i
DRA Homes
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
Construction in civil
Accounting related general level test
DRA Homes interview questions for popular designations
I applied via Company Website and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jan 2023. There were 2 interview rounds.
DMC method is a pile foundation technique that involves driving piles into the ground using a drop hammer.
DMC stands for Drop Hammer Compaction method.
It is a commonly used technique in civil engineering for constructing pile foundations.
In this method, a pile is driven into the ground using a drop hammer, which is lifted and then dropped onto the pile.
The repeated impact of the drop hammer compacts the soil around the...
Waterproofing methodology involves various techniques to prevent water penetration and damage to structures.
Identify the source of water leakage or potential areas of water penetration
Select appropriate waterproofing materials based on the type of structure and water exposure
Prepare the surface by cleaning and repairing any cracks or damages
Apply waterproofing membranes or coatings to create a barrier against water
Ensu...
Cement and steel consumption for slab depends on the design, dimensions, and load requirements.
Cement consumption is determined by the thickness of the slab and the mix design.
Steel consumption is influenced by the span, load capacity, and reinforcement requirements.
For example, a 100mm thick slab may require around 0.5 cubic meters of cement per square meter.
Steel consumption can vary from 0.5% to 2% of the total slab...
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
I applied via Naukri.com and was interviewed before Dec 2022. There were 5 interview rounds.
Group discussion with the vice President
I applied via Referral and was interviewed before Dec 2022. There were 2 interview rounds.
Top trending discussions
Interview experience
based on 278 reviews
Rating in categories
Project Engineer
12
salaries
| ₹4 L/yr - ₹6 L/yr |
Sales Manager
9
salaries
| ₹5.8 L/yr - ₹8 L/yr |
Assistant Manager
7
salaries
| ₹4 L/yr - ₹6.8 L/yr |
Site Engineer
6
salaries
| ₹2 L/yr - ₹8 L/yr |
Senior Executive
6
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF