i
ReNew
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.
Seeking new challenges and growth opportunities.
Looking for a company that aligns better with my career goals.
Desire to work on more complex projects.
Seeking a better work-life balance.
Company downsizing or restructuring.
Limited opportunities for advancement or professional development.
Relocation or personal reasons.
posted on 4 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.
There are several types of testing performed in transformers.
Routine testing: performed during manufacturing to ensure the transformer meets specifications.
Type testing: performed on a sample transformer to verify its design and performance.
Special testing: performed for specific requirements or conditions, such as temperature rise testing or impulse testing.
Diagnostic testing: performed to assess the condition of a tr...
A transformer double pole structure is a configuration that includes two poles in a transformer.
A transformer double pole structure is used to increase the voltage capacity of a transformer.
It consists of two separate poles, each with its own primary and secondary windings.
The primary windings of both poles are connected in parallel, while the secondary windings are connected in series.
This configuration allows for hig...
The current carrying capacity of AB cable refers to the maximum amount of electrical current that the cable can safely carry.
The current carrying capacity depends on factors such as the cable's size, material, insulation, and ambient temperature.
It is important to consider the cable's ampacity rating and derating factors for different installation conditions.
AB cable is typically used for overhead power distribution an...
posted on 15 Mar 2023
I applied via Naukri.com and was interviewed in Feb 2023. There was 1 interview round.
I was interviewed in Aug 2022.
Handled projects with power capacity up to 500 MW
Managed electrical design and installation for power plants with capacity up to 500 MW
Oversaw testing and commissioning of electrical systems for large-scale industrial projects
Implemented energy-efficient solutions to optimize power usage and reduce costs
Collaborated with cross-functional teams to ensure project timelines and budgets were met
posted on 24 Feb 2023
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Hazardous classification refers to the categorization of substances or environments based on their potential to cause harm or danger.
Hazardous classification is used to identify and communicate the level of risk associated with different substances or environments.
It helps in determining the appropriate safety measures and precautions to be taken.
Classification criteria include factors such as flammability, explosivene...
Electrical codes play a crucial role in lighting design, ensuring safety, efficiency, and compliance.
Electrical codes provide guidelines for the installation, wiring, and operation of lighting systems.
They specify the minimum requirements for electrical components, such as switches, fixtures, and wiring methods.
Codes address issues like proper grounding, circuit protection, and voltage limitations to prevent electrical...
posted on 30 May 2024
I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Jul 2023. There were 6 interview rounds.
LOTO stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work.
LOTO involves locking the energy isolating devices with an assigned individual lock and tag to prevent the machine from being turned on.
Types of LOTO include electrical LOTO, mechanical LOTO, and pneumatic LOTO.
Examples of LOTO ...
Normal discussion with seniors
posted on 3 Nov 2022
Different types of cable trays include ladder, perforated, solid bottom, wire mesh, and trough.
Ladder cable trays have horizontal cross members resembling a ladder.
Perforated cable trays have small holes for ventilation and drainage.
Solid bottom cable trays have a solid base for supporting cables.
Wire mesh cable trays have a grid-like structure for easy cable installation.
Trough cable trays have a U-shaped design for c
The rule of cable laying involves proper planning, routing, securing, and labeling of cables to ensure safety and efficiency.
Plan the cable routes to avoid interference with other systems or equipment.
Secure cables properly to prevent damage or accidents.
Label cables clearly for easy identification and maintenance.
Follow local regulations and standards for cable laying practices.
Consider factors like cable length, bend...
Anticarsia gemmatalis, also known as the velvetbean caterpillar, is a common pest in agriculture.
Anticarsia gemmatalis is a species of moth in the family Erebidae.
It is a major pest of soybean crops, feeding on the leaves and causing significant damage.
Control measures for velvetbean caterpillars include biological control agents, insecticides, and crop rotation.
Monitoring for early signs of infestation can help preven
General Arrangement drawings show the overall layout of electrical systems in a building or structure.
GA drawings provide an overview of the entire electrical system layout
They include details such as equipment locations, cable routing, and connection points
These drawings are essential for understanding the overall design and installation of electrical systems
Examples of GA drawings include floor plans with electrical ...
Machine , transmission and distribution
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
based on 11 reviews
Rating in categories
Assistant Manager
391
salaries
| ₹5.6 L/yr - ₹14.5 L/yr |
Deputy Manager
311
salaries
| ₹7.5 L/yr - ₹25.5 L/yr |
Senior Engineer
285
salaries
| ₹4.4 L/yr - ₹10.2 L/yr |
Engineer
261
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Manager
178
salaries
| ₹8.3 L/yr - ₹28 L/yr |
Adani Green Energy
Azure Power
Hero Future Energies
Acme Cleantech Solutions