Filter interviews by
Top trending discussions
posted on 28 Jul 2024
I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.
To produce maximum output, one must optimize production processes, utilize resources efficiently, and motivate the workforce.
Optimize production processes by identifying bottlenecks and implementing solutions
Utilize resources efficiently by minimizing waste and maximizing utilization
Motivate the workforce by providing incentives, training, and a positive work environment
Yes, I am capable of handling the job pressure and long hours.
I have experience working in high-pressure environments and have developed the ability to manage my time effectively.
I am physically fit and able to stand for long periods of time.
I am willing to work the required hours and days to ensure the job is done efficiently.
I am committed to meeting production targets and ensuring the team is motivated and productiv...
No, it is not advisable to leave without food to achieve a target.
It is important to maintain a healthy and balanced diet to sustain energy levels and productivity.
Skipping meals can lead to fatigue, decreased concentration, and potential health issues.
Taking regular breaks and eating nutritious meals can actually improve productivity in the long run.
Encourage a supportive work environment that promotes work-life balan
posted on 15 Jul 2023
I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
Fuse wire is added in x angel to protect electrical circuits from overloading and short circuits.
Fuse wire is designed to melt and break the circuit when excessive current flows through it.
This helps prevent damage to the electrical components and reduces the risk of fire.
The x angel refers to the specific location in the circuit where the fuse wire is added.
Common examples of x angel locations include fuse boxes, circ
I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.
Challenges in well testing include equipment malfunctions, environmental factors, and data interpretation.
Equipment malfunctions can lead to inaccurate results.
Environmental factors such as weather conditions or nearby activities can affect testing.
Data interpretation can be complex and require specialized knowledge.
Pressure build-up in the well can also pose challenges during testing.
Yield point is the stress at which a material begins to deform plastically.
Yield point is the point on a stress-strain curve where the material transitions from elastic to plastic deformation.
It is the stress level at which a material no longer returns to its original shape after the stress is removed.
Yield point is an important parameter in material testing and design calculations.
For example, in a tensile test, the y...
TPM (Total Productive Maintenance) is a proactive approach to maintenance that aims to maximize equipment effectiveness and minimize downtime.
TPM involves all employees in the maintenance process, focusing on prevention rather than reactive maintenance.
It includes activities such as autonomous maintenance, planned maintenance, and focused improvement.
TPM aims to improve overall equipment effectiveness (OEE) by reducing...
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Referral and was interviewed in Jun 2023. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Java python c++ agile
based on 1 review
Rating in categories
Senior Leader Engineer
287
salaries
| ₹5 L/yr - ₹11.6 L/yr |
Assistant Manager
285
salaries
| ₹6.3 L/yr - ₹18 L/yr |
Lead Engineer
198
salaries
| ₹3.5 L/yr - ₹11.1 L/yr |
Deputy Manager
178
salaries
| ₹7.3 L/yr - ₹20.6 L/yr |
Manager
98
salaries
| ₹8 L/yr - ₹24.5 L/yr |
TK Elevator
Metso Outotec
Sandvik Asia
Caterpillar Inc