I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.
Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.
Compare the quantity of RMC ordered with the quantity actually used in construction.
Identify any discrepancies and investigate the reasons behind them.
Adjust the records accordingly to ensure accurate billing and
BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.
Calculate the total length of bars required for each diameter and type of reinforcement.
Determine the number of bars required for each diameter and type of reinforcement.
Calculate the total weight of bars required for each diameter and type of reinforcement.
Prepare a detailed schedule...
Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.
Use a paint thickness gauge to measure the thickness of the paint layer.
Compare the measured thickness with the specified thickness in the project specifications.
Ensure that the paint thickness is uniform across the surface.
Repeat the measurements at multiple points to ensure accuracy.
Adjust the paint application if...
Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.
Review project specifications for any missed items or changes
Consult with stakeholders such as architects, engineers, and contractors for input
Conduct site visits to identify any additional work required
Analyze previous change orders to see if any item
Consider JMR based on project specifications, quantities, rates, and market conditions.
Review project specifications to ensure accurate billing
Verify quantities of materials and work done
Check rates for labor, materials, and equipment
Consider market conditions for pricing accuracy
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.
Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.
Compare the quantity of RMC ordered with the quantity actually used in construction.
Identify any discrepancies and investigate the reasons behind them.
Adjust the records accordingly to ensure accurate billing and
BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.
Calculate the total length of bars required for each diameter and type of reinforcement.
Determine the number of bars required for each diameter and type of reinforcement.
Calculate the total weight of bars required for each diameter and type of reinforcement.
Prepare a detailed schedule...
Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.
Use a paint thickness gauge to measure the thickness of the paint layer.
Compare the measured thickness with the specified thickness in the project specifications.
Ensure that the paint thickness is uniform across the surface.
Repeat the measurements at multiple points to ensure accuracy.
Adjust the paint application if...
Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.
Review project specifications for any missed items or changes
Consult with stakeholders such as architects, engineers, and contractors for input
Conduct site visits to identify any additional work required
Analyze previous change orders to see if any item
Consider JMR based on project specifications, quantities, rates, and market conditions.
Review project specifications to ensure accurate billing
Verify quantities of materials and work done
Check rates for labor, materials, and equipment
Consider market conditions for pricing accuracy
Interview experience
Project Engineer
7
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Interior Designer
5
salaries
| ₹2 L/yr - ₹4 L/yr |
Project Coordinator
5
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Billing Engineer
5
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Project Manager
4
salaries
| ₹5.2 L/yr - ₹10.2 L/yr |
LivSpace
Pepperfry
Urban Ladder
HomeLane