Filter interviews by
Be the first one to contribute and help others!
posted on 25 May 2024
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
I have extensive experience in creating video content with live-action integration, including working on various projects that required this skill.
I have worked on projects where I had to seamlessly integrate live-action footage with motion graphics to create engaging videos.
I am familiar with techniques such as rotoscoping, green screen keying, and compositing to blend live-action and motion graphics effectively.
I sta...
posted on 27 Aug 2024
I applied via Referral
API Design using Node and Mongo
NodeJs , JavaScript, System Design
posted on 21 Nov 2023
I applied via Naukri.com and was interviewed in Oct 2023. There were 4 interview rounds.
posted on 3 Sep 2023
I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.
Question asked from various topics like simple airthmetic, some Computer related full from, basic of computer and programming. Some question asked from Sql. There are total 32 question, and 4 are subjective type question.
An API (Application Programming Interface) is a set of rules and protocols that allows different software applications to communicate with each other.
APIs define the methods and data formats that applications can use to request and exchange information.
They allow developers to access the functionality of a software application or service without needing to understand its internal workings.
Examples of APIs include Googl...
SDK stands for Software Development Kit, a set of tools and libraries for developing applications for a specific platform or framework.
SDK provides developers with tools, libraries, code samples, and documentation to help them build software applications for a specific platform or framework.
SDKs can include APIs, IDEs, compilers, and other tools necessary for development.
Examples of popular SDKs include Android SDK for...
posted on 23 Jul 2021
I applied via Naukri.com and was interviewed before Jul 2020. There were 2 interview rounds.
posted on 2 Jun 2023
PTR stands for Project Technical Report.
PTR is a document that summarizes the technical aspects of a project.
It includes details such as project scope, objectives, methodology, results, and conclusions.
PTRs are often used to communicate project progress and findings to stakeholders.
LT pole election rule refers to the guidelines and regulations for selecting and installing low tension electrical poles.
LT pole election rule specifies the criteria for selecting the appropriate location for installing low tension electrical poles.
It includes factors such as distance from buildings, roadways, and other structures, as well as soil conditions and accessibility.
Compliance with LT pole election rule ensur...
Coil earthing is a method of grounding electrical systems to prevent electric shock and ensure safety.
Coil earthing involves burying a coil of wire in the ground to create a low-resistance path for electrical currents to flow safely.
The depth at which the coil should be buried depends on factors such as soil type, moisture content, and local regulations.
Proper installation of coil earthing is essential to protect equip...
posted on 21 Nov 2023
I applied via Company Website and was interviewed in May 2023. There were 3 interview rounds.
General knowledge and logical mathematics.
posted on 12 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
Quantitive aptitude and English grammar
posted on 26 Jan 2023
I applied via Campus Placement and was interviewed in Dec 2022. There were 2 interview rounds.
AutoCAD is a computer-aided design software widely used in engineering for creating precise and detailed 2D and 3D drawings.
Creating accurate and detailed technical drawings
Designing and drafting architectural plans
Producing engineering diagrams and schematics
Generating 3D models for visualization and analysis
Creating construction and manufacturing blueprints
Simulating and testing designs before implementation
Collabora...
CAD stands for Computer-Aided Design.
CAD is a technology that uses computer systems to assist in the creation, modification, analysis, or optimization of a design.
It is widely used in various industries such as architecture, engineering, and manufacturing.
CAD software allows designers to create 2D or 3D models of products or structures.
It helps in improving design accuracy, reducing errors, and increasing productivity.
...
Types of fit include clearance fit, interference fit, transition fit, etc.
Clearance fit: parts are intended to have a gap between them, such as a shaft and a hole
Interference fit: parts are intended to be pressed or forced together, such as a bearing and a shaft
Transition fit: parts have both clearance and interference, such as a piston and a cylinder
Other types of fit include force fit, shrink fit, and sliding fit
High pressure die casting is a metal casting process in which molten metal is injected into a steel mold under high pressure.
Molten metal is injected into a steel mold under high pressure
The mold is designed to create complex shapes with high accuracy
The process is used to produce parts with high strength and dimensional accuracy
Commonly used metals include aluminum, zinc, and magnesium
Used in automotive, aerospace, an
based on 9 reviews
Rating in categories
Maintenance Engineer
4
salaries
| ₹3.2 L/yr - ₹3.5 L/yr |
Executive Accountant
4
salaries
| ₹2.7 L/yr - ₹4.1 L/yr |
Service Engineer
3
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Senior Accountant
3
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Sales & Service Engineer
3
salaries
| ₹3 L/yr - ₹3.7 L/yr |
HCL Infosystems
McNally Bharat Engineering
Yalamanchili Software Exports
PIX Transmissions