I applied via Recruitment Consultant and was interviewed before Sep 2020. There was 1 interview round.
posted on 14 Jan 2022
I applied via Walk-in and was interviewed before Jan 2021. There were 3 interview rounds.
The least count of staff reading is the smallest measurement that can be read and recorded using the staff.
The least count is determined by the smallest division on the staff scale.
It is usually expressed in millimeters or centimeters.
For example, if the smallest division on the staff scale is 1 mm, then the least count is 1 mm.
The least count is important in accurately measuring and recording distances in civil engine
posted on 27 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 1 Jan 2020
Shutting working refers to the process of closing or shutting down a construction site or specific area for maintenance, repairs, or safety reasons.
Shutting working involves temporarily stopping all construction activities in a designated area.
It is done to ensure the safety of workers and the public, as well as to carry out necessary maintenance or repairs.
During shutting working, access to the area is restricted, and...
GFl stands for Ground Fault Locator.
GFl is a device used to locate ground faults in electrical systems.
It helps in identifying the exact location of the fault, which can be crucial for maintenance and repair work.
By measuring the flow of current and voltage, GFl can pinpoint the area where the electrical current is leaking to the ground.
It is commonly used in industries, construction sites, and power distribution syste...
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 3 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
Common welding processes include MIG, TIG, Stick, and Flux-Cored welding.
MIG (Metal Inert Gas) welding uses a wire electrode and shielding gas to join metal.
TIG (Tungsten Inert Gas) welding uses a tungsten electrode and filler metal to join metal.
Stick welding uses a consumable electrode coated in flux to join metal.
Flux-Cored welding uses a wire electrode with a flux core to join metal.
Other common welding processes i...
Tests conducted on welding joints
Visual inspection
Dye penetrant testing
Radiographic testing
Ultrasonic testing
Magnetic particle testing
Tensile testing
Bend testing
Submerged arc welding is a process where an arc is maintained between a consumable electrode and the workpiece under a blanket of granular flux.
The process is used for welding thick sections of steel.
The granular flux shields the weld from atmospheric contamination.
The consumable electrode is continuously fed into the weld pool.
The process is commonly used in shipbuilding, pipeline construction, and pressure vessel fab
Defected welding joints can be rectified through a process of cutting, grinding, and rewelding.
Identify the type and extent of the defect
Cut out the defected portion of the joint
Grind the edges of the remaining joint to prepare for rewelding
Reweld the joint using appropriate welding techniques and materials
Perform non-destructive testing to ensure the quality of the repaired joint
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Mechanical Supervisor
15
salaries
| ₹5.9 L/yr - ₹10.3 L/yr |
HSE Officer
9
salaries
| ₹6 L/yr - ₹18 L/yr |
Piping Supervisor
7
salaries
| ₹1 L/yr - ₹9.6 L/yr |
Rigging Supervisor
5
salaries
| ₹3.6 L/yr - ₹18 L/yr |
Safety Officer
5
salaries
| ₹1 L/yr - ₹4 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies