i
ReNew
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 6 Oct 2021
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
Stator winding process involves winding copper wire around the stator core to create an electromagnetic field.
The stator core is made up of laminated steel sheets to reduce eddy current losses.
The copper wire used for winding is insulated to prevent short circuits.
The winding process can be done manually or by using automated machines.
The number of turns and wire gauge used for winding depends on the design specificati...
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
I appeared for an interview in Oct 2017.
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
25 QUESTIONS.
MODERATE
Initial setting time of cement is the time taken by cement to harden and resist penetration by a standard needle.
Initial setting time is affected by factors like temperature, water-cement ratio, and type of cement.
The standard needle used for testing has a diameter of 1.13 mm and a length of 50 mm.
The initial setting time of ordinary Portland cement is around 30 minutes.
The initial setting time of rapid hardening cemen
Lime test stone test brick test
posted on 25 Jan 2025
I appeared for an interview in Jul 2024.
I applied via Walk-in and was interviewed in Jan 2024. There were 7 interview rounds.
Electrical work in solar energy involves designing, installing, and maintaining electrical systems for solar power generation.
Designing and sizing solar power systems
Installing solar panels and inverters
Connecting solar panels to the electrical grid
Troubleshooting and repairing electrical issues in solar systems
Performing regular maintenance and inspections
Ensuring compliance with safety regulations and standards
Electrical equipment and field all activities
Electrical AC DC work field involves working with both alternating current (AC) and direct current (DC) in electrical systems.
AC (alternating current) is the type of electrical current commonly used in homes and businesses, while DC (direct current) is used in batteries and electronic devices.
AC current periodically changes direction, while DC current flows in only one direction.
In electrical work, understanding and wo...
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
I have 2 years of experience in the wind field.
I have worked on wind turbine design and optimization projects.
I have conducted wind resource assessments for potential wind farm sites.
I have experience in analyzing wind data and performing wind flow modeling.
I have knowledge of wind energy conversion systems and their components.
I have worked with software tools like WindPRO and WAsP for wind energy analysis.
based on 2 interviews
Interview experience
based on 15 reviews
Rating in categories
Assistant Manager
385
salaries
| ₹6 L/yr - ₹15.5 L/yr |
Deputy Manager
316
salaries
| ₹7.5 L/yr - ₹23 L/yr |
Senior Engineer
292
salaries
| ₹3.9 L/yr - ₹10.2 L/yr |
Engineer
240
salaries
| ₹2.8 L/yr - ₹7.8 L/yr |
Manager
170
salaries
| ₹11.2 L/yr - ₹30 L/yr |
Adani Power
Adani Green Energy
Vestas
Jakson Group