(2 Questions)

  • Q1. Quality engineer best performance
  • Q2. Self dependent achieve your goals

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to building &infrastructure execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Detail execution process, billing related issue, contractor issue, material problem, hr related queries, technical interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Q2. What are the activities, you have handled
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Start to bottom rcc work up to finishing work
  • Q2. Finishing sequence(block work- concild zari -waterproof work-concild piping, electrical work- internal gypsum., dado work, painting work

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience of building &infrastructure execution work

Interview Questionnaire 

1 Question

  • Q1. Quality related questions
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Half an hour duration.Site related questions.

Round 3 - One-on-one 

(2 Questions)

  • Q1. What is workability of concrete???? What makes a bulding green building? Why do longitudinal cracks develop on concrete pavements???
  • Ans. 

    Workability of concrete refers to its ease of mixing, placing, and compacting.

    • Workability is affected by water content, aggregate size and shape, and admixtures.

    • A concrete mix with good workability will be easy to place and compact, resulting in a smooth finish.

    • However, if the mix is too workable, it may be prone to segregation and bleeding.

    • Longitudinal cracks on concrete pavements can be caused by a variety of factors...

  • Answered by AI
  • Q2. What do you know about hollow blocks used in construction???
  • Ans. 

    Hollow blocks are commonly used in construction as they are lightweight, durable and provide good insulation.

    • Hollow blocks are made of concrete with hollow cores.

    • They are used for walls, partitions, and fences.

    • They are lightweight and easy to handle, reducing construction time and labor costs.

    • Hollow blocks provide good insulation, reducing energy costs for heating and cooling.

    • They are durable and resistant to fire, pes...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident ,straight forward, easy going and respectful

Interview Questionnaire 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?
  • Ans. 

    I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.

    • Internship at ABC Engineering Firm

    • Focused on project management and design

    • Hands-on experience gained

  • Answered by AI

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

I applied via Referral and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous project breif and some technical from fire protection system and electrical.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview it was good and the most important thing i was shared a true answer regarding previous project, i will very thankfull to mr.kunal sharma who has shared my resume to cushman.tx....

DLF Services Interview FAQs

How many rounds are there in DLF Services Structure Site Engineer interview?
DLF Services interview process usually has 1 rounds. The most common rounds in the DLF Services interview process are Technical.

Tell us how to improve this page.

DLF Services Structure Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 362 Interviews
CBRE Interview Questions
4.2
 • 267 Interviews
NoBroker Interview Questions
3.2
 • 235 Interviews
Lodha Group Interview Questions
4.0
 • 128 Interviews
Colliers India Interview Questions
3.9
 • 67 Interviews
K Raheja Corp Interview Questions
4.3
 • 46 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
SMEC Interview Questions
3.8
 • 26 Interviews
View all
Deputy Manager
6 salaries
unlock blur

₹10 L/yr - ₹15 L/yr

Fire & Safety Officer
6 salaries
unlock blur

₹2.5 L/yr - ₹4 L/yr

Senior Manager
5 salaries
unlock blur

₹16 L/yr - ₹20 L/yr

Manager
4 salaries
unlock blur

₹14.5 L/yr - ₹16 L/yr

Receptionist
4 salaries
unlock blur

₹1.5 L/yr - ₹3 L/yr

Explore more salaries
Compare DLF Services with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.2
Compare

Lodha Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview