Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.
Types of piles include driven piles, bored piles, and screw piles.
Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.
The diameter of a pile is determined based on the load it needs to support and the soil conditions.
LVUP (Large...
Top trending discussions
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 4 May 2019
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 12 May 2018
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
Some of the top questions asked at the G R Infraprojects Structural Engineer interview for freshers -
based on 1 interview
Interview experience
based on 40 reviews
Rating in categories
Assistant Manager
359
salaries
| ₹4.6 L/yr - ₹11.5 L/yr |
Senior Engineer
227
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Engineer
139
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Deputy Manager
129
salaries
| ₹6.6 L/yr - ₹16 L/yr |
Structural Engineer
122
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Megha Engineering & Infrastructures