I applied via Company Website and was interviewed in Nov 2022. There were 3 interview rounds.
Half an hour duration.Site related questions.
Workability of concrete refers to its ease of mixing, placing, and compacting.
Workability is affected by water content, aggregate size and shape, and admixtures.
A concrete mix with good workability will be easy to place and compact, resulting in a smooth finish.
However, if the mix is too workable, it may be prone to segregation and bleeding.
Longitudinal cracks on concrete pavements can be caused by a variety of factors...
Hollow blocks are commonly used in construction as they are lightweight, durable and provide good insulation.
Hollow blocks are made of concrete with hollow cores.
They are used for walls, partitions, and fences.
They are lightweight and easy to handle, reducing construction time and labor costs.
Hollow blocks provide good insulation, reducing energy costs for heating and cooling.
They are durable and resistant to fire, pes...
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I am currently working at a construction site in downtown city.
Construction site in downtown city
Working on a high-rise building project
Coordinating with architects, contractors, and workers
Ensuring adherence to safety regulations and project timelines
I appeared for an interview before Mar 2024, where I was asked the following questions.
As a Site Engineer, I managed construction activities, ensured quality control, and coordinated with various stakeholders on-site.
Oversaw daily construction operations, ensuring adherence to project timelines and safety regulations.
Conducted regular site inspections to monitor progress and quality, addressing any issues promptly.
Collaborated with architects and contractors to interpret blueprints and implement design s...
Cube casting samples involves specific procedures to ensure accurate testing of concrete strength as per IS codes.
Prepare the concrete mix as per design specifications.
Use clean, non-absorbent molds for casting cubes, typically 150mm x 150mm x 150mm.
Fill the molds in layers, compacting each layer to eliminate air pockets.
Level the surface of the concrete and cover the molds with a damp cloth or plastic to prevent moist...
Round was quite easy, for mechanical they had turbo machinery and heat transfer questions and basic SOM,TOM,MD,MF
Lifts work on the principle of pulleys and counterweights while ACs work on the principle of refrigeration.
Lifts use a motor to move a counterweight that balances the weight of the lift car and its occupants.
ACs use a compressor to compress and expand refrigerant gas to absorb and release heat.
Types of ACs include window ACs, split ACs, central ACs, and portable ACs.
Window ACs are mounted on windows and cool a single r...
Aptitude test like mathematics question ,reasoning & our department like mechanical engineer
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I have extensive field experience in water supply works including construction of OHTs, MS DI HDPE Pipe laying, HSCs Intake head works Jackwel.
Experience in constructing Overhead Tanks (OHTs) for water storage
Expertise in laying MS DI HDPE pipes for water supply
Proficient in constructing Head Works Jackwel for water intake
Skilled in constructing High Service Reservoirs (HSCs) for water storage
based on 1 interview
Interview experience
based on 10 reviews
Rating in categories
Civil Site Engineer
41
salaries
| ₹2 L/yr - ₹5 L/yr |
Site Engineer
31
salaries
| ₹1.5 L/yr - ₹4.6 L/yr |
Project Engineer
21
salaries
| ₹3 L/yr - ₹7 L/yr |
Store Officer
16
salaries
| ₹3 L/yr - ₹5.6 L/yr |
Project Manager
14
salaries
| ₹3 L/yr - ₹8 L/yr |
JLL
CBRE
NoBroker
Lodha Group