Filter interviews by
I applied via Naukri.com and was interviewed before Jul 2021. There were 3 interview rounds.
Winding wire quantity can be found by calculating the length of wire required and the number of turns needed.
Calculate the length of wire required based on the size of the coil and the number of turns needed.
Determine the wire gauge and calculate the weight of wire required.
Consider the insulation thickness and add it to the wire diameter to get the total diameter of the wire.
Use the formula π x diameter x number of tu...
The standard size of brick is 190mm x 90mm x 90mm.
The size of brick may vary depending on the country or region.
In the United States, the standard size of brick is 203mm x 92mm x 57mm.
Bricks can also come in different shapes and sizes for specific purposes, such as bullnose bricks for rounded edges.
The size of brick affects the amount of mortar needed for construction.
The quantity of cement, sand, and aggregate can be found by using the mix design ratio and the volume of concrete required.
Determine the required volume of concrete
Determine the mix design ratio
Calculate the quantity of cement, sand, and aggregate using the mix design ratio and the volume of concrete
Consider the wastage factor while calculating the quantity
I applied via Approached by Company and was interviewed before Feb 2022. There were 2 interview rounds.
TBM can be transferred by disassembling it into smaller parts and using cranes or other lifting equipment to move them to the desired location.
Disassemble the TBM into smaller components
Use cranes or lifting equipment to move the components
Transport the components to the desired location
Reassemble the TBM at the new location
Quantity of different materials can be calculated by using appropriate formulas and measurements.
Determine the required quantity of each material based on the project specifications
Calculate the volume or weight of each material needed
Use appropriate formulas to calculate the quantity of materials needed
Consider factors such as waste, spillage, and shrinkage when calculating quantities
Examples include calculating the a...
How to manage site, how much strenth of your current team like Manpower, machines etc.
I appeared for an interview in Aug 2020.
Developed a real-time data processing system for a financial institution
Implemented a distributed system using Apache Kafka and Apache Storm
Designed a fault-tolerant architecture with multiple redundancy layers
Optimized the system for high throughput and low latency
Provided real-time monitoring and alerting using Grafana and Prometheus
posted on 14 Oct 2021
I applied via Walk-in and was interviewed before Oct 2020. There were 5 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jun 2019. There were 4 interview rounds.
Answering questions related to Spring Boot and core Java
Spring Boot addons include Spring Security, Spring Data, and Spring Cloud
Spring Boot is a framework for building standalone, production-grade Spring-based applications
Ways of configuring a bean in Spring include XML configuration, Java-based configuration, and annotation-based configuration
Core Java topics include OOP concepts, collections, multithreading, and exc
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Oct 2020. There was 1 interview round.
I applied via Other and was interviewed before Apr 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Site Engineer
8
salaries
| ₹2.8 L/yr - ₹3.6 L/yr |
Field Engineer
3
salaries
| ₹4.2 L/yr - ₹4.2 L/yr |
Civil Site Engineer
3
salaries
| ₹2.4 L/yr - ₹3.9 L/yr |
TCS
Accenture
Wipro
Cognizant