Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by GA Infra Private Limited Team. If you also belong to the team, you can get access from here

GA Infra Private Limited Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 112 Reviews

Filter interviews by

GA Infra Private Limited Civil Site Engineer Interview Questions and Answers

Updated 29 Sep 2023

GA Infra Private Limited Civil Site Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Subjective question are arise

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Documention and paper work

Interview Preparation Tips

Interview preparation tips for other job seekers - Do and doing best option any Wear

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. What was your experience during the interview process?
  • Q2. What are your salary expectations?
  • Q3. Why you last company leave
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Civil engineering
  • Q2. What is a structure
  • Ans. 

    A structure is a system or arrangement of parts that are interconnected and function together to support loads and resist forces.

    • Structures can be man-made or natural

    • They can be made of various materials such as steel, concrete, wood, etc.

    • Examples include buildings, bridges, dams, towers, etc.

  • Answered by AI
  • Q3. Types of Concrete
  • Ans. 

    Types of concrete include ready-mix concrete, precast concrete, reinforced concrete, and shotcrete.

    • Ready-mix concrete is produced in a batching plant and delivered to the construction site in a plastic condition.

    • Precast concrete is cast in a reusable mold or form and cured in a controlled environment before being transported to the construction site.

    • Reinforced concrete contains steel reinforcement bars to increase its ...

  • Answered by AI
  • Q4. Grades of concrete
  • Ans. 

    Grades of concrete refer to the strength of the concrete mix design.

    • Grades of concrete are denoted by M10, M15, M20, etc. where 'M' stands for mix and the number denotes the compressive strength in MPa.

    • Higher grade concrete has higher compressive strength and is used for structural purposes.

    • Common grades include M25, M30, M35, and M40 for heavy-duty structures.

    • The mix proportions vary for different grades of concrete t

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have confidence

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is M30 concrete
  • Ans. 

    M30 concrete is a type of high-strength concrete with a compressive strength of 30 MPa.

    • M30 concrete is commonly used in construction projects that require high strength and durability.

    • It is made by mixing cement, sand, and coarse aggregates in a specific ratio.

    • The ratio of cement, sand, and aggregates in M30 concrete is 1:1:2.

    • M30 concrete is suitable for building structures like bridges, dams, and high-rise buildings.

    • I...

  • Answered by AI
  • Q2. 1 cum rcc weight
  • Q3. What should be the rebar grade
  • Ans. 

    The rebar grade should be selected based on the design requirements and the structural load capacity.

    • The rebar grade is determined by the design engineer based on the structural requirements.

    • The grade of rebar is usually specified in the structural drawings and specifications.

    • The most commonly used rebar grades are 40, 60, and 75.

    • The higher the grade of rebar, the stronger it is and the more load it can bear.

    • The rebar ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always time follow technical specification .

I was interviewed before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is ratio of M25 grade
  • Ans. 

    The ratio of M25 grade concrete is 1:1:2.

    • The ratio of M25 grade concrete is 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for various applications.

    • For example, if you need to make 1 cubic meter of M25 grade concrete, you would need 1/4 cubic meter of cement, 1/4 cubic meter of sand, and 1/2 cubic meter of aggregate.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good management system,salary time to time,
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of beam and column
  • Ans. 

    Designing beams and columns involves determining the size, material, and layout to support the required loads.

    • Consider the type of structure and the loads it will bear

    • Calculate the required dimensions and reinforcement based on structural analysis

    • Select appropriate materials such as steel or concrete

    • Ensure proper connections and detailing for stability and safety

  • Answered by AI
  • Q2. Condition of limit state of servicibility
  • Ans. 

    Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.

    • Limit state of serviceability ensures that a structure remains usable and safe for occupants.

    • It involves checking factors like deflection, vibration, cracking, and durability.

    • For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. About Transformers, CBs, BMs, Railway Switching Station, WTI & OTI etc
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

GA Infra Private Limited Interview FAQs

How many rounds are there in GA Infra Private Limited Civil Site Engineer interview?
GA Infra Private Limited interview process usually has 3 rounds. The most common rounds in the GA Infra Private Limited interview process are HR, Resume Shortlist and Aptitude Test.
How to prepare for GA Infra Private Limited Civil Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at GA Infra Private Limited . The most common topics and skills that interviewers at GA Infra Private Limited expect are Civil Engineering.

Tell us how to improve this page.

GA Infra Private Limited Civil Site Engineer Salary
based on 9 salaries
₹2 L/yr - ₹4.7 L/yr
12% less than the average Civil Site Engineer Salary in India
View more details

GA Infra Private Limited Civil Site Engineer Reviews and Ratings

based on 4 reviews

4.0/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

3.7

Salary

3.7

Job security

3.7

Company culture

3.7

Promotions

3.4

Work satisfaction

Explore 4 Reviews and Ratings
Site Engineer
28 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Store Executive
14 salaries
unlock blur

₹2.6 L/yr - ₹3.1 L/yr

Senior Accounts Executive
9 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Civil Site Engineer
9 salaries
unlock blur

₹2 L/yr - ₹4.7 L/yr

Executive Accountant
8 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Explore more salaries
Compare GA Infra Private Limited with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview