I applied via Naukri.com and was interviewed in Sep 2021. There were 2 interview rounds.
Top trending discussions
After the shortlisting of CVs, list was sent for those who were eligible for the OT. The online test included aptitude + technical. There were pretty easy to moderate questions but time was less.
Quality control tools used in automotive field
Statistical Process Control (SPC) to monitor and control production processes
Failure Mode and Effects Analysis (FMEA) to identify and prevent potential failures
Six Sigma methodology to improve quality and reduce defects
Lean manufacturing to eliminate waste and improve efficiency
Automated inspection systems to detect defects in parts and components
FMEA stands for Failure Mode and Effects Analysis. It is a systematic approach to identify and prevent potential failures in a product or process.
FMEA is used to identify potential failures in a product or process and their effects on the system.
It helps in prioritizing the failures based on their severity, occurrence, and detectability.
FMEA is used in various industries such as automotive, aerospace, healthcare, and m...
7 form waste refers to the seven types of waste in lean manufacturing.
7 form waste is a concept in lean manufacturing that identifies seven types of waste that can be eliminated to improve efficiency and productivity.
The seven types of waste are: overproduction, waiting, defects, overprocessing, excess inventory, unnecessary motion, and unused talent.
Examples of 7 form waste include producing more than what is needed, ...
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
Consumption gap analysis involves identifying and understanding the difference between actual and desired levels of consumption.
Identify the desired level of consumption
Determine the actual level of consumption
Calculate the gap by subtracting the actual level from the desired level
Analyze the reasons for the consumption gap
Identify potential solutions to bridge the gap
Inventory gaps in a system refer to discrepancies or shortages in the quantity or availability of items.
Stockouts: When an item is out of stock and unavailable for purchase or use.
Overstocking: When there is an excess of inventory beyond what is needed or can be sold.
Obsolete inventory: Items that are no longer in demand or have become outdated.
Shrinkage: Loss of inventory due to theft, damage, or other reasons.
Lead ti...
I applied via Recruitment Consultant and was interviewed in Jun 2020. There was 1 interview round.
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.
The beam is placed on a lapping machine with an abrasive surface.
The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.
The process is repeated with finer and finer abrasives until the desired finish is achieved.
Lapping can improve the strength and durability of the beam.
It is comm...
The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.
The number of cube samples may vary depending on the project specifications and requirements.
Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.
The cube samples are taken to test the compressive strength of the concrete.
The number of cube samples may also depend on the locat...
I applied via Walk-in
The SOP (Standard Operating Procedure) of all works is a set of documented instructions that outline the steps to be followed for completing tasks.
SOPs provide consistency and ensure that tasks are performed correctly and efficiently.
They help in training new employees and serve as a reference guide for existing employees.
SOPs can cover various aspects such as safety procedures, quality control, maintenance, and troubl...
DLR stands for Detailed Project Report and DPR stands for Detailed Design Report. They are both important documents in engineering projects.
DLR is prepared before the start of a project and includes detailed information about the project scope, objectives, feasibility, and cost estimates.
DPR is prepared during the design phase of a project and provides detailed information about the design specifications, calculations,...
The quantity achieved is dependent on the manpower available.
The more manpower available, the higher the quantity that can be achieved.
Efficient utilization of manpower can lead to higher productivity.
Manpower shortage can result in lower quantity achieved.
Automation and technology can help in achieving higher quantity with less manpower.
Proper planning and coordination are essential to optimize manpower and achieve de
based on 1 review
Rating in categories
Senior Engineer
124
salaries
| ₹4 L/yr - ₹9.5 L/yr |
Associate Manager
82
salaries
| ₹5 L/yr - ₹12.7 L/yr |
Senior Electrical Engineer
25
salaries
| ₹4.3 L/yr - ₹9 L/yr |
Manager
22
salaries
| ₹10.7 L/yr - ₹17 L/yr |
Senior Civil Engineer
18
salaries
| ₹4.8 L/yr - ₹7.9 L/yr |
Gvk Power & Infrastructure
Adani Enterprises
Reliance Infrastructure
Essar Group