  • Q1. What is mimimum grade of concrete of Rcc
  • Ans. 

    The minimum grade of concrete for RCC (Reinforced Cement Concrete) is M20.

    • The minimum grade of concrete for RCC is determined based on the structural requirements and design specifications.

    • The grade of concrete is denoted by the mix ratio of cement, sand, and aggregate.

    • M20 grade concrete means that the mix ratio is 1:1.5:3, where 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.

    • This grade of concr...

  • Answered by AI
  • Q2. Whats is Ratio of M25 and explain M and 25 .
  • Ans. 

    The ratio of M25 refers to the mix proportion of concrete, where M represents the mix and 25 represents the compressive strength of concrete in megapascals (MPa).

    • M25 is a commonly used mix proportion for concrete in construction.

    • The M in M25 stands for mix, indicating the type and proportion of materials used in the concrete mix.

    • The number 25 in M25 represents the target compressive strength of the concrete in megapasc...

  • Answered by AI
  • Q3. What is lapping length and Development length.
  • Ans. 

    Lapping length is the overlap of two reinforcing bars to ensure continuity, while development length is the length required to transfer the stress from the bar to the surrounding concrete.

    • Lapping length is used to maintain the strength and integrity of reinforced concrete structures.

    • It is necessary to provide lapping length to ensure the load is transferred smoothly from one bar to another.

    • The lapping length is typical...

  • Answered by AI
  • Q4. What is development length.
  • Ans. 

    Development length is the length of reinforcement required to transfer the stress from the steel to the surrounding concrete.

    • It is the minimum length of reinforcement bars that must be embedded in concrete to ensure proper bond strength.

    • Development length depends on factors like bar diameter, concrete strength, and type of reinforcement.

    • It is necessary to prevent the steel bars from slipping or pulling out of the concr...

  • Answered by AI
  • Q5. What is ld for M25 and Fe500
  • Ans. 

    ld for M25 and Fe500 is not a standard term in civil engineering.

    • ld is not a standard term in civil engineering

    • It is possible that the interviewer meant to ask for something else

    • M25 and Fe500 are grades of concrete and steel respectively

  • Answered by AI
  • Q6. Ld = 50x dia of bar
  • Ans. 

    The equation Ld = 50x dia of bar relates the development length (Ld) of a reinforcement bar to its diameter.

    • The development length is the length of bar required to transfer the stresses between the reinforcement and the concrete.

    • The equation suggests that the development length is 50 times the diameter of the bar.

    • For example, if the diameter of the bar is 10 mm, the development length would be 500 mm.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepaire fully before attend interview .
And all question askef to you from site .

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Conversation units
  • Q2. Construction procedure

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you sir

Interview Questionnaire 

1 Question

  • Q1. Overall process of finishing like tiling, wall gypsum ,plaster,water proofing , with material praporion and there properties
  • Ans. 

    The finishing process involves tiling, wall gypsum, plaster, and waterproofing with specific material proportions and properties.

    • The first step is to prepare the surface by cleaning and leveling it.

    • Waterproofing is done to prevent water damage to the walls and floors.

    • Gypsum plaster is used to create a smooth surface for painting or wallpapering.

    • Tiling involves laying tiles on the floor or walls using adhesive and grout...

  • Answered by AI

I applied via Referral and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. In technical round they gave me a plan and asked to take quantity of Rcc masonry and plastering

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared and while filling up the first form be extra careful
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Just previous job work
Round 3 - Technical 

(2 Questions)

  • Q1. Afew technical question
  • Q2. Commercial or residential projects in Which I Had worked?

I applied via LinkedIn and was interviewed in Sep 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. IS CODE OF BILLING ABOUT LAST PROJECT SKILL LEARNED
  • Ans. 

    The IS code of billing is a set of guidelines for billing in construction projects.

    • The IS code of billing provides guidelines for measurement and billing of construction work.

    • It covers aspects such as unit rates, quantities, and specifications.

    • It is important for billing engineers to be familiar with the IS code of billing to ensure accurate and fair billing.

    • In my last project, I followed the IS code of billing to ensu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT IN YOURSELF BE TECHNICALLY PREPARED
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. General work experience, background checks and flexibility to work on multiple locations
Round 2 - Aptitude Test 

They have a test paper that you have to fill before meeting MD in final round

Round 3 - One-on-one 

(1 Question)

  • Q1. When can you join?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest in your abilities
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What are the properties of steel and cement. Why steel and cement is used in concrete
  • Ans. 

    Steel is strong, durable, and flexible while cement is a binding material that hardens when mixed with water. They are used in concrete for their complementary properties.

    • Steel is strong and can withstand heavy loads, making it ideal for reinforcing concrete structures.

    • Steel is also flexible, allowing it to bend without breaking under stress.

    • Cement is a binding material that hardens and sets when mixed with water, prov...

  • Answered by AI
  • Q2. What are the types of tests conducted on concrete
  • Ans. 

    Types of tests conducted on concrete include compressive strength test, slump test, and water permeability test.

    • Compressive strength test measures the ability of concrete to withstand loads

    • Slump test measures the consistency and workability of concrete

    • Water permeability test evaluates the durability of concrete against water penetration

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well with basics
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Concrete grade, cement testing
Round 3 - HR 

(1 Question)

  • Q1. Salary discussions
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is quality
  • Ans. 

    Quality is the measure of excellence or superiority of a product or service.

    • Quality is meeting or exceeding customer expectations.

    • It involves consistency, reliability, and conformance to requirements.

    • Quality can be measured through metrics such as defect rates, customer satisfaction, and on-time delivery.

    • Continuous improvement is essential for maintaining and enhancing quality.

    • Examples of quality include a durable smar...

  • Answered by AI
  • Q2. Gd&t

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank
lage raho
kam karte raho

Evercrest Projects Interview FAQs

How to prepare for Evercrest Projects Civil Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Evercrest Projects. The most common topics and skills that interviewers at Evercrest Projects expect are Coordination Skills.
What are the top questions asked in Evercrest Projects Civil Engineer interview?

Some of the top questions asked at the Evercrest Projects Civil Engineer interview -

  1. Whats is Ratio of M25 and explain M and 2...read more
  2. What is lapping length and Development leng...read more
  3. What is mimimum grade of concrete of ...read more

Tell us how to improve this page.

Evercrest Projects Civil Engineer Salary
based on 4 salaries
₹4 L/yr - ₹5.5 L/yr
At par with the average Civil Engineer Salary in India
View more details
Electrical Engineer
8 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Hvac Engineer
7 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Senior Project Engineer
7 salaries
unlock blur

₹3 L/yr - ₹5.5 L/yr

Electrical Project Engineer
6 salaries
unlock blur

₹3 L/yr - ₹4.5 L/yr

Project Engineer Hvac
6 salaries
unlock blur

₹1.5 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Evercrest Projects with

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.0
Compare

S V S Projects India

3.4
Compare

MaRS Planning & Engineering Services

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview