(1 Question)

  • Q1. Reference matters

I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About plant
  • Q2. Always ready for interview

Interview Preparation Tips

Interview preparation tips for other job seekers - Increase your operation sceal

I applied via campus placement at National Institute of Technology (NIT), Durgapur and was interviewed before Nov 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is a HVDC system?
  • Ans. 

    HVDC stands for High Voltage Direct Current. It is a system used for transmitting high voltage electricity over long distances.

    • HVDC systems are used to transmit electricity over long distances with minimal losses.

    • They are more efficient than traditional AC systems for long-distance transmission.

    • HVDC systems use converters to convert AC power to DC power and vice versa.

    • Examples of HVDC systems include the Itaipu HVDC sy...

  • Answered by AI
  • Q2. What is rectifier
  • Ans. 

    A rectifier is an electronic device that converts AC to DC.

    • Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.

    • They can be made using diodes or other semiconductor devices.

    • Rectifiers are essential for many electronic devices to function properly.

    • Examples of rectifiers include bridge rectifiers, half-wave rectifiers, and full-wave rectifiers.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have patience. Its good to say no if you don't know really. Don't try to make fool

Gupta Power Infrastructure Interview FAQs

How many rounds are there in Gupta Power Infrastructure Assistant Manager interview?
Gupta Power Infrastructure interview process usually has 1 rounds. The most common rounds in the Gupta Power Infrastructure interview process are HR.

Tell us how to improve this page.

Gupta Power Infrastructure Assistant Manager Interview Process

based on 2 interviews

Interview experience

2.5
  
Poor
View more
Gupta Power Infrastructure Assistant Manager Salary
based on 33 salaries
₹4 L/yr - ₹7.5 L/yr
30% less than the average Assistant Manager Salary in India
View more details

Gupta Power Infrastructure Assistant Manager Reviews and Ratings

based on 9 reviews

1.4/5

Rating in categories

1.8

Skill development

1.2

Work-life balance

1.5

Salary

1.1

Job security

1.1

Company culture

1.3

Promotions

1.1

Work satisfaction

Explore 9 Reviews and Ratings
Electrical Site Engineer
61 salaries
unlock blur

₹1.6 L/yr - ₹4.1 L/yr

Site Engineer
47 salaries
unlock blur

₹1.5 L/yr - ₹3.8 L/yr

Assistant Project Manager
40 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Project Manager
37 salaries
unlock blur

₹4.4 L/yr - ₹9.5 L/yr

Assistant Manager
33 salaries
unlock blur

₹4 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Gupta Power Infrastructure with

Sterlite Power

4.0
Compare

KEC International

4.0
Compare

Kalpataru Projects International

4.2
Compare

Adani Transmission

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview