Filter interviews by
I applied via Approached by Company and was interviewed in Jul 2024. There were 3 interview rounds.
I am currently working on designing and implementing a power distribution system for a large industrial facility.
Designing power distribution layout for the facility
Selecting appropriate electrical components and equipment
Ensuring compliance with safety regulations and standards
Collaborating with other engineers and stakeholders on the project
Primary reasons for major breakdowns in machines include lack of maintenance, overheating, wear and tear, and electrical faults.
Lack of regular maintenance leading to accumulation of dirt and debris
Overheating due to poor ventilation or excessive workload
Wear and tear of components over time causing malfunctions
Electrical faults such as short circuits or power surges
Standard operating procedures for machine maintenance include regular inspections, cleaning, lubrication, and calibration.
Regularly inspect machines for signs of wear and tear
Clean machines to remove dust, debris, and other contaminants
Lubricate moving parts to reduce friction and prevent breakdowns
Calibrate machines to ensure accurate performance
Keep detailed records of maintenance activities and schedules
In-depth discussion about the major and minor breakdowns, including the actions taken.
Project coordinators are responsible for planning, organizing, and overseeing projects from start to finish.
Creating project plans and timelines
Coordinating project team members and resources
Monitoring project progress and ensuring deadlines are met
Communicating with stakeholders and providing updates
Identifying and resolving any issues or risks that arise
Documenting project activities and outcomes
I applied via Approached by Company and was interviewed before Aug 2023. There was 1 interview round.
I change jobs frequently to gain diverse experience, learn new skills, and seek better opportunities.
Seeking new challenges and opportunities for growth
Exploring different industries and roles
Improving skills and gaining diverse experience
Pursuing better compensation or work-life balance
My current package includes a competitive salary, health benefits, and performance bonuses.
Competitive salary
Health benefits
Performance bonuses
The salary offer of 10 lac per annum is competitive for the role of Planning Manager.
Research industry standards for Planning Manager salaries to ensure competitiveness
Consider the cost of living in the area where the job is located
Negotiate for additional benefits or perks if the salary is lower than expected
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
Gmr Airport Developers interview questions for popular designations
posted on 6 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2021. There were 2 interview rounds.
I appeared for an interview in Dec 2016.
Find max path from bottom left to top right in a matrix using only up and right steps.
Start from bottom left corner and move towards top right corner.
At each step, choose the maximum value between the cell above and the cell to the right.
Keep track of the sum of values in the chosen path.
The final sum is the maximum possible sum of values in a path from bottom left to top right.
The most likely number to occur as the final sum is 100.
The sum of the outcomes of the dice rolls will keep increasing until it reaches or exceeds 100.
Since the dice have equal probabilities for each outcome, the sum will have a higher chance of reaching 100.
The probability of rolling a sum greater than 100 decreases as the sum gets larger.
Finding probability of point (1,0) lying in longest cut of three random points on circle of radius 1 centered at (0,0)
The longest cut will be the one that spans the smallest angle between two of the three points
The probability can be found by calculating the area of the region where the longest cut includes point (1,0)
This can be done by finding the angle between (1,0) and the two other points and using trigonometry to...
Find the magic number in a sorted array where value and index are same.
Iterate through the array and check if the value and index are same
If found, return the value
If not found, return -1
Searching an element in a sorted 2D matrix
Start from the top-right corner or bottom-left corner
Compare the target element with the current element
Move left or down if the target is smaller or move right or up if the target is larger
Design a newspaper subscription system
Create a user registration system
Allow users to select subscription plan and payment method
Provide options for delivery frequency and start/end dates
Send reminders for subscription renewal
Allow users to modify or cancel subscription
Track subscription history and payment records
Number of ways to jump n stairs if a person can climb 1 or 2 stairs.
Use dynamic programming to solve the problem.
The number of ways to jump n stairs is equal to the sum of ways to jump n-1 stairs and ways to jump n-2 stairs.
Base cases: if n=0, return 1 and if n=1, return 1.
An LRU cache can be made using a doubly linked list and a hash map.
Create a doubly linked list to store the cache items.
Create a hash map to store the key-value pairs.
When a new item is added, check if the cache is full. If it is, remove the least recently used item from the linked list and hash map.
When an item is accessed, move it to the front of the linked list.
When an item is removed, remove it from both the linked
Probability of winning a dice game where the one with lesser number wins.
The probability of winning depends on the number of sides on the dice.
If the dice has an odd number of sides, the probability of winning is higher for the second player.
If the dice has an even number of sides, the probability of winning is equal for both players.
Compute working days using given functions f, g, and h.
To compute the 3rd working day, apply function g three times to function f.
To compute the 2nd working day of the previous month, apply function h to function f, then apply function g twice.
To compute the 4th working day of the next month, apply function g four times to function f.
I applied via Campus Placement and was interviewed in Dec 2016. There were 3 interview rounds.
based on 9 interviews
Interview experience
based on 129 reviews
Rating in categories
Senior Engineer
123
salaries
| ₹4 L/yr - ₹9.5 L/yr |
Associate Manager
81
salaries
| ₹5 L/yr - ₹13.1 L/yr |
Senior Electrical Engineer
25
salaries
| ₹4.3 L/yr - ₹9 L/yr |
Manager
21
salaries
| ₹10.7 L/yr - ₹17 L/yr |
Senior Civil Engineer
18
salaries
| ₹4.8 L/yr - ₹7.9 L/yr |
BYJU'S
Shapoorji Pallonji Group
Vivo
Hyundai Motor India Limited