Filter interviews by
I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.
Base line schedule is the original project plan, while updates are revisions made to the plan. PMC works involve monitoring and controlling project activities.
Base line schedule is the initial project plan that serves as a reference point for comparison.
Updates are changes made to the base line schedule to reflect actual progress and adjustments.
PMC (Project Management Consultant) works involve overseeing project activ...
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
I have a strong technical knowledge about pipeline design, construction, and maintenance.
I am familiar with different types of pipelines such as oil, gas, water, and sewage pipelines.
I have experience in designing pipeline routes, selecting materials, and calculating pressure drops.
I am knowledgeable about pipeline construction techniques, including welding, trenching, and backfilling.
I am skilled in pipeline inspectio...
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction.
It includes information like bar diameter, length, shape, and number of bars required for each structural element.
It helps in estimating the quantity of steel required for a project and ensures that the reinforcement is placed correctly.
It is prepared by a structural engineer or a detailer and is used by the site e...
Concrete is checked at site through various methods to ensure its quality and strength.
Visual inspection of concrete surface
Slump test to check consistency
Compression test to check strength
Ultrasonic testing to detect defects
Core testing to check strength and uniformity
Rebound hammer test to check surface hardness
Temperature monitoring during curing process
Checking for proper mix proportions and curing conditions
Verifi...
Free fall in concrete refers to the process of pouring concrete without any external force to assist in its placement.
Free fall is a method of placing concrete where it is allowed to fall from the mixer truck or pump without any external force.
This method is used for small jobs or in areas where access is limited.
It can result in segregation and air pockets in the concrete if not properly managed.
Free fall height shoul...
Grade of concrete refers to the strength of the concrete mix.
Grade of concrete is denoted by the ratio of cement, sand, and aggregate used in the mix.
The strength of concrete increases with the increase in the grade of concrete.
For example, M20 grade of concrete means the mix contains 1 part cement, 1.5 parts sand, and 3 parts aggregate.
Higher grade of concrete is used for structures that require higher strength, such
Select fill material is a type of soil used to fill in areas where the ground needs to be raised or leveled.
Select fill material is typically composed of clay, sand, and gravel.
It is used in construction projects to create a stable base for buildings, roads, and other structures.
The material is carefully selected and tested to ensure it meets specific engineering requirements.
Examples of select fill material include cr...
Embedded length is the length of a reinforcing bar that is embedded in concrete.
It is the length of a reinforcing bar that is embedded in concrete
It is used to provide anchorage to the reinforcement in the concrete
The length is determined by the diameter of the bar and the strength of the concrete
It is important to ensure that the embedded length is sufficient to prevent failure of the structure
posted on 23 Apr 2024
I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.
posted on 16 Jan 2021
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
I applied via Approached by Company and was interviewed before Mar 2023. There were 4 interview rounds.
posted on 23 Nov 2015
SDLC is a process followed by software development teams to design, develop and test high-quality software.
SDLC consists of several phases including planning, analysis, design, development, testing, deployment, and maintenance.
Each phase has its own set of deliverables and objectives.
SDLC models include Waterfall, Agile, and DevOps.
SDLC helps ensure that software is developed efficiently, on time, and within budget.
SDL...
Different software development models
Waterfall model
Agile model
Spiral model
V-model
Iterative model
RAD model
Prototype model
Incremental model
Waterfall model is a linear sequential approach to software development.
Advantages: clear and well-defined stages, easy to understand and manage, suitable for small projects with stable requirements
Disadvantages: inflexible, difficult to make changes once a stage is completed, testing is done only at the end, not suitable for large or complex projects
Stages: requirements gathering, design, implementation, testing, depl...
Agile is an iterative approach to software development that emphasizes flexibility and customer satisfaction.
Agile involves breaking down projects into smaller, more manageable chunks called sprints.
It prioritizes collaboration between developers, customers, and stakeholders.
It allows for changes and adjustments to be made throughout the development process.
It promotes continuous delivery and improvement.
Advantages ove...
Questions about my project, E-R diagram, C/C++ projects, and software development model used.
Explained my project and its E-R diagram
Shared my experience with C/C++ projects
Discussed the software development model used
Provided examples to support my answers
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Bombardier Transportation
Linfox Logistics
Maharashtra State Road Transport Corporation
Delhi Integrated Multi Modal Transit System