Answers to questions related to HVAC systems for Sr. Project Engineer interview.
RH stands for Relative Humidity, which is the amount of water vapor present in air compared to the maximum amount that can be held at that temperature.
U-trap in HVAC unit drain piping prevents sewer gases from entering the building and maintains proper drainage flow.
Types of ducts include rectangular, round, oval, and spiral ducts.
Duct gaug...
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
The minimum grade of concrete for RCC (Reinforced Cement Concrete) is M20.
The minimum grade of concrete for RCC is determined based on the structural requirements and design specifications.
The grade of concrete is denoted by the mix ratio of cement, sand, and aggregate.
M20 grade concrete means that the mix ratio is 1:1.5:3, where 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.
This grade of concr...
The ratio of M25 refers to the mix proportion of concrete, where M represents the mix and 25 represents the compressive strength of concrete in megapascals (MPa).
M25 is a commonly used mix proportion for concrete in construction.
The M in M25 stands for mix, indicating the type and proportion of materials used in the concrete mix.
The number 25 in M25 represents the target compressive strength of the concrete in megapasc...
Lapping length is the overlap of two reinforcing bars to ensure continuity, while development length is the length required to transfer the stress from the bar to the surrounding concrete.
Lapping length is used to maintain the strength and integrity of reinforced concrete structures.
It is necessary to provide lapping length to ensure the load is transferred smoothly from one bar to another.
The lapping length is typical...
Development length is the length of reinforcement required to transfer the stress from the steel to the surrounding concrete.
It is the minimum length of reinforcement bars that must be embedded in concrete to ensure proper bond strength.
Development length depends on factors like bar diameter, concrete strength, and type of reinforcement.
It is necessary to prevent the steel bars from slipping or pulling out of the concr...
ld for M25 and Fe500 is not a standard term in civil engineering.
ld is not a standard term in civil engineering
It is possible that the interviewer meant to ask for something else
M25 and Fe500 are grades of concrete and steel respectively
The equation Ld = 50x dia of bar relates the development length (Ld) of a reinforcement bar to its diameter.
The development length is the length of bar required to transfer the stresses between the reinforcement and the concrete.
The equation suggests that the development length is 50 times the diameter of the bar.
For example, if the diameter of the bar is 10 mm, the development length would be 500 mm.
Top trending discussions
posted on 14 Jan 2025
posted on 29 Nov 2024
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
They are as a friendly asked questions what you did past service as before organization.
Blaming staff without evidence is unprofessional and can damage morale and trust within the team.
Avoid jumping to conclusions without concrete evidence
Encourage open communication and transparency
Focus on problem-solving rather than assigning blame
Provide constructive feedback and support to help staff improve
Lead by example and take responsibility for mistakes
Directors may not always be aware of thefts due to lack of oversight, trust in employees, or focus on other priorities.
Directors may not be directly involved in day-to-day operations where thefts occur
There may be a lack of proper oversight or monitoring mechanisms in place
Directors may trust their employees and not suspect them of theft
Directors may be focused on other strategic priorities and not pay attention to pot
posted on 20 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.
Purchase Assignment - Comparing PO's
posted on 9 Feb 2025
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
based on 2 interviews
Interview experience
based on 56 reviews
Rating in categories
Electrical Engineer
9
salaries
| ₹3.2 L/yr - ₹5 L/yr |
Hvac Engineer
7
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Electrical Project Engineer
6
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Project Engineer Hvac
6
salaries
| ₹1.5 L/yr - ₹7.5 L/yr |
Senior Electrical Engineer
6
salaries
| ₹4.5 L/yr - ₹9.6 L/yr |
Tech Mahindra
TCS
Infosys
Wipro