I manage my workload by prioritizing tasks and setting realistic deadlines.
I prioritize tasks based on their urgency and importance
I break down larger tasks into smaller, manageable ones
I use a to-do list or project management tool to keep track of tasks and deadlines
I communicate with my team and manager to ensure workload is manageable
I am open to delegating tasks when necessary
For example, when I had multiple p...
Production planning is the process of organizing and coordinating resources to ensure efficient and timely production of goods or services.
It involves determining production goals and objectives
It includes creating a production schedule
It involves allocating resources such as labor, materials, and equipment
It requires coordinating with different departments and stakeholders
It aims to optimize production processes ...
Yes, I am well-versed in AutoCAD and have extensive experience using it.
I have been using AutoCAD for over 5 years
I have completed multiple projects using AutoCAD
I am familiar with various AutoCAD commands and tools
I have received positive feedback from clients and colleagues on my AutoCAD skills
BOM stands for Bill of Materials, which is a list of all the components required to manufacture a product.
BOM is used in manufacturing to ensure that all necessary components are available for production.
It includes information such as part numbers, quantities, and descriptions.
BOM can be created manually or through software programs such as ERP systems.
It is essential for accurate costing, inventory management, a...
A pump is a mechanical device used to move fluids from one place to another. There are various types of pumps including centrifugal, reciprocating, and rotary pumps.
Centrifugal pumps use a rotating impeller to create a flow of fluid.
Reciprocating pumps use a piston or diaphragm to displace the fluid.
Rotary pumps operate by trapping the fluid between rotating components.
Other types of pumps include gear pumps, scre...
CV stands for Curriculum Vitae, GD stands for Group Discussion, and T could refer to various things depending on the context.
CV is a document that summarizes a person's education, work experience, skills, and achievements.
GD is a process where a group of people discuss a topic to arrive at a conclusion or solution.
T could refer to time, temperature, or any other variable depending on the context.
I appeared for an interview in Mar 2025, where I was asked the following questions.
I appeared for an interview in Jan 2025, where I was asked the following questions.
As a Project Engineer, I oversee project planning, execution, and delivery, ensuring quality and efficiency throughout the process.
Manage project timelines and budgets, ensuring resources are allocated effectively.
Collaborate with cross-functional teams to define project scope and objectives, like coordinating with architects and contractors.
Conduct regular site inspections to ensure compliance with safety regulations ...
I applied via Job Fair and was interviewed in Sep 2023. There were 2 interview rounds.
A pump is a mechanical device used to move fluids from one place to another. There are various types of pumps including centrifugal, reciprocating, and rotary pumps.
Centrifugal pumps use a rotating impeller to create a flow of fluid.
Reciprocating pumps use a piston or diaphragm to displace the fluid.
Rotary pumps operate by trapping the fluid between rotating components.
Other types of pumps include gear pumps, screw pum...
I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.
I manage my workload by prioritizing tasks and setting realistic deadlines.
I prioritize tasks based on their urgency and importance
I break down larger tasks into smaller, manageable ones
I use a to-do list or project management tool to keep track of tasks and deadlines
I communicate with my team and manager to ensure workload is manageable
I am open to delegating tasks when necessary
For example, when I had multiple projec...
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Instrumentation related basics
I appeared for an interview before Feb 2024.
I applied via Campus Placement and was interviewed before May 2023. There were 3 interview rounds.
Test with questions related to fluid mechanics, mechanics and materials
I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.
General Aptitude and Fluid Mechanics
Production planning is the process of organizing and coordinating resources to ensure efficient and timely production of goods or services.
It involves determining production goals and objectives
It includes creating a production schedule
It involves allocating resources such as labor, materials, and equipment
It requires coordinating with different departments and stakeholders
It aims to optimize production processes and m...
BOM stands for Bill of Materials, which is a list of all the components required to manufacture a product.
BOM is used in manufacturing to ensure that all necessary components are available for production.
It includes information such as part numbers, quantities, and descriptions.
BOM can be created manually or through software programs such as ERP systems.
It is essential for accurate costing, inventory management, and pr...
Yes, I am well-versed in AutoCAD and have extensive experience using it.
I have been using AutoCAD for over 5 years
I have completed multiple projects using AutoCAD
I am familiar with various AutoCAD commands and tools
I have received positive feedback from clients and colleagues on my AutoCAD skills
Top trending discussions
The duration of Flowserve interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 7 interview experiences
Difficulty level
Duration
based on 416 reviews
Rating in categories
Design Engineer
442
salaries
| ₹3.7 L/yr - ₹9.8 L/yr |
Associate Engineer
112
salaries
| ₹6 L/yr - ₹11.8 L/yr |
Applications Engineer
110
salaries
| ₹4.6 L/yr - ₹14.7 L/yr |
Engineer
100
salaries
| ₹3.2 L/yr - ₹14.5 L/yr |
Assistant Engineer
92
salaries
| ₹2.5 L/yr - ₹11 L/yr |
Caterpillar Inc
Cummins
TechnipFMC
GE Transportation