Yes, I am able to fill measurement books provided by clients.
I have experience in accurately recording measurements and quantities in measurement books.
I am familiar with the format and requirements of measurement books provided by clients.
I ensure all necessary details are included in the measurement book, such as date, location, description of work, measurements, and signatures.
I am proficient in using measurement to...
Rolling margin is the difference between the planned value and the earned value at a specific point in time.
Rolling margin helps in measuring the efficiency of a project by comparing planned and actual progress.
It is calculated by subtracting the earned value from the planned value.
A positive rolling margin indicates that the project is ahead of schedule, while a negative rolling margin indicates that the project is be
Consumption ratios in civil work refer to the quantities of materials used in construction projects.
Consumption ratios vary depending on the type of civil work being done.
Common consumption ratios include cement:sand:aggregate ratios for concrete mixes.
Other consumption ratios may include steel reinforcement ratios for structural elements.
Accurate consumption ratios are essential for cost estimation and project plannin
posted on 30 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
posted on 2 Feb 2024
I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.
posted on 26 Jul 2023
I was interviewed in Jul 2023.
Rolling Margin is the difference between the revenue generated and the variable costs incurred in a specific period.
Rolling Margin helps in determining the profitability of a product or service.
It is calculated by subtracting the variable costs from the revenue for a specific period.
For example, if a product generates $1000 in revenue and the variable costs are $300, the rolling margin would be $700.
It is important for...
Manpower coefficient varies for different construction activities like reinforcement, shuttering, and brickwork.
Manpower coefficient is the ratio of total manpower required to complete a specific task.
It is influenced by factors like complexity of the task, skill level of workers, equipment availability, etc.
For example, reinforcement work may have a higher manpower coefficient compared to brickwork due to the intricat...
posted on 3 Jun 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 17 Jan 2021
I applied via Naukri.com and was interviewed before Jan 2020. There were 3 interview rounds.
posted on 30 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
posted on 26 May 2023
I was selected during my BE last year semester.
based on 1 review
Rating in categories
Site Engineer
32
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Store Executive
14
salaries
| ₹2.6 L/yr - ₹3.1 L/yr |
Senior Engineer
9
salaries
| ₹4.2 L/yr - ₹6.4 L/yr |
Senior Accounts Executive
9
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Civil Site Engineer
9
salaries
| ₹2 L/yr - ₹4.7 L/yr |
Larsen & Toubro Limited
Tata Projects
Reliance Infrastructure
GMR Group