Gupta Power Infrastructure Senior Project Engineer Electrical Interview Questions and Answers

Updated 15 Jun 2022

Gupta Power Infrastructure Senior Project Engineer Electrical Interview Experiences

1 interview found

I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Detailed knowledge about the work execution and technical specifications of the item used in erection and febrication
Round 2 - HR 

(1 Question)

  • Q1. Salary negotiation and availability for joining

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay updated regarding the projects and have good knowledge about the work in all aspects execution as well as billing procedure and documentation also

Interview questions from similar companies

Interview Questionnaire 

6 Questions

  • Q1. What is power?
  • Ans. 

    Power is the rate at which energy is transferred or converted.

    • Power is measured in watts (W).

    • It is calculated by dividing the amount of energy transferred by the time taken.

    • Power can be electrical, mechanical, thermal, or any other form of energy.

    • Examples of power include the electricity used by a light bulb, the horsepower of a car engine, and the heat output of a furnace.

    • Power can be used to do work, such as moving a...

  • Answered by AI
  • Q2. What is consumption?
  • Ans. 

    Consumption refers to the amount of a resource used or taken in by an individual, group, or system.

    • Consumption can refer to the use of electricity, water, or other resources.

    • It can also refer to the amount of food or drink consumed by an individual or group.

    • In economics, consumption refers to the purchase and use of goods and services by individuals or households.

    • Sustainable consumption is a concept that promotes the r...

  • Answered by AI
  • Q3. What is grid?
  • Ans. 

    Grid refers to the interconnected network of power generators, transmission lines, and distribution systems that deliver electricity to consumers.

    • Grid is a complex system of power generation, transmission, and distribution

    • It includes power plants, substations, transformers, and power lines

    • The grid is designed to deliver electricity from power plants to homes and businesses

    • It operates on a large scale, with multiple pow...

  • Answered by AI
  • Q4. What is GSS?
  • Ans. 

    GSS stands for Gas Insulated Switchgear, which is a type of electrical equipment used in power systems.

    • GSS is a compact and reliable solution for high voltage power transmission and distribution.

    • It uses SF6 gas as an insulating and arc-quenching medium.

    • GSS is commonly used in urban areas where space is limited.

    • It is also used in industries such as mining, oil and gas, and renewable energy.

    • GSS requires less maintenance ...

  • Answered by AI
  • Q5. What is energy saving?
  • Ans. 

    Energy saving refers to the practice of reducing energy consumption to conserve natural resources and reduce costs.

    • Energy saving involves using energy-efficient appliances and equipment

    • It also involves adopting energy-saving habits such as turning off lights and unplugging electronics when not in use

    • Renewable energy sources such as solar and wind power can also contribute to energy saving

    • Examples of energy-saving measu...

  • Answered by AI
  • Q6. What is distribution?
  • Ans. 

    Distribution refers to the process of delivering electricity from the transmission system to individual customers.

    • Distribution involves the use of transformers to reduce the voltage of electricity from the transmission system to a level that can be used by households and businesses.

    • Distribution networks typically consist of overhead power lines, underground cables, and substations.

    • Distribution companies are responsible...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask any questions of power sector?

Skills evaluated in this interview

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

3 Questions

  • Q1. Why do you want to join the company
  • Ans. 

    I want to join the company because of its innovative projects and strong company culture.

    • I am impressed by the company's track record of successful projects.

    • I believe the company's values align with my own professional goals.

    • I am excited about the opportunity to work with a talented team of professionals.

    • I see great potential for growth and development within the company.

  • Answered by AI
  • Q2. Why should we choose you
  • Ans. 

    I am a dedicated and hardworking individual with relevant skills and experience.

    • I have a strong work ethic and am committed to delivering high-quality results.

    • I have relevant experience and skills that align with the requirements of the position.

    • I am a quick learner and adaptable to new environments.

    • I am passionate about the industry and eager to contribute to the team.

  • Answered by AI
  • Q3. What profile would you like to like to work in
  • Ans. 

    I would like to work in a marketing and communications profile.

    • Experience in creating marketing campaigns

    • Strong communication skills

    • Ability to analyze market trends and consumer behavior

    • Proficiency in social media and digital marketing

    • Collaboration with cross-functional teams

  • Answered by AI

Interview Preparation Tips

College Name: NIT Kurukshetra

Interview Questionnaire 

1 Question

  • Q1. About Yourself

Interview Preparation Tips

Round: Test
Experience: Test level was medium, as i also sat for mahindra, i found L&T test was harder than mahindra!
Tips: Just study RS agarwal

Round: Group Discussion
Experience: It was easy for me, coz i was aware about tips of GD
Tips: Be the leader, if possibleTalk in between, even if u dont know topic much
Duration: 20 minutes

Round: Interview
Experience: This question was damn easy for me, coz i can talk more based on my activities & resume
Tips: Dont hesitate, stay calm & describe yourself, but not family background

General Tips: Be yourself, no technical knowledge is required(depends on panel u get)
Skill Tips: ""
College Name: IIT Roorkee
Motivation: To get placed!

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Gupta Power Infrastructure Interview FAQs

How many rounds are there in Gupta Power Infrastructure Senior Project Engineer Electrical interview?
Gupta Power Infrastructure interview process usually has 2 rounds. The most common rounds in the Gupta Power Infrastructure interview process are Technical and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 418 Interviews
KEC International Interview Questions
4.0
 • 299 Interviews
ABB Interview Questions
4.1
 • 235 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
ReNew Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.2
 • 83 Interviews
View all
Electrical Site Engineer
61 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
47 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
37 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Project Manager
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Gupta Power Infrastructure with

Sterlite Power

4.0
Compare

KEC International

4.0
Compare

Kalpataru Projects International

4.2
Compare

Adani Transmission

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview