Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 18 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.
Determine the valve's operating range and desired set points
Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time
Verify the valve's performance using a flow meter or pressure gauge
Document the calibration process and results for future reference
posted on 5 Jan 2023
There are several types of HVAC systems, including central, split, packaged, ductless, and geothermal.
Central HVAC systems use ducts to distribute air throughout a building
Split systems have separate indoor and outdoor units
Packaged systems have all components in one unit
Ductless systems use individual units in each room
Geothermal systems use the earth's temperature to heat and cool a building
HVAC system is designed to control temperature, humidity, and air quality in a building.
HVAC stands for Heating, Ventilation, and Air Conditioning.
It includes components such as air handlers, ductwork, filters, and thermostats.
The system works by circulating air through the building and adjusting temperature and humidity levels.
It also helps to remove pollutants and maintain air quality.
Examples of HVAC systems include...
posted on 31 Jan 2022
I applied via Naukri.com and was interviewed in Sep 2021. There were 4 interview rounds.
Technical and Aptitude Questions
posted on 27 Jan 2025
Only objective questions little bit tough but all ok
posted on 31 Jan 2022
I appeared for an interview in Jan 2022.
posted on 23 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
I have 8 years of experience in field surveying.
I have 8 years of experience in conducting field surveys for various projects.
I am proficient in using surveying equipment such as total stations and GPS devices.
I have experience in analyzing survey data and creating detailed reports.
I have worked on projects ranging from land development to infrastructure construction.
Yes, I have knowledge in DGPS and Total Station.
I have experience using DGPS for precise positioning in surveying and mapping.
I am familiar with Total Station equipment for measuring angles and distances in surveying.
I have used both DGPS and Total Station in various engineering projects.
I am proficient in data collection and analysis using DGPS and Total Station technology.
My current CTC per month is $10,000 and per year is $120,000.
Current CTC per month: $10,000
Current CTC per year: $120,000
Topography survey is a detailed mapping of the natural and man-made features of a piece of land.
Topography survey involves measuring and mapping the elevation, contours, and features of a land area.
It helps in understanding the terrain, drainage patterns, and existing structures on the land.
Topography surveys are essential for construction projects, land development, and environmental assessments.
Surveyors use speciali...
RL stands for Reinforcement Learning, a type of machine learning where an agent learns to make decisions by interacting with an environment.
RL involves an agent learning to take actions in an environment to maximize some notion of cumulative reward.
It is based on the idea of trial and error learning, where the agent learns from the consequences of its actions.
Examples of RL algorithms include Q-Learning, Deep Q Network
A KMZ file is a compressed version of a KML file used for displaying geographic data in Google Earth.
Create or download a KML file with geographic data
Compress the KML file using a tool like 7-Zip or WinZip
Change the file extension from .zip to .kmz
Open the KMZ file in Google Earth to view the geographic data
The Traverse is a method used in surveying and navigation to move through an area by taking a series of connected measurements and directions.
Traverse involves measuring distances and angles between points to create a connected path.
It is commonly used in land surveying, construction, and navigation.
Traverse can be closed or open depending on whether it returns to the starting point.
Example: A land surveyor uses a trav
Error distribution in a point can be achieved by considering the uncertainty in measurements and applying statistical methods.
Consider the uncertainty in measurements to determine the range of possible values for the point.
Apply statistical methods such as standard deviation to distribute the error around the point.
Use error propagation techniques to calculate the overall error in the point based on the errors in indiv
Total Station is a surveying instrument used for measuring angles and distances to accurately layout areas.
Set up the Total Station at a known point with a clear line of sight to the area to be surveyed.
Calibrate the instrument by leveling it and inputting the necessary parameters such as height and angle.
Measure distances and angles to various points in the area to create a detailed map or layout.
Use the data collecte...
I have 8 years of experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.
8 years experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.
Proficient in using all mentioned surveying instruments.
Experience in conducting precise measurements for various projects.
Skilled in data collection and analysis using these instruments.
Dumpy level, auto level, and digital level are all types of surveying instruments used for measuring horizontal and vertical levels.
Dumpy level is a basic surveying instrument with a telescope and bubble level for measuring horizontal and vertical angles.
Auto level is a more advanced version of a dumpy level that automatically adjusts the line of sight to be horizontal.
Digital level is a modern surveying instrument tha...
posted on 20 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.
posted on 26 Jan 2024
I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.
The question is asking for the Wms of all activities.
Wms stands for Work Measurement System, which is a method used to measure the time and effort required for different activities.
The answer should provide the Wms values for each activity mentioned.
Example: Activity 1 - 5.2 Wms, Activity 2 - 3.8 Wms, Activity 3 - 6.1 Wms
posted on 16 Feb 2023
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 21 reviews
Rating in categories
Senior Engineer
123
salaries
| ₹4 L/yr - ₹9.5 L/yr |
Associate Manager
81
salaries
| ₹5 L/yr - ₹13.1 L/yr |
Senior Electrical Engineer
25
salaries
| ₹4.3 L/yr - ₹9 L/yr |
Manager
21
salaries
| ₹10.7 L/yr - ₹17 L/yr |
Senior Civil Engineer
18
salaries
| ₹4.8 L/yr - ₹7.9 L/yr |
BYJU'S
Shapoorji Pallonji Group
Vivo
Hyundai Motor India Limited