3 Questions

  • Q1. How many kinds of piping.
  • Ans. 

    There are several types of piping used in various industries, including process piping, utility piping, and plumbing piping.

    • Process piping is used to transport fluids or gases in industrial processes.

    • Utility piping is used for services such as water, steam, or compressed air.

    • Plumbing piping is used for water supply and drainage systems in buildings.

    • Other types of piping include fire protection piping, gas piping, and r

  • Answered by AI
  • Q2. If any body have experience of construction, how to,get shut down experience.
  • Ans. 

    Shut down experience can be gained by working on projects that involve plant shutdowns or turnarounds.

    • Look for job opportunities in industries that require shutdowns, such as oil and gas, petrochemicals, and power plants.

    • Volunteer to work on shutdown projects to gain experience.

    • Attend training courses and workshops on shutdown management.

    • Network with professionals in the industry to learn about upcoming shutdown projec...

  • Answered by AI
  • Q3. Where did used DSS Pope.
  • Ans. 

    I'm sorry, but I cannot answer this question as it does not make sense.

    • The question seems to be incomplete or incorrect.

    • There is no context or information provided to understand what is being asked.

    • Please provide more details or rephrase the question.

  • Answered by AI

I applied via Recruitment Consultant and was interviewed in Dec 2018. There were 9 interview rounds.

Interview Preparation Tips

General Tips: Sir, I here write my opinion for shotlist After interview system wife serial &atap wise attend the interview.Who was taken my interview by telephone .I will will attenen freely &given answer talented.
Thanks
Skills: Communication, Analytical Skills, Leadership, Presentation Skills, Time Management
Duration: <1 week

Piping Supervisor Interview Questions Asked at Other Companies

asked in ADNOC
Q1. If we have to replace bypass valve on top of vessel and plant is ... read more
Q2. How to check hydro test on heat exchanger
asked in ADNOC
Q3. What is difference between concentric and eccentric reducer
asked in Oil India
Q4. What is different between iso and P&ID diagram. What's codes ... read more
Q5. How will you install the pipe/equipment material in plant?

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Piping related question
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 6 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Quality tool box talk safe work on site

Round 3 - Coding Test 

Piping metal code cs,SS,ltcs and alloys

Round 4 - Technical 

(4 Questions)

  • Q1. How much group work in side
  • Q2. Civil, mechanical, electrical
  • Q3. All work place clean and safe
  • Q4. Permit after work start
Round 5 - Group Discussion 

All types of piping fabrication and erection installation in site

Round 6 - One-on-one 

(1 Question)

  • Q1. All reports submit in hr department

I appeared for an interview before Oct 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - QC engineer 

(6 Questions)

  • Q1. Dlc . Pqc club test beam testing GSA FSI gradetion soil testing CBR Slum testing DBM BC
  • Q2. PQC DLC DBM BC SOIL TESTING
  • Q3. Cor citing pqc dlc leing
  • Q4. Site testing lab testing plant testings
  • Q5. FDD site testing. Cor citing
  • Q6. Cement testing initial testing final

Interview Preparation Tips

Interview preparation tips for other job seekers - QC engineer job to civil engineer to work DBL air port project to Rajkot

I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is cost to complete
  • Ans. 

    Cost to complete refers to the estimated amount of money required to finish a project or task.

    • Cost to complete is an important metric used in project management and quantity surveying.

    • It takes into account the remaining work, resources, and expenses needed to complete a project.

    • It helps in assessing the financial status of a project and making informed decisions.

    • Cost to complete can be calculated by subtracting the act...

  • Answered by AI
  • Q2. Unit weight of various steel bars
  • Ans. 

    Unit weight of steel bars varies based on their diameter and length.

    • The weight of steel bars is measured in kilograms per meter (kg/m).

    • The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.

    • For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your technical knowledge and basic strong and be confident

I applied via Referral and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. How to do Rate analysis ?
  • Ans. 

    Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.

    • Identify the item or activity to be analyzed

    • Determine the quantity of materials and labor required

    • Calculate the cost of materials and labor

    • Add overhead costs and profit margin

    • Divide the total cost by the quantity to get the unit rate

    • Compare the rate with market rates to ensure competitiveness

  • Answered by AI
  • Q2. What are the components to be considered in the Rate analysis?
  • Ans. 

    Components to be considered in Rate analysis

    • Cost of materials

    • Cost of labor

    • Cost of equipment

    • Overhead expenses

    • Profit margin

    • Taxes and duties

    • Transportation costs

    • Wastage and spoilage

    • Contingencies

    • Productivity rates

    • Market rates

    • Inflation rates

  • Answered by AI
  • Q3. Documents required to certify Final bill
  • Ans. 

    The documents required to certify the final bill as a Quantity Surveyor.

    • Contract documents

    • Measurement records

    • Variation orders

    • Payment certificates

    • Final account statement

    • As-built drawings

    • Completion certificates

    • Test reports

    • Subcontractor invoices

    • Material invoices

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Both Technical & Contract knowledge is required. Prepare for the same.

I appeared for an interview in Aug 2017.

Interview Questionnaire 

2 Questions

  • Q1. Salary offer
  • Q2. Technical Question

Interview Preparation Tips

Round: HR Interview
Experience: They are offer salary upto 14,500 AED Only.

Round: HR Interview
Experience: I can't work with in that much offering salary with family staying and children studying.

Round: Technical + HR Interview
Experience: Interview success but salary not satisfy .

Skills: Technical Skill And Speaking Skill

Interview Questionnaire 

1 Question

  • Q1. What's your experience?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What was your previous salary what is your expect
  • Ans. 

    I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.

    • My previous salary is confidential and I am unable to disclose it.

    • I am expecting a salary that is commensurate with my qualifications and experience.

    • I am open to discussing salary expectations during the negotiation process.

    • I believe that a competitive salary is importa...

  • Answered by AI
  • Q2. Previous salary 1 expected salary 2 whatever.
  • Q3. Educational mass card certificate documents previous salary certificate if you worked

Interview Preparation Tips

Interview preparation tips for other job seekers - Before going to interview take your food eat well don't be scared that person also a human

Descon Engineering Interview FAQs

What are the top questions asked in Descon Engineering Piping Supervisor interview?

Some of the top questions asked at the Descon Engineering Piping Supervisor interview -

  1. If any body have experience of construction, how to,get shut down experienc...read more
  2. How many kinds of pipin...read more
  3. Where did used DSS Pop...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 119 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
View all
Descon Engineering Piping Supervisor Salary
based on 10 salaries
₹5 L/yr - ₹17 L/yr
16% more than the average Piping Supervisor Salary in India
View more details

Descon Engineering Piping Supervisor Reviews and Ratings

based on 11 reviews

3.4/5

Rating in categories

3.6

Skill development

3.4

Work-life balance

2.9

Salary

3.2

Job security

3.7

Company culture

2.6

Promotions

3.5

Work satisfaction

Explore 11 Reviews and Ratings
Safety Officer
37 salaries
unlock blur

₹3 L/yr - ₹9.6 L/yr

Mechanical Supervisor
27 salaries
unlock blur

₹4.5 L/yr - ₹16 L/yr

HSE Supervisor
17 salaries
unlock blur

₹5.6 L/yr - ₹20 L/yr

HSE Officer
16 salaries
unlock blur

₹3 L/yr - ₹12.8 L/yr

Planning Engineer
12 salaries
unlock blur

₹10 L/yr - ₹38.2 L/yr

Explore more salaries
Compare Descon Engineering with

Alstom Transportation

3.7
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare

AtkinsRealis

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview