I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Projects and resume
  • Q2. Take me through your resume
  • Q3. Tell me about your project

Internship Trainee Interview Questions asked at other Companies

Q1. Tell about your UG project? How will you design a table for 1 tonne load and what are all the consideration needed for it? Tell the Equations you know in strength of Materials? What are manufacturing processes involved to fabricate ball bea... read more
View answer (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to work CVT in transmission line
  • Q2. Working of wave trap
Round 2 - HR 

(2 Questions)

  • Q1. Testing of transformer
  • Q2. What is PRV
Round 3 - Technical 

(2 Questions)

  • Q1. About lighting arrester
  • Q2. Line shutdown related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good but I have not completed my Bachelor degree that's why..............
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2024. There were 7 interview rounds.

Round 1 - Group Discussion 

One to one meeting i will aspects

Round 2 - HR 

(5 Questions)

  • Q1. One to one meeting
  • Q2. Disscuss to my profile
  • Q3. Self-help and work details
  • Q4. Know complete details about me
  • Q5. Knowing the details of my works
Round 3 - Aptitude Test 

Any one i will aspects

Round 4 - Aptitude Test 

Any one i will accpected

Round 5 - Assignment 

Project discussion for some ones

Round 6 - Assignment 

Any ons disscuss of project worth

Round 7 - Assignment 

Both are i will according test

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing but work placed for ROTN only
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Can you describe your past work experiences and professional profile?
  • Q2. How did you influence customers?
  • Q3. What key takeaways did you gain from your previous job?
  • Q4. What is the reason for your decision to change jobs?
  • Q5. What were your cost to company (CTC) and perks in your previous employment?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare thoroughly regarding past achievements that are quantitative, and study well about the job opening for which the interview is being organized.

8pn Interview Questions & Answers

Adani Power user image Uttam Goswami

posted on 5 Jan 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Apna Jobs and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. ITI Electrishyan Halfar and operator and Solar plant power plant
  • Q2. ITI Electrishyan Halfar and operator and Solar plant power plant
  • Q3. ITI Electrishyan
Round 2 - ITI Electrishyan Halfar and 

(2 Questions)

  • Q1. ITI Electrishyan Halfar and operator and Solar plant power plant
  • Q2. ITI Electrishyan Halfar and operator and Solar plant power plant

Interview Preparation Tips

Interview preparation tips for other job seekers - ITI Electrishyan Halfar and operator and Solar plant power plant
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Costs control assessment
  • Q2. Best teem management
  • Q3. Daily MIS data analysis
  • Q4. Regular maintenance implementations
  • Ans. 

    Regular maintenance implementations are crucial for ensuring the smooth operation of equipment and preventing costly breakdowns.

    • Regularly schedule maintenance tasks such as equipment inspections, lubrication, and calibration.

    • Keep detailed records of maintenance activities and equipment performance to identify trends and potential issues.

    • Train maintenance staff on proper procedures and best practices to ensure efficient...

  • Answered by AI
  • Q5. Customer service representative

Interview Preparation Tips

Interview preparation tips for other job seekers - Majer aactive responsibility
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Rejection analysis
  • Q2. Measurement system analysis
Round 2 - Technical 

(2 Questions)

  • Q1. Failure mode effects analysis
  • Q2. Controlling mathod
Round 3 - Technical 

(2 Questions)

  • Q1. Statistics process control
  • Q2. Instrument measurement
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself",
  • Ans. 

    Experienced site supervisor with a background in construction management and a proven track record of successfully overseeing projects.

    • Over 5 years of experience in site supervision

    • Strong knowledge of construction processes and safety regulations

    • Effective communication skills with team members and clients

    • Managed multiple projects simultaneously, ensuring deadlines were met

    • Implemented cost-saving measures without compro

  • Answered by AI
  • Q2. Why do you want this job?
  • Ans. 

    I am passionate about leading teams and ensuring projects are completed successfully.

    • I have a strong background in construction and project management.

    • I enjoy the challenge of overseeing multiple tasks and problem-solving on site.

    • I am motivated by the opportunity to mentor and develop team members.

    • I thrive in fast-paced environments and am dedicated to delivering high-quality results.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. What are your strengths?
  • Ans. 

    My strengths include strong leadership skills, excellent communication abilities, and a proactive approach to problem-solving.

    • Strong leadership skills

    • Excellent communication abilities

    • Proactive approach to problem-solving

  • Answered by AI
  • Q2. What are your weaknesses?
  • Ans. 

    One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.

    • I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.

    • I have difficulty delegating tasks as I prefer to handle things on my own to ensure they are done correctly.

    • I can be overly self-critical, which can affect my confidence in certain situations.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Week in interview but Not For Work that's my Wiknase or Strength 👍
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. What will you do if your senior doesn’t tell you technical facts of project, management wants you to perform from day 1.
  • Q2. What will you do if 70% of work given to you is a documentation work for next 2 years?
  • Ans. 

    I would prioritize and efficiently manage the documentation work while also finding ways to automate or streamline the process.

    • Prioritize tasks based on importance and deadlines

    • Look for opportunities to automate or streamline documentation processes

    • Delegate tasks if possible to ensure efficiency

    • Maintain clear communication with team members and stakeholders

    • Seek feedback and continuously improve documentation quality

  • Answered by AI
  • Q3. Interviewer was rude and peculiar in his behaviour
  • Q4. Interviewer (Pradeep Biradar) did not had the intention for recruitment. He was demoralising about the position and the company.

Interview Preparation Tips

Interview preparation tips for other job seekers - I was interviewed with Eaton by Pradeep Birader. He introduced himself as some manager. Twice interview was postponed. Later in the interview Mr. Pradeep Biradar started showing his true colour with absolutely absurd questions.

What happens if someone senior in the company doesn’t share technical facts, what will you do??? Management wants you to deliver from first day! All such absurd and nonsense question.

Then he switched his question, what if 70% documentation work given to you for next 2 years, what will you do?
Obviously management should know this better!


All kind of baseless and nonsense questions from the interviewer. Do not know authenticity and credibility of these person. As if he is coming from a roadside slum.

My answer was clear, if someone not willing to share technical details of project than leadership should take care of this. If 70% of documentation work is there, you must hire a technical writer.

Then clearly I showed my disinterest for this position!

This is how some incompetent and incredible people spoils good positions and working culture of good companies.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Yes i am interested to HR Interview
Round 2 - Technical 

(2 Questions)

  • Q1. Yes i am also interested to TECHNICAL interview
  • Q2. Sir I tell u everything About AUTO bussing machine
Round 3 - Aptitude Test 

I am interested to Aptitude test

Interview Preparation Tips

Interview preparation tips for other job seekers - Working with M/s Jackson Engineers Ltd. (Greater Noida ) As a Bussing
Machine Operator Since May 2024 to till now.

Dytech power Solutions Interview FAQs

How many rounds are there in Dytech power Solutions interview?
Dytech power Solutions interview process usually has 2 rounds. The most common rounds in the Dytech power Solutions interview process are Resume Shortlist and One-on-one Round.

Tell us how to improve this page.

People are getting interviews through

based on 1 Dytech power Solutions interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 199 Interviews
Adani Group Interview Questions
3.9
 • 175 Interviews
NTPC Interview Questions
4.2
 • 157 Interviews
Tata Power Interview Questions
3.9
 • 156 Interviews
Suzlon Group Interview Questions
4.1
 • 123 Interviews
Torrent Power Interview Questions
3.8
 • 121 Interviews
Eaton Corporation Interview Questions
4.0
 • 114 Interviews
GE Vernova Interview Questions
4.1
 • 85 Interviews
Vestas Interview Questions
4.3
 • 81 Interviews
View all

Dytech power Solutions Reviews and Ratings

based on 7 reviews

3.0/5

Rating in categories

2.7

Skill development

3.0

Work-Life balance

2.3

Salary & Benefits

2.3

Job Security

2.7

Company culture

2.4

Promotions/Appraisal

2.9

Work Satisfaction

Explore 7 Reviews and Ratings
Senior Mechanical Design Engineer
4 salaries
unlock blur

₹8.9 L/yr - ₹10.2 L/yr

Channel Manager
3 salaries
unlock blur

₹5.8 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Dytech power Solutions with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

NTPC

4.2
Compare

Adani Group

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview