Upload Button Icon Add office photos

Filter interviews by

Evercrest Projects Interview Questions, Process, and Tips

Updated 12 Sep 2023

Top Evercrest Projects Interview Questions and Answers

View all 7 questions

Evercrest Projects Interview Experiences

Popular Designations

2 interviews found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Question related HVAC, CAC,VRV, HVAC units, AHU/FCU/CSU Valves assembly,valves sequences, and their working..etc
  • Q2. 1-Show me a SLD for typical AHU's Manifold connection.. 2-What is RH? 3-What is the basic concepts about U-trap in HVAV unit drain piping? 4- How many types of ducts? 5- How can we select Duct gauges fo...
  • Ans. 

    Answers to questions related to HVAC systems for Sr. Project Engineer interview.

    • RH stands for Relative Humidity, which is the amount of water vapor present in air compared to the maximum amount that can be held at that temperature.

    • U-trap in HVAC unit drain piping prevents sewer gases from entering the building and maintains proper drainage flow.

    • Types of ducts include rectangular, round, oval, and spiral ducts.

    • Duct gaug...

  • Answered by AI

Senior Project Engineer Interview Questions asked at other Companies

Q1. Types of road:- 1 Flexible pavements .... .. . 2 Rigid pavements Flexible pavement:- embankment thickness 3m,large size soil particles 75mm lumps and cloud. Liquid limit <50% ,plastic limit<25%, swelling and shrnkag<50%, cbr as per... read more
View answer (2)

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What is mimimum grade of concrete of Rcc
  • Ans. 

    The minimum grade of concrete for RCC (Reinforced Cement Concrete) is M20.

    • The minimum grade of concrete for RCC is determined based on the structural requirements and design specifications.

    • The grade of concrete is denoted by the mix ratio of cement, sand, and aggregate.

    • M20 grade concrete means that the mix ratio is 1:1.5:3, where 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.

    • This grade of concr...

  • Answered by AI
  • Q2. Whats is Ratio of M25 and explain M and 25 .
  • Ans. 

    The ratio of M25 refers to the mix proportion of concrete, where M represents the mix and 25 represents the compressive strength of concrete in megapascals (MPa).

    • M25 is a commonly used mix proportion for concrete in construction.

    • The M in M25 stands for mix, indicating the type and proportion of materials used in the concrete mix.

    • The number 25 in M25 represents the target compressive strength of the concrete in megapasc...

  • Answered by AI
  • Q3. What is lapping length and Development length.
  • Ans. 

    Lapping length is the overlap of two reinforcing bars to ensure continuity, while development length is the length required to transfer the stress from the bar to the surrounding concrete.

    • Lapping length is used to maintain the strength and integrity of reinforced concrete structures.

    • It is necessary to provide lapping length to ensure the load is transferred smoothly from one bar to another.

    • The lapping length is typical...

  • Answered by AI
  • Q4. What is development length.
  • Ans. 

    Development length is the length of reinforcement required to transfer the stress from the steel to the surrounding concrete.

    • It is the minimum length of reinforcement bars that must be embedded in concrete to ensure proper bond strength.

    • Development length depends on factors like bar diameter, concrete strength, and type of reinforcement.

    • It is necessary to prevent the steel bars from slipping or pulling out of the concr...

  • Answered by AI
  • Q5. What is ld for M25 and Fe500
  • Ans. 

    ld for M25 and Fe500 is not a standard term in civil engineering.

    • ld is not a standard term in civil engineering

    • It is possible that the interviewer meant to ask for something else

    • M25 and Fe500 are grades of concrete and steel respectively

  • Answered by AI
  • Q6. Ld = 50x dia of bar
  • Ans. 

    The equation Ld = 50x dia of bar relates the development length (Ld) of a reinforcement bar to its diameter.

    • The development length is the length of bar required to transfer the stresses between the reinforcement and the concrete.

    • The equation suggests that the development length is 50 times the diameter of the bar.

    • For example, if the diameter of the bar is 10 mm, the development length would be 500 mm.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepaire fully before attend interview .
And all question askef to you from site .

Top Evercrest Projects Civil Engineer Interview Questions and Answers

Q1. Whats is Ratio of M25 and explain M and 25 .
View answer (3)

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)

Jobs at Evercrest Projects

View all

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. About my past job
  • Q2. About interlinking
  • Q3. Comand area related details
  • Q4. Domestik water related details
  • Q5. Drainage works related works details

Interview Preparation Tips

Interview preparation tips for other job seekers - I will sugest to first discuss time frame of job
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Email marketing, linkedin marketing
Round 2 - One-on-one 

(1 Question)

  • Q1. Situational based question

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

They are as a friendly asked questions what you did past service as before organization.

Round 2 - Technical 

(1 Question)

  • Q1. Asked simple technical questions, related to your experience s .

Interview Preparation Tips

Interview preparation tips for other job seekers - You are needed to prepare according to your role and while interview time ask comfortable salary Expectations keep it in your mind , from beginning you should keep high expectations of salary benefits
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(5 Questions)

  • Q1. Salary why not time being paid ?
  • Q2. Without any evidence how blaming staff ??
  • Ans. 

    Blaming staff without evidence is unprofessional and can damage morale and trust within the team.

    • Avoid jumping to conclusions without concrete evidence

    • Encourage open communication and transparency

    • Focus on problem-solving rather than assigning blame

    • Provide constructive feedback and support to help staff improve

    • Lead by example and take responsibility for mistakes

  • Answered by AI
  • Q3. Company always carried out theft staff ?
  • Q4. No one professional staff in office and overall company ??
  • Q5. Why directors board unseen to thefts??
  • Ans. 

    Directors may not always be aware of thefts due to lack of oversight, trust in employees, or focus on other priorities.

    • Directors may not be directly involved in day-to-day operations where thefts occur

    • There may be a lack of proper oversight or monitoring mechanisms in place

    • Directors may trust their employees and not suspect them of theft

    • Directors may be focused on other strategic priorities and not pay attention to pot

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No body goes to the join these lack group
Hr team non capable and non educated people
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Questioned about Salary expectations
  • Q2. Questioned abut work locations
Round 2 - Technical 

(2 Questions)

  • Q1. Questioned about nature of work in present company
  • Q2. Questioned about ability for role at the company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview process is fast. Virtual interview option is available.
However the HR goes cold once you have been interviewed.
No proper feedback despite multiple attempts to reach. (especially in the case when they have decided not to go ahead with the candidate)
Tough salary negotiation. Bargaining will happen for even as low a difference as Rs. 5000/-
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Assignment 

Purchase Assignment - Comparing PO's

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is the Basic Rule of Purchase
  • Q2. How mant quotations will you take before evaluating
Round 3 - HR 

(2 Questions)

  • Q1. Expectations From the company?
  • Q2. Expected Compensiation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company, You will get experience Letter.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Why I m considered as CFO
  • Q2. Past experiences and values added in last companies
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is responsibility of privious company. How much Col. Erection in site Refinery Experienced
  • Q2. All the sup. Instructions how to work is complete by the my Sr. Manager. All the work are working asper given drawing & designs Weekly meeting for clients & daily Meeting contractor staff. I have release...

Interview Preparation Tips

Topics to prepare for Chatterjee Engineering Mechanical Lead interview:
  • Mechanical Engineering
Interview preparation tips for other job seekers - Company give you offer letter you doesn't join this company. Because doesn't provide tools & tackles. last off months company take bills

Evercrest Projects Interview FAQs

How many rounds are there in Evercrest Projects interview?
Evercrest Projects interview process usually has 2 rounds. The most common rounds in the Evercrest Projects interview process are Resume Shortlist and Technical.
How to prepare for Evercrest Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Evercrest Projects. The most common topics and skills that interviewers at Evercrest Projects expect are Estimation, Ahu, Project Management, Accounting and Costing.
What are the top questions asked in Evercrest Projects interview?

Some of the top questions asked at the Evercrest Projects interview -

  1. Whats is Ratio of M25 and explain M and 2...read more
  2. What is lapping length and Development leng...read more
  3. 1-Show me a SLD for typical AHU's Manifold connection.. 2-What is RH? 3-What ...read more

Tell us how to improve this page.

Evercrest Projects Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
LTIMindtree Interview Questions
3.8
 • 3k Interviews
Mphasis Interview Questions
3.4
 • 804 Interviews
KPIT Technologies Interview Questions
3.4
 • 294 Interviews
View all

Evercrest Projects Reviews and Ratings

based on 56 reviews

4.2/5

Rating in categories

3.9

Skill development

3.6

Work-life balance

3.9

Salary

4.0

Job security

3.9

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 56 Reviews and Ratings
Electrical Engineer
9 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Hvac Engineer
7 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Electrical Project Engineer
6 salaries
unlock blur

₹3 L/yr - ₹4.5 L/yr

Project Engineer Hvac
6 salaries
unlock blur

₹1.5 L/yr - ₹7.5 L/yr

Senior Electrical Engineer
6 salaries
unlock blur

₹4.5 L/yr - ₹9.6 L/yr

Explore more salaries
Compare Evercrest Projects with

Tech Mahindra

3.5
Compare

TCS

3.7
Compare

Infosys

3.6
Compare

Wipro

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview