GMR Energy
20+ Supademo Interview Questions and Answers
Q1. What are the requirements you to check the credibility of qualified bidder?
To check the credibility of a qualified bidder, I would verify their past performance, financial stability, and references.
Verify past performance through reviews and ratings from previous clients
Check financial stability through credit reports and financial statements
Contact references to confirm their experience and reliability
Consider any red flags or warning signs, such as legal issues or negative reviews
Ensure they meet all necessary qualifications and certifications for...read more
Q2. What are the types of Liquidated Damages?
Types of liquidated damages include actual, nominal, and penalty damages.
Actual damages are based on the actual loss suffered by the injured party.
Nominal damages are a small amount awarded when there is a breach of contract but no actual loss suffered.
Penalty damages are a predetermined amount agreed upon in the contract and are meant to punish the breaching party.
Examples of liquidated damages include late fees for rent payments, cancellation fees for events, and damages fo...read more
Q3. How penalties value decided on Liquidated Damages?
Penalties value on Liquidated Damages is decided based on the terms agreed upon in the contract.
Penalties are predetermined in the contract and are based on the estimated damages that may occur due to delay or breach of contract.
The value of penalties may vary depending on the nature of the project and the level of risk involved.
Penalties are usually calculated as a percentage of the contract value or a fixed amount per day of delay.
The purpose of liquidated damages is to com...read more
Q4. What are the criteria for selection of bidder?
Bidders are selected based on their qualifications, experience, financial stability, and proposed solutions.
Qualifications and experience of the bidder
Financial stability and capability to complete the project
Proposed solutions and approach to the project
Reputation and past performance of the bidder
Compliance with legal and regulatory requirements
Competitive pricing
Ability to meet project timelines and deliverables
Q5. What is general procedure of arbitration?
Arbitration is a legal process of resolving disputes outside of court.
The parties involved agree to submit their dispute to an arbitrator or a panel of arbitrators.
The arbitrator(s) listen to both sides and make a decision, which is binding.
Arbitration can be voluntary or mandatory, and can be conducted in person or remotely.
Arbitration can be used in various fields, such as business, labor, and international disputes.
Arbitration can be less expensive and time-consuming than ...read more
Q6. What is general framework of contract ?
A general framework of contract includes offer, acceptance, consideration, and intention to create legal relations.
Offer: A proposal made by one party to another.
Acceptance: An agreement to the terms of the offer.
Consideration: Something of value exchanged between the parties.
Intention to create legal relations: Both parties must intend to create a legally binding agreement.
Example: A contract for the sale of goods or services.
Q7. What is the difference between heard coupling and Fluid Coupling
Heard coupling is a rigid coupling while fluid coupling is a flexible coupling.
Heard coupling is used for high torque applications while fluid coupling is used for smooth acceleration.
Heard coupling has no slippage while fluid coupling has some slippage.
Heard coupling requires precise alignment while fluid coupling can tolerate some misalignment.
Examples of heard coupling include gear couplings and grid couplings while examples of fluid coupling include torque converters and ...read more
Q8. What is Pravantive Maintenance and how is Run Smoothly Plant
Preventive maintenance is a proactive approach to maintenance that involves regular inspections, repairs, and replacements to prevent equipment failure.
Preventive maintenance involves scheduled inspections, cleaning, lubrication, and replacement of parts before they fail.
It helps to reduce downtime, increase equipment lifespan, and improve safety.
Examples of preventive maintenance include changing oil in a car, replacing air filters in HVAC systems, and inspecting machinery f...read more
Q9. 1. What are different types of Turbines? which turbine is used at Different types Heads?
Q10. What is the important of Stacker and Reclamier maintenance
Stacker and Reclaimer maintenance is crucial for ensuring uninterrupted material handling operations.
Regular maintenance of Stacker and Reclaimer equipment ensures smooth functioning and prevents breakdowns.
Proper lubrication, cleaning, and inspection of parts are essential for maintaining the equipment.
