Filter interviews by
Layout coating Shattring
posted on 10 Dec 2021
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
The number of lines going for flat is not provided.
The number of lines going for flat is unknown.
There is no available data to answer this question.
The question does not provide any context or criteria for determining the number of lines.
The number of times tapping during cube casting varies depending on the specific requirements and materials used.
The number of times tapping during cube casting is determined by factors such as the type of concrete mix, desired strength, and casting method.
Tapping is done to remove air bubbles and ensure proper compaction of the concrete.
In general, cube casting may involve tapping the mold multiple times at different ...
The main bar of span is laid by following the design drawings and specifications.
Refer to the design drawings and specifications for the required size and spacing of the main bar.
Ensure that the main bar is placed at the correct depth and alignment.
Use appropriate supports and spacers to maintain the position of the main bar during concrete pouring.
Check for any defects or damages in the main bar before installation.
En...
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
LD for column refers to Liquidated Damages for delay in completing the column construction.
LD stands for Liquidated Damages.
It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.
LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.
The LD amount is usually mentioned in the cont...
The mix ratio of M20 grade of concrete is 1:1.5:3.
The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.
For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.
This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.
For example, if you have 1 bag of cement (50 kg), you would need 1....
The unit weight of steel varies depending on its type and grade.
The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).
The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).
For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).
The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.
Clear cover is important to protect the reinforcement from corrosion and fire.
The clear cover for beams is typically specified in construction drawings or codes.
The clear cover can vary depending on the type of beam and its exposure conditions.
For example, in a residential building, the clear c...
The height of a parapet wall varies depending on its purpose and location.
The height of a parapet wall is typically determined by building codes and regulations.
In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.
In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.
Historical buildings ...
posted on 10 Jul 2024
Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.
Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.
Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...
Aggregate and sand are materials commonly used in construction for creating concrete and mortar.
Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.
Sand is a granular material composed of finely divided rock and mineral particles.
Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.
Examples of aggregate include...
I applied via Naukri.com and was interviewed before Nov 2020. There were 2 interview rounds.
Yes, I have experience in site quality inspection as a Civil Engineer.
I have conducted regular inspections to ensure compliance with quality standards and specifications.
I have reviewed construction plans and specifications to identify potential quality issues.
I have performed tests and measurements to verify the quality of materials and workmanship.
I have documented and reported any non-compliance or quality concerns ...
AFS shuttering size may increase during use due to factors like swelling of wood, moisture absorption, and wear and tear.
AFS shuttering size may increase due to the swelling of wood when it absorbs moisture.
Moisture absorption can cause the wood to expand, leading to an increase in shuttering size.
Wear and tear over time can also contribute to an increase in AFS shuttering size.
Increased shuttering size can affect the ...
I applied via Company Website and was interviewed in Jun 2022. There were 6 interview rounds.
Any qustion test gud
Construction rileted
Kam karne ka tarika
Jo bhi work ho raha ho
Fexibel pevment assignment
posted on 10 Dec 2021
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
The number of lines going for flat is not provided.
The number of lines going for flat is unknown.
There is no available data to answer this question.
The question does not provide any context or criteria for determining the number of lines.
The number of times tapping during cube casting varies depending on the specific requirements and materials used.
The number of times tapping during cube casting is determined by factors such as the type of concrete mix, desired strength, and casting method.
Tapping is done to remove air bubbles and ensure proper compaction of the concrete.
In general, cube casting may involve tapping the mold multiple times at different ...
The main bar of span is laid by following the design drawings and specifications.
Refer to the design drawings and specifications for the required size and spacing of the main bar.
Ensure that the main bar is placed at the correct depth and alignment.
Use appropriate supports and spacers to maintain the position of the main bar during concrete pouring.
Check for any defects or damages in the main bar before installation.
En...
Shift Engineer
4
salaries
| ₹3.2 L/yr - ₹4.2 L/yr |
Civil Supervisor
4
salaries
| ₹2.8 L/yr - ₹9.3 L/yr |
CAR Driver
4
salaries
| ₹0.2 L/yr - ₹2.4 L/yr |
Supervisor
3
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Facility Executive
3
salaries
| ₹2 L/yr - ₹3.6 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group