i
Diamondpick
Filter interviews by
Top trending discussions
A box segment can be made by cutting a box into two parts along one of its faces.
Choose a face of the box to cut along
Use a saw or knife to cut through the box along the chosen face
Sand the edges of the cut to smooth them out if necessary
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Core Java is a programming language that supports OOPs concepts such as inheritance, encapsulation, abstraction, and polymorphism.
Core Java is an object-oriented programming language.
It supports encapsulation, which means hiding the implementation details of an object from the outside world.
Inheritance allows a class to inherit properties and methods from another class.
Abstraction is the process of hiding complex imple...
Docker is a containerization platform that allows developers to package and run applications in isolated environments. Kubernetes is an open-source container orchestration system that automates deployment, scaling, and management of containerized applications.
Docker allows developers to create and run applications in containers, which are lightweight and portable environments that can run on any machine with Docker ins...
To see log of a complete request in docker, use docker logs command.
Use 'docker logs
Use '-f' flag to follow the logs in real-time
Use '--tail' flag to specify the number of lines to show from the end of the logs
Use '--since' and '--until' flags to specify a time range for the logs
Use '--timestamps' flag to show timestamps in the logs
I applied via Naukri.com and was interviewed before Feb 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
The manpower required to complete a plan depends on the scope, complexity, and timeline of the project.
Manpower requirements can vary based on the size and complexity of the project.
Consider the skills and expertise needed for each task in the plan.
Factor in the timeline and deadlines for completing the plan.
Utilize project management tools to estimate manpower needs accurately.
Example: A large-scale construction proje...
Column and beam sizes are determined by the load they need to support and the span they need to cover.
The size of the column and beam is determined by the load they need to support and the span they need to cover.
The material used for the column and beam also affects their size.
The size of the column and beam can be calculated using structural engineering software.
For example, a 20-foot span with a load of 10,000 pound...
I will assess the severity of the void and determine the appropriate course of action.
Conduct a thorough inspection of the structure to determine the size and location of the void
Evaluate the potential impact of the void on the structural integrity of the building
Determine the appropriate repair method based on the severity of the void and the type of structure
Consult with structural engineers and other experts as need...
I applied via Referral and was interviewed before Mar 2021. There was 1 interview round.
I applied via LinkedIn and was interviewed before Aug 2021. There were 2 interview rounds.
I was interviewed in Jan 2025.
Power project work& infra
Exception with responsibility refers to handling unexpected situations while still being accountable for the outcome.
Acknowledge the issue and take ownership of finding a solution
Communicate effectively with stakeholders about the situation
Learn from the experience to prevent similar issues in the future
based on 1 interview
Interview experience
Information Technology Recruiter
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Executive
109
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Recruitment Executive
95
salaries
| ₹0 L/yr - ₹0 L/yr |
US IT Recruiter
89
salaries
| ₹0 L/yr - ₹0 L/yr |
Recruitment Executive
68
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lease
Innovsource Services
IMPACT Infotech
Teamware Solutions