Regular monitoring of wear and tear of parts and replacement of damaged parts is necessary to avoid accidents and ensure safety.
Maintenance also helps in improving the efficie...read more
Q11. Why Machine is Vibrating and Heating Templates
Machine vibration and heating can be caused by various factors such as misalignment, unbalanced parts, worn bearings, or inadequate lubrication.
Misalignment of machine parts can cause vibration and heating
Unbalanced parts can also cause vibration and heating
Worn bearings can cause vibration and heating
Inadequate lubrication can cause friction and heating
Excessive load on the machine can cause vibration and heating
Q12. How many drives With Stacker and Reclamier
The number of drives with stacker and reclamier depends on the specific equipment and its configuration.
The number of drives can vary depending on the size and capacity of the stacker and reclamier.
Some stacker and reclamier systems may have multiple drives for redundancy and increased efficiency.
The number of drives may also depend on the type of material being handled and the environmental conditions.
It is important to consult the equipment specifications and maintenance ma...read more
Q13. What's process to reduce of Fomming in Drum?
To reduce foaming in a drum, the process involves adjusting temperature, using anti-foaming agents, controlling agitation, and ensuring proper filling levels.
Adjust temperature to reduce foam formation
Use anti-foaming agents to break down foam
Control agitation to prevent excessive foam buildup
Ensure proper filling levels to avoid overflow and foam creation
Q14. Which typee of dosing in Boiler Drum ?
There are two main types of dosing in Boiler Drum: continuous dosing and intermittent dosing.
Continuous dosing involves adding chemicals continuously to maintain a desired level of treatment in the boiler water.
Intermittent dosing involves adding chemicals at specific intervals to prevent scale and corrosion buildup.
Examples of chemicals used for dosing in Boiler Drum include oxygen scavengers, pH adjusters, and scale inhibitors.
Q15. What is types of Blow down?
Types of blow down include intermittent blow down and continuous blow down.
Intermittent blow down involves manual opening of a valve to release boiler water periodically.
Continuous blow down involves a continuous flow of water from the boiler to remove impurities.
Blow down helps maintain boiler efficiency and prevent build-up of harmful substances.
Examples of impurities removed during blow down include dissolved solids and sludge.
Q16. What is reason for APH sutbolwing?
APH (Antepartum Hemorrhage) is a serious condition during pregnancy where bleeding occurs before the baby is born.
APH can be caused by placental abruption, placenta previa, or uterine rupture.
Symptoms of APH include vaginal bleeding, abdominal pain, and contractions.
Immediate medical attention is required to prevent complications for both the mother and baby.
Q17. What are the Steps of Hydro Power Generation?
Q18. Generation of Power depends on What aspects?
Q19. Qs on Pre Award / Post Award activities
Pre Award / Post Award activities involve tasks related to grant funding before and after the award is received.
Pre Award activities include grant proposal writing, budget development, and submission preparation.
Post Award activities involve grant management, financial reporting, and compliance with grant requirements.
Examples of Pre Award activities: researching funding opportunities, developing project timelines, and collaborating with partners.
Examples of Post Award activi...read more
Q20. Qs on Dispute Resolution / Arbitration
Dispute resolution and arbitration are methods used to settle conflicts outside of court.
Dispute resolution involves resolving conflicts between parties through negotiation, mediation, or arbitration.
Arbitration is a formal process where a neutral third party makes a decision on the dispute, which is binding on both parties.
Arbitration can be less time-consuming and costly than going to court.
Dispute resolution and arbitration clauses are often included in contracts to provid...read more
Q21. Protection and interlock for mft
Protection and interlock are safety measures for MFT.
Protection and interlock systems are designed to prevent accidents and protect equipment from damage.
Interlock systems ensure that equipment cannot be operated unless certain conditions are met.
Examples of interlock systems include emergency stop buttons, safety gates, and light curtains.
Protection systems can include things like overload protection, short circuit protection, and ground fault protection.
MFT (Multi-Function ...read more
Interview Process at Supademo
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month