I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
The size of a concrete cube is typically 150mm x 150mm x 150mm.
Standard size for concrete cube is 150mm x 150mm x 150mm
Used for testing the compressive strength of concrete
Cubes are cast and cured for a specified period before testing
The accuracy of a dumpy level is typically around 1/100th of a foot or 2mm.
The minimum reading that can be taken with a dumpy level is usually around 1/100th of a foot or 2mm.
This level of accuracy is sufficient for most construction and surveying tasks.
Higher quality dumpy levels may have even greater accuracy, down to 1/1000th of a foot or less.
The expiry date of cement is typically around 3 months to 1 year from the date of manufacture.
Cement typically has a shelf life of 3 months to 1 year from the date of manufacture.
The expiry date can vary depending on the type of cement and storage conditions.
It is important to check the packaging for the specific expiry date of the cement.
Using expired cement can lead to weaker concrete and construction issues.
No, adding extra water to hardened concrete will weaken the structure and compromise its integrity.
Do not add extra water to hardened concrete as it will weaken the structure
Consult with a supervisor or engineer for guidance on how to proceed
Consider using additives or accelerators to help with placement if necessary
The expiry date of cement is typically around 3 months to 6 months from the date of manufacture.
Cement typically has an expiry date of 3 to 6 months from the date of manufacture.
The expiry date is important as older cement may not set properly or provide the desired strength.
Factors such as storage conditions and moisture levels can affect the expiry date of cement.
Introduce about yourself and about your achievements
Waterproofing procedure involves surface preparation, application of waterproofing material and quality control measures.
Surface preparation involves cleaning and repairing the surface to be waterproofed.
Waterproofing material can be applied using various methods such as spraying, brushing or rolling.
Quality control measures include checking for leaks and ensuring proper curing of the waterproofing material.
Different t...
Vitrified tiles are of two types - soluble salt and double charge.
Soluble salt vitrified tiles have a pattern that is printed on the surface of the tile and then coated with a layer of liquid glass.
Double charge vitrified tiles have two layers of pigment that are baked together to create a pattern that goes all the way through the tile.
Other types of vitrified tiles include glazed vitrified tiles, full-body vitrified t
Fidesto Projects interview questions for popular designations
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
Materials used in building construction include concrete, steel, wood, brick, and stone.
Concrete is used for foundations, walls, and floors.
Steel is used for structural support and framing.
Wood is used for framing, flooring, and finishing.
Brick is used for walls and facades.
Stone is used for walls, flooring, and decorative features.
Execution is the implementation of work planning. Work planning is the process of creating a plan to achieve a goal.
Execution involves carrying out the tasks outlined in the work plan
Work planning involves identifying the steps needed to achieve a goal
Execution requires following the timeline and budget set in the work plan
Work planning involves considering resources, constraints, and potential obstacles
Example: Work p...
The MS structure rate per 1 SQM varies depending on the type of structure and location.
The rate can range from $50 to $200 per SQM.
Factors that affect the rate include the type of material used, labor costs, and location.
For example, the rate for a steel structure in a rural area may be lower than that of a concrete structure in a city.
It is important to get a detailed quote from a contractor before starting any constr
Rate analysis is the process of determining the rates of various items of work in a construction project.
It involves breaking down the cost of a project into individual components.
It helps in estimating the cost of a project accurately.
It takes into account factors such as materials, labor, equipment, and overhead costs.
For example, rate analysis can be used to determine the cost of laying a foundation, including the c...
posted on 10 Sep 2017
I was interviewed before Sep 2016.
I want to join the company because of its innovative projects and strong company culture.
I am impressed by the company's track record of successful projects.
I believe the company's values align with my own professional goals.
I am excited about the opportunity to work with a talented team of professionals.
I see great potential for growth and development within the company.
I am a dedicated and hardworking individual with relevant skills and experience.
I have a strong work ethic and am committed to delivering high-quality results.
I have relevant experience and skills that align with the requirements of the position.
I am a quick learner and adaptable to new environments.
I am passionate about the industry and eager to contribute to the team.
I would like to work in a marketing and communications profile.
Experience in creating marketing campaigns
Strong communication skills
Ability to analyze market trends and consumer behavior
Proficiency in social media and digital marketing
Collaboration with cross-functional teams
posted on 20 Feb 2015
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 11 May 2018
based on 4 interviews
Interview experience
based on 58 reviews
Rating in categories
Project Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company