Filter interviews by
I applied via Referral and was interviewed before May 2021. There was 1 interview round.
Rubber component design requires consideration of material properties, application requirements, and manufacturing processes.
Identify the application requirements and environmental conditions
Select appropriate rubber material based on properties such as hardness, elasticity, and chemical resistance
Design for manufacturability, considering factors such as mold design and tooling
Consider post-processing requirements such...
To avoid failures in components, I will follow a rigorous testing process and ensure proper maintenance.
Conduct thorough testing of components before installation
Regularly inspect and maintain components to prevent wear and tear
Use high-quality materials and components
Ensure proper installation and alignment of components
Monitor performance and address any issues promptly
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
CFMEA stands for Control Failure Mode and Effects Analysis.
CFMEA is a systematic approach used to identify and mitigate potential failures in a process or system.
It involves analyzing failure modes, their causes, and the potential effects on the process or system.
CFMEA helps in prioritizing and implementing control measures to prevent or minimize failures.
It is commonly used in industries such as manufacturing, automot...
System level DFMEA is given main preference.
System level DFMEA considers the entire system and its interactions.
Component level DFMEA focuses on individual components.
System level DFMEA is more comprehensive and effective in identifying potential failures.
Example: In automotive industry, system level DFMEA would consider the entire vehicle and its subsystems.
Example: In medical devices, system level DFMEA would conside...
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
posted on 30 Jul 2023
I applied via Naukri.com and was interviewed before Jul 2022. There were 4 interview rounds.
I appeared for an interview before May 2023.
I handle overall warehouse operations by implementing efficient processes, optimizing layout, utilizing technology, and managing a skilled team.
Implement efficient processes for receiving, storing, and shipping goods
Optimize warehouse layout for maximum space utilization and easy access to inventory
Utilize technology such as inventory management systems and automation to streamline operations
Manage a skilled team by pr...
JIT/JIS stands for Just-In-Time/Just-In-Sequence, a manufacturing strategy to reduce waste and improve efficiency.
JIT/JIS is a production strategy where materials are delivered to the production line exactly when they are needed.
This helps reduce inventory costs and waste associated with excess inventory.
Just-In-Sequence takes JIT a step further by delivering parts in the exact sequence they are needed for production.
B...
Inventory management involves overseeing the flow of goods from manufacturers to warehouses to retailers, ensuring optimal levels are maintained.
Tracking inventory levels in real-time
Forecasting demand to prevent stockouts or overstocking
Optimizing storage space and organization
Implementing barcode or RFID technology for efficient tracking
Utilizing inventory management software for automation
Managing reorder points and...
ABC class items are inventory items categorized based on their importance and value to the business.
ABC class items are categorized into three groups: A, B, and C.
A class items are the most important and valuable, requiring tight control and frequent monitoring.
B class items are moderately important and valuable, requiring regular monitoring.
C class items are the least important and valuable, requiring minimal monitori...
posted on 5 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
Hoisting is a JavaScript mechanism where variables and function declarations are moved to the top of their scope.
Hoisting applies to variable and function declarations, but not to variable assignments
Function declarations are hoisted before variable declarations
Hoisting can lead to unexpected behavior and should be avoided
posted on 4 Nov 2021
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
posted on 13 Dec 2021
I applied via Naukri.com and was interviewed in Jun 2021. There were 5 interview rounds.
based on 12 reviews
Rating in categories
Production Associate
816
salaries
| ₹3 L/yr - ₹12 L/yr |
Software Engineer
439
salaries
| ₹5.1 L/yr - ₹28.7 L/yr |
Deputy Manager
404
salaries
| ₹15.5 L/yr - ₹36 L/yr |
Team Lead
274
salaries
| ₹4.4 L/yr - ₹16 L/yr |
Financial Analyst
238
salaries
| ₹7.8 L/yr - ₹19.9 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland