Upload Button Icon Add office photos

Greenko Group

Compare button icon Compare button icon Compare

Filter interviews by

Greenko Group Assistant Manager Interview Questions, Process, and Tips for Experienced

Updated 22 Mar 2025

Top Greenko Group Assistant Manager Interview Questions and Answers for Experienced

View all 7 questions

Greenko Group Assistant Manager Interview Experiences for Experienced

3 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Resume related question.
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion?

Interview Preparation Tips

Interview preparation tips for other job seekers - Requirement process very lag

Assistant Manager Interview Questions & Answers

user image Shubham Giri

posted on 22 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Name Green house gases and their GWP
  • Ans. 

    Greenhouse gases trap heat in the atmosphere, contributing to global warming. Their Global Warming Potential (GWP) varies significantly.

    • Carbon Dioxide (CO2) - GWP of 1, the most prevalent greenhouse gas.

    • Methane (CH4) - GWP of 25, significantly more effective than CO2 over 100 years.

    • Nitrous Oxide (N2O) - GWP of 298, emitted from agricultural and industrial activities.

    • Fluorinated gases - GWP ranges from 1,000 to over 10,

  • Answered by AI
  • Q2. What is EIA, AND STEPS IN EIA
  • Ans. 

    EIA (Environmental Impact Assessment) evaluates the potential environmental effects of proposed projects.

    • 1. Screening: Determine if a project requires EIA. Example: A new highway may need an EIA.

    • 2. Scoping: Identify key issues and impacts to be assessed. Example: Assessing effects on local wildlife.

    • 3. Impact Assessment: Analyze potential environmental impacts. Example: Evaluating air quality changes due to construction...

  • Answered by AI

Assistant Manager Interview Questions Asked at Other Companies for Experienced

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Axis Bank
Q3. How many joint holders we can process in an account in once ?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Numbers,LCM,HCF,Time speed Distance,Percentage

Round 3 - Group Discussion 

They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.

Round 4 - Technical 

(5 Questions)

  • Q1. Types of Concrete & their grades with mix proportion ratio ?
  • Ans. 

    Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.

    • Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)

    • High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3

    • High-performance concrete: designed for specific applications, with mix pro

  • Answered by AI
  • Q2. Steps Involved in concreting & curing ?
  • Ans. 

    Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.

    • Prepare formwork by setting up wooden or metal molds to contain the concrete.

    • Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.

    • Pour the concrete into the formwork, ensuring it reaches all corners and edges.

    • Level the concrete surface using a scre...

  • Answered by AI
  • Q3. Purpose of Retaining Wall ?
  • Ans. 

    Retaining walls are structures designed to hold back soil and prevent erosion.

    • Prevent soil erosion

    • Support sloping terrain

    • Create usable space on a hillside

    • Enhance landscaping design

  • Answered by AI
  • Q4. What is Bending moment & Shear force diagram ?
  • Ans. 

    Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.

    • Bending moment diagram shows the variation of bending moment along the length of a beam.

    • Shear force diagram shows the variation of shear force along the length of a beam.

    • These diagrams are essential for analyzing the behavior of beams under different loading conditions.

    • The diagrams help in determining the maximum bend...

  • Answered by AI
  • Q5. Roles of quantity Surveyor at site & office ?
  • Ans. 

    Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.

    • Preparing cost estimates and budgets

    • Analyzing construction plans and specifications

    • Negotiating with contractors and suppliers

    • Managing contracts and variations

    • Conducting site visits and inspections

    • Preparing progress reports and final accounts

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Greenko Group Assistant Manager interview:
  • Fluid Mechanics
  • Soil Mechanics
  • Quantity Surveying

Interview questions from similar companies

I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer wanted to best knowledge of your profile and your communication skills .

I appeared for an interview in Sep 2020.

Interview Questionnaire 

1 Question

  • Q1. There was many technical and project related questions they asked me.

Interview Preparation Tips

Interview preparation tips for other job seekers - We should prepare for competency as per our core functions
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Your name, qualification & why you want to join organisation
Round 2 - Technical 

(1 Question)

  • Q1. I was hired for condition monitoring roll. It was basic questions with vibration analysis. You should know the basics and case study.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & you should have basis knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are closed loop control system
  • Ans. 

    Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.

    • Closed loop control systems use feedback to maintain a desired output

    • They continuously monitor the output and compare it to the desired input

    • Based on the comparison, adjustments are made to maintain the desired output

    • Examples include thermostat-controlled heating systems and cruise control in cars

  • Answered by AI
  • Q2. Details of Field instruments
Round 3 - Technical 

(3 Questions)

  • Q1. Brief discussion on c&i
  • Q2. How you will handle the situations
  • Q3. What are expecting from us

Interview Preparation Tips

Interview preparation tips for other job seekers - Always prepare in detail what u have written in resume.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. BBS safety ,legal requirements
  • Q2. Training plant safety
  • Q3. Precess safety management
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is channel sales
  • Ans. 

    Channel sales refers to the process of selling products through third-party distributors or partners rather than directly to the end customers.

    • Involves using intermediaries such as wholesalers, retailers, or value-added resellers to reach customers

    • Allows companies to expand their reach and access new markets

    • Requires effective communication and collaboration with channel partners

    • Examples include selling software through...

  • Answered by AI
  • Q2. What is solar on grid system
  • Ans. 

    Solar on grid system is a type of solar power system that is connected to the main electricity grid.

    • Solar panels generate electricity from sunlight

    • Excess electricity can be fed back into the grid

    • Reduces dependency on traditional power sources

    • Commonly used in residential and commercial buildings

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Knowledge about geographic area
  • Q2. Channel sales knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Awesome company and great culture for employee
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Cable type and it's current rating
  • Ans. 

    Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.

    • Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)

    • Current rating is determined by factors such as conductor size, insulation material, and ambien...

  • Answered by AI
  • Q2. What were the costs and other technical parameters, such as the client and scope of work, for your last project?
  • Ans. 

    The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.

    • Client: Company A

    • Scope of work: Development of new software system

    • Cost: $100,000

    • Technical parameters: Integration with existing systems, timeline of 6 months

  • Answered by AI
  • Q3. What are the types of substations and how does a bay function within them?
  • Ans. 

    Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.

    • Types of substations include distribution substations, transmission substations, and switching substations.

    • Distribution substations typically step down voltage for local distribution to customers.

    • Transmission substations step up voltage for long-distanc...

  • Answered by AI

Greenko Group Interview FAQs

How many rounds are there in Greenko Group Assistant Manager interview for experienced candidates?
Greenko Group interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the Greenko Group interview process for experienced candidates are Technical, Resume Shortlist and Aptitude Test.
How to prepare for Greenko Group Assistant Manager interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Greenko Group. The most common topics and skills that interviewers at Greenko Group expect are Electricals, DHCP, DNS, Hydro and Preventive Maintenance.
What are the top questions asked in Greenko Group Assistant Manager interview for experienced candidates?

Some of the top questions asked at the Greenko Group Assistant Manager interview for experienced candidates -

  1. Types of Concrete & their grades with mix proportion rati...read more
  2. What is Bending moment & Shear force diagra...read more
  3. Roles of quantity Surveyor at site & offic...read more

Tell us how to improve this page.

Greenko Group Assistant Manager Interview Process for Experienced

based on 3 interviews

Interview experience

4
  
Good
View more
Greenko Group Assistant Manager Salary
based on 420 salaries
₹2.5 L/yr - ₹10.1 L/yr
21% less than the average Assistant Manager Salary in India
View more details

Greenko Group Assistant Manager Reviews and Ratings

based on 99 reviews

3.5/5

Rating in categories

3.4

Skill development

3.7

Work-life balance

3.0

Salary

4.0

Job security

3.3

Company culture

2.7

Promotions

3.3

Work satisfaction

Explore 99 Reviews and Ratings
Assistant Manager
420 salaries
unlock blur

₹2.5 L/yr - ₹10.1 L/yr

Deputy Manager
268 salaries
unlock blur

₹4.1 L/yr - ₹14.5 L/yr

Officer
237 salaries
unlock blur

₹2 L/yr - ₹9 L/yr

Manager
71 salaries
unlock blur

₹6 L/yr - ₹20 L/yr

Senior Manager
70 salaries
unlock blur

₹7.8 L/yr - ₹30.3 L/yr

Explore more salaries
Compare Greenko Group with

Adani Power

3.9
Compare

ReNew

4.2
Compare

Adani Green Energy

4.1
Compare

Vestas

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview