Filter interviews by
Be the first one to contribute and help others!
posted on 24 Dec 2024
I am a dedicated Mechanical Engineer with a strong background in designing and implementing mechanical systems.
Graduated with a degree in Mechanical Engineering from XYZ University
Experienced in CAD software such as AutoCAD and SolidWorks
Worked on projects involving HVAC systems and industrial machinery
Skilled in analyzing and solving complex engineering problems
Strong communication and teamwork skills
I have 5 years of experience in Boiler Turbine, ESP, and BAG FILTER EPCI projects.
5 years of experience in Boiler Turbine projects
Familiar with ESP (Electrostatic Precipitator) systems
Proficient in BAG FILTER EPCI (Engineering, Procurement, Construction, and Installation)
Managed various projects involving Boiler Turbine, ESP, and BAG FILTER systems
Implemented cost-effective solutions for improving efficiency
The erection process of a boiler involves assembling and installing all the components to create a functional boiler system.
Prepare the foundation for the boiler
Assemble the boiler components such as tubes, drums, and headers
Install the boiler on the foundation
Connect the necessary piping and valves
Test the boiler for proper functioning
Boiler pressure parts are typically made of carbon steel, alloy steel, or stainless steel to withstand high pressure and temperature.
Carbon steel is commonly used for lower pressure boilers
Alloy steel is used for higher pressure boilers
Stainless steel is used for corrosion resistance in boilers
Materials must meet specific standards like ASTM A516 for carbon steel
The welding process used in water wall panels is typically TIG welding.
TIG welding is commonly used for water wall panels due to its precision and clean welds
TIG welding helps prevent contamination in the weld area, which is crucial for water wall panels
Other welding processes like MIG welding or submerged arc welding may also be used depending on the specific requirements
Regular maintenance implementations are crucial for ensuring the smooth operation of equipment and preventing costly breakdowns.
Regularly schedule maintenance tasks such as equipment inspections, lubrication, and calibration.
Keep detailed records of maintenance activities and equipment performance to identify trends and potential issues.
Train maintenance staff on proper procedures and best practices to ensure efficient...
posted on 20 Dec 2024
Experienced site supervisor with a background in construction management and a proven track record of successfully overseeing projects.
Over 5 years of experience in site supervision
Strong knowledge of construction processes and safety regulations
Effective communication skills with team members and clients
Managed multiple projects simultaneously, ensuring deadlines were met
Implemented cost-saving measures without compro
I am passionate about leading teams and ensuring projects are completed successfully.
I have a strong background in construction and project management.
I enjoy the challenge of overseeing multiple tasks and problem-solving on site.
I am motivated by the opportunity to mentor and develop team members.
I thrive in fast-paced environments and am dedicated to delivering high-quality results.
My strengths include strong leadership skills, excellent communication abilities, and a proactive approach to problem-solving.
Strong leadership skills
Excellent communication abilities
Proactive approach to problem-solving
One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.
I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.
I have difficulty delegating tasks as I prefer to handle things on my own to ensure they are done correctly.
I can be overly self-critical, which can affect my confidence in certain situations.
I applied via Company Website and was interviewed in Nov 2024. There were 3 interview rounds.
I am interested to Aptitude test
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I applied via campus placement at University Institute of Technology, Bhopal
IGBT is a power semiconductor device used for switching applications in power electronics.
IGBT combines the advantages of MOSFET and BJT transistors
It has high input impedance like a MOSFET and low on-state voltage drop like a BJT
Used in applications like motor drives, inverters, and power supplies
Power electronics devices are electronic components used to control and convert electrical power.
Power diodes: used for rectification in power supplies
Thyristors: used for switching and control in high power applications
Power transistors: used for amplification and switching in power circuits
IGBTs (Insulated Gate Bipolar Transistors): used in high power applications like motor drives
MOSFETs (Metal-Oxide-Semiconductor F...
I am a recent graduate with a degree in engineering and a passion for problem-solving and innovation.
Recent graduate with a degree in engineering
Passionate about problem-solving and innovation
Strong communication and teamwork skills
Experience with technical projects and internships
In two years, I see myself taking on more responsibilities and contributing significantly to the team's projects.
Continuing to learn and grow in my role as an Assistant Engineer
Taking on more complex projects and tasks
Building strong relationships with colleagues and stakeholders
Possibly pursuing further education or certifications to enhance my skills
Seeking opportunities for advancement within the company
posted on 4 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.
posted on 20 Nov 2024
Relevant area synapses of preparation through PPT
based on 5 reviews
Rating in categories
Jakson Group
ReNew
Vestas
Wind